Loading...
Cambridge Phase 1-LR 940927G IEOTECHNICAL E I NGINEERING E INVIRONMENTAL GEE Consultants, Inc. 2540 Glenda Lane Suite 108 Dallas, Texas 75229 (214) 620-9791 • Fax (214) 620-9794 REPORT OF CONCRETE MIX INSPECTION Report Dace: September 27, 1994 Date Concrete Placed: September 19, 1994 Standard 6"x12" Client: Beamer Development Corporation Ama 28.27 Square Inches Project: Estates of Cambridge Manor, Phase I Concrete Report No.: 12 Contractor: Griffith Construction Concrete Supplier and Plant: Lattimore Materials Co. /Plant #3 Location of Placement: Storm Water Inlets MATERIALS ~~°,`;~„ ~°~ uYd "' INSPECTION DATA Mix Number: 38 Time Sample Batched: 3:00 pm Cement: 5 sk Time Sampled: 3:50 pm Sample Location: Castle Creek Drive Station 0+80 Fly Ash: Truck/Ticket No: 456/3006367 Coarse Aggregate: Temperature: Intermediate Aggregate: Ambient Range: 90°F Fine Aggregate: Concrete Range: °F Slump Range (inches): S'/a Admixtures: Weather Conditions: Clear 1 - Time Started: 2:30 pm 2 Time Completed: 4:50 pm Added Water: 10 gallons Sample Air Content (%): No test Total Cubic Yards Placed: 7.0 ' Required Strength (Lbs./sq.in.): 3,000 Specivren Ntaaber Measured Slump (in.) Age (Days) Date Tcsted Taal load (Lbe.) Compressive Strength (Lbe./Sq.ln.) Retnarb ECM 34 5'~ 7 09/26/94 79,480 2,810 ECM 35 5; 28 10/17/94 91,220 3,230 ECM 36 5~ 28 10/17/94 107,820 3,810 Test Methods Util-vcd Fraawe Regular Cylinders Made By: G . H . ASCM C-31,C-39,C-143 (Unless Noted Otherwise) Remarks andlor Distribution: cc: Bill Anderson -Dowdy, Anderson and Associates, Inc. Larry Davis -City of Coppell GSE Consultants, Inc. Reviewed by: All ktrcrs and rcporls arc for the exclusive the of the clknt to whom they are addressed and shall trot be teprodttoed without the full approval of GEE Consultants, Inc. The rue of our ttame must rcrzive our prior written approval. Ottr ktten and rcporu apply only to the sample tested atd/a impeded std are not nccrssarily hdiwtive of the quanlitiea of apparcn[ly identical or similar products.