Loading...
Cambridge Phase 2-LR 961223 (3)EOTECH N ICAL GEE Consultants, Inc. 10046 Monroe Drive · Dallas, Texas 75229 · (214) 352-5433 · Fax (214) 352-6972 MOISTURE DENSITY RELATIONSHIP REPORT Test Report Date: Client: Sample Date: Project: Identification: Test Procedure: December 23, 1996 Beamer Development, Inc. December 11, 1996 Estates of Cambridge Manor, Phase II Moisture Density Relationship ASTM D698 Project No.: 96-298 Report No.: 2 Test Results: Method ......................................... A Optimum Moisture Content ............................. 21.4 percent Maximum Density .................................. 95.7 pounds per cubic foot Rammer Type ..................................... Manual Material Description ................................. Gray Shale with occasional ............................................... Reddish Brown Sandy Clay Material Origin .................................... On Site Stock Pile Moisture Preparation Procedure .......................... Air Dry Liquid Limit ...................................... 40 Plastic Limit ...................................... 20 Plasticity Index .................................... 20 Percent Passing a No. 200 U.S. Sieve ...................... 91 Technician: M.R. CC: Mr. Jack Bommarito - Beamer Development, Inc. Mr. David Carlton - Dowdy, Anderson and Associates, Inc. Mr. Larry Davis - City of Coppell Our letters and reports are for the exclusive use of the client to whom they are addressed. The use of our name must receive our prior written approval. Our letters and reports apply only to the sample tested and/or inspected, and are not necessarily indicative of the quantities of apparently identical or similar products. EOTECHNICAL GEE Consultants, inc. 10046 Monroe Drive · Dallas, Texas 75229 · (214) 352-5433 · Fax (214) 352-6972 MOISTURE DENSITY RELATIONSHIP REPORT Test Report Date: Client: Sample Date: Project: Identification: Test Procedure: December 23, 1996 Beamer Development, Inc. December 11, 1996 Estates of Cambridge Manor, Phase II Moisture Density Relationship ASTM D698 Project No.: 96-298 Report No.: 1 Test Results: Method ......................................... Optimum Moisture Content ............................. Maximum Density .................................. Rammer Type ................. '. ................... Material Description ................................. Material Origin .................................... Moisture Preparation Procedure .......................... Liquid Limit ...................................... Plastic Limit ...................................... Plasticity Index .................................... Percent Passing a No. 200 U.S. Sieve ...................... A 10.0 percent 118.9 pounds per cubic foot Manual Light Reddish Brown Sand On Site Stock Pile Air Dry N/A N/A NP 22 Technician: M.R. cc: Mr. Jack Bommarito - Beamer Development, Inc. Mr. David Carlton - Dowdy, Anderson and Associates, Inc. Mr. Larry Davis - City of Coppell · /~' ~-"> val Our letters and repons are for thc exclusive use of the client to whom they are addressed. Thc usc of o'~. name mus~'~eccive our prior written appro . Our letters and repons apply only to the sample tested and/or inspected, and are not necessarily indicative of tile quantities of apparently identical or similar products.