Loading...
Cambridge Phase 1-LR 940919G EOTECHNICAL ENGINEERING GEE Consultants, Inc. E ] NVIRONMFNTAL 2540 Glenda Lane · Suite 108 · Dallas, Texas 75229 · (214i 620-9791 · Fax (2'14) 620-9794 REPORT OF CONCRETE MIX INSPECTION Report Date: September 19, 1994 Date Concrete Placed: September 13, 1994 Standard 6'x12' Client: Beamer Development Corporation Area 28.27 Square Inches Project: Estates of Cambridge Manor, Phase I Concrete Report No.: 10 Contractor: Burkard Utility Contractor Concrete Supp[ier and Plant: Lattimore Materials Co./Plant Location of Placement: Storm Drain Inlets MATERIALS ~ SSDa.,~w~. INSPECTION DATA De, scri~ion :l.ba CuYd) Mix Number: 38 Time Sample Batched: |2:43 pm Cement: 5 sk Time Sampled: 1:40 pm Fly Ash: Sample Location: Inlet E side of Cambridge Manor Ln. N end Truck/Ticket No: 30053006203 Coarse Aggregate: Temperature: Intermediate Aggregate: Ambient Range: 88°F Fine Aggregate: Concrete Range: 86°F Admixtures: Slump Range (inches): 1 Weather Conditions: Partly Cloudy I W/R Time Started: 12230 pm 2 Air Time Completed: 2:45 pm Added Water: Sample Air Content (~): No test Total Cubic Yards Placed: 8.0 Required Strength (Lbs./sq.in.): Spe,~4men Me~su~r,d Ago Dam Total Load Corn~mssiv, o Strength Num. imr Shanp . k'~.: IDa.ssi Tesw, d (Lb~.! .'Lh~. Sq.ln.I EOM 28 1% 7 09/20/94 114,240 4,040 ECS 29 1% 28 10/11/94 ECM 30 1% 28 10/11/94 Test Mctho(i~ t'~iliz~i F.'-a¢'t".~m Rcgulat ASTM C-31.C-39.C-la3 ,L'nk.~s ~;~,~ Oe~'ig) j Cylinders .,Made By: P. M, Remarks and;or Distribution: cc: Bill Anderson - Dowdy. Anderson and Associates. Inc. Larry Davis - City of Coppell Tim Yancy - Burkard Utilit.v Contractor All let'.~ra and rcpcn~ am For ~ exclusive u~ of the, cii~m to whom they. am addressed and shall not be mpr~xluc~l withma th~ .rdl approval of GEE Comuha~s. Inc. Th~ me of out nan~ must recei~ our prior w~itlml appro~al. Out lotions and ~po~t~ al~ly only to tho sam~lo te, at~i and/of i~ge, er~d ~d am nol ne~,a~arily irgli~tive of ~ .quanliti~ of apl~te~Jy id~mi~al or similar g, foducts.