REPORT OF CONCRETE MIX INSPECTION
Report Date: September 19, 1994 Date Concrete Placed: September 13, 1994 Standard 6'x12'
Client: Beamer Development Corporation Area 28.27 Square Inches
Project: Estates of Cambridge Manor, Phase I Concrete Report No.: 10
Contractor: Burkard Utility Contractor
Concrete Supp[ier and Plant: Lattimore Materials Co./Plant
Location of Placement: Storm Drain Inlets
MATERIALS ~ SSDa.,~w~. INSPECTION DATA
De, scri~ion :l.ba CuYd)
Mix Number: 38 Time Sample Batched: |2:43 pm
Cement: 5 sk Time Sampled: 1:40 pm
Fly Ash: Sample Location: Inlet E side of Cambridge Manor Ln. N end
Truck/Ticket No: 30053006203
Coarse Aggregate: Temperature:
Intermediate Aggregate: Ambient Range: 88°F
Fine Aggregate: Concrete Range: 86°F
Admixtures: Slump Range (inches): 1
Weather Conditions: Partly Cloudy
I W/R Time Started: 12230 pm
2 Air Time Completed: 2:45 pm
Added Water: Sample Air Content (~): No test
Total Cubic Yards Placed: 8.0
Required Strength (Lbs./sq.in.):
Spe,~4men Me~su~r,d Ago Dam Total Load Corn~mssiv, o Strength
Num. imr Shanp . k'~.: IDa.ssi Tesw, d (Lb~.! .'Lh~. Sq.ln.I
EOM 28 1% 7 09/20/94 114,240 4,040
ECS 29 1% 28 10/11/94
ECM 30 1% 28 10/11/94
Test Mctho(i~ t'~iliz~i F.'-a¢'t".~m Rcgulat
ASTM C-31.C-39.C-la3 ,L'nk.~s ~;~,~ Oe~'ig) j Cylinders .,Made By: P. M,
Remarks and;or Distribution:
cc: Bill Anderson - Dowdy. Anderson and Associates. Inc.
Larry Davis - City of Coppell
Tim Yancy - Burkard Utilit.v Contractor