Loading...
Cambridge Phase 1-LR 940919 (2)G EOTECHNICAL ENGINEERING GEE Consultants, Inc. E INVIRONMENTAL 2540 Glenda Lane · Suite 108 · Dallas, Texas 75229 · (214) 620-9791 · Fax (214) 620-9794 REPORT OF CONCRETE MIX INSPECTION Report Date: September 1.9, ].994 Date Concrete Placed: August ].9 3.994 Standard 6"x12' Client: Beamer Development Corporation Area 28.27 Square Inches Project: Estates of Cambridge Manor Phase I CoocreteRepo~ No.: 6 Contras'tot: Burkard Utility Contractor Concrete Supplier and Plant: Lattimore Materials Co./Plant #3 Location of Placement: Ma nho 1 e ~ sD .,~w~. INSPECTION DATA MATERIALS Mix Number: Time Sample Batchcd: 3:37 pm Cement: Time Sampled: 4:12 pm Sample Location: Line 'C' station I 1.38.8--6 Fly Ash: Trucb'Ficket No: 331/3005628 Coarse Aggregate: Temperature: Intermediate Aggregate: Ambient Rang,': 113°F Fine Aggregate: Concrete Range: 95°F Admixtures: ~ Slump Range (inches): 2.5' Weather Conditions: Clear I Time Started: 3:45 pm 2 Time Completed: 5:25 pm Added Water: 6 gallons Sample Air Content (%): No test Total Cubic Yards Placed: 4.5 Required Strength (Lbs./sq.in.): 3,000 Sm Mcaeumd Age Da~e Total Load Cempmssis~ Stgnath Rematk~ Ntatnber Slu~p (in. ~ tDa.~ s'~ Tes~d (LbeA .tLbe JSq.in.) ECM 16 2.5 7 08/26/94 97,920 3,460 ECM 17 2.5 28 09/16/94 122,620 4,340 ECM 18 2.5 28 09/16/94 125,940 4,450 Tut .Metheds Utilized Fracture Regular Cylinders Made By: G. S .~'TM C-31,C-39.C-143 .Unleas Nord O'.h~..~,is~l Remarks and/or Distribution: cc: Bill Anderson - Dowdy. Anderson and Associates, Inc. Larry Davis - City of Coppell Tim Yancy - Burkard Utility Contractor GEB ~onsultants, Inc. Reviewed by: All I~ra an~ mpotna a~ for ~h: ~xclmlve me of the client to wb:~ ~ a~ addm~ed and sl~ll nos I~ ,~.p..,daced without ag full aplan:,val of GEE Cceaultam.s, bae. The us~ of out ~me nmat teo:ive out ptio~ writleg, al~o~d. Out ~et~m ami mlxn~ apply maly to t]~ lample ~led andYo~ ~poetod ~ am nol nec~la~ri]y ~d~c~ive of the qu~mltiee of agl~mm-atly ide~ical or s;-~il., ptodu~Ln.