Loading...
WA9601-CS 960615 68/21/1996 14:58 21436182,.1~4 SHIMEK, J~COBS&FINKLE PAGE 62/62 Page 1 of SHIMEK, JACOBS & FINKLEA ProjectNo. 96133 CONSULTING ENGINEERS Client: City of Coppelt Page No. 1 Project: Proposed Water Distribution System Improvements Date: 06115/96 By: PAC ENGINEER'S OPINION OF CONSTRUCTION COST Item No. J ....... ' ...... Desc~ri_ption . ~ ...... Quantity I Unit I Pa:ice Amount I Furnish and Install 24" PVC Waterline and Embedment 12,800 LF _. $65.00 $832,0.0.0 2 Furnish and install 2__~4'.' Butterfly Valves 7 EA _..$9,000.00 $63,009.00 3 Connect to Ex, isting 16" Waterline._s.. 2 EA .........$1,000.00 $2,009.00 4 Furnish and Install Fire Hydrants and Valve 26 EA $2,000.00 $52,000.00 5 DesicJn, Furn.!.sh and install Trench Safety 12,800 LF ..... $2.00 $25,600.00 Subtotal $974,600.00 Contingencies...~, 15% $146, 190.00 __ _E~Ln.e. gring @ 10% $~ '~ 2,079.00 TOTAL: $'1 t232r869.00