Loading...
Cambridge Phase 1-LR 940919 (3)G EOTECHNICAL E GEE Consultants, Inc. 2540 Glenda Lane * Suite 108 · Dallas, lexas 75229 · {214) 620-97~1 · Fax [214) 620-9794 REPORT OF CONCRETE MIX INSPECTION Report Date: September 19, 1994 Date Concrete Placed: September 9 1994 Standard 6"x12" Client: Beamer Developraent Corporation Area 28.27 Square Inches Project: Estates of Cambridge Manor, Phase I Concrete ReponNo.: 9 Contractor: Burkard Utility Contractor Concrete Supplier and Plant: Lattimore Materials Co./Plant #7 Location of Placement: Headwall (NW end near creek) ~= SSD B.~ w~. INSPECTION DATA MATERIALS ~..~i~ ,~,cuvd, Mix Number: Time Sample Batched: 2:38 pm Cement: Time Sampled: 3:39 pm Sample Location: NW near creek Fly Ash: Truck,Ticket No: 419/7004138 Coarse Aggregate: Temperature: Intermediate Aggregate: Ambient Range: 94°F Fine Aggregate: Concrete Range: 90°F Slump Range (inches): 1 ~/': Admixtures: " Weather Conditions: Partly' Cloudy 1 Time Started: 2:40 pm 2 Time Completed: 4:40 pm Added Water: Sample Air Content (~): 2,.%.- Total Cubic Yards Placed: 5.0 Required Strength (Lbs./sq.in.): 3.600 Spe~4m~n Mea.surc, d Age Dam Total L,nd Cotrge~i~t Strength Remarks Nm-e. bet $1u~np, in. ~ 'Days ~ Tested ~Lbs. ! :Ll~..'Sq.ln.~ ECM 25 1½ 7 09/16/94 134,500 4,760 ECM 26 1~ 28 10/07/94 ECM 27 1½ 28 10/07/94 Test Me0*od$ Et~F. zed F,,acaure Regular Cylinders tx.lade By: P. S. AST~.~ C-3t.C-39,C-143 ;l.'nle.ss Nol~d Oth:r~.isel ' ' Remarks and/or Distribution: cc: Bill Anderson - Dowdy, Anderson and Associates, Inc. Larry Davis - City of Coppeil Tim Yancy - Burkard Utility Contractor ~ .~- All lett~r~ and rc~ at~ for thc cxclusiv~ tm~ of ti't: clkat to whom ~ a~ addnn~ed iisi shall t~t I~ mptodm:~l without tim full apl~nfl of Ggg C~,amms. Inc. ~ use of om' name mu~t our prior ,a.n'itt~'n al~ov'al. Our totters and regtn~ spiny only to thc sampt~ msu~l and/o~ impect~[ and am r~ nccc&narib/indicative et' thc quantities of apparently idmuical or similar pt',octue'.~.