Loading...
Cambridge Phase 1-LR 940916 (2)G EOTECHNICAL ENGINEERING GEE Consultants, Inc. E INVIRONMENTAL 2540 Glenda Lane · Suite 108 · Dallas, Texas 75229 · (214) 620-9791 · Fax (214) 620-9794 REPORT OF IN-PLACE DENSITY AaND MOISTURE OF SOIL Density Report No. 43 Method: ASTM D2922 D3017 D698 Page I of Client: Beamer Development Comp~my Mamrial r~-~,,ti,-a Max. Dry Optimum Density Moisture Project: Estates of Cambridge Manor Phase I tLbs;CuFt) Content Test Date: September 13. 1994 1. Dark Gray Sandy Clay I01.1 14.2 2. Brown Clayey "~and 107.1 I4.3 Report Date: September 16. 1994 3. Yellowish Brown Olive (.;ray Clayey Sm~d 114.3 9.8 4. Yelhm'ish Brown Clayey Sand w4th Gr'4vel 115.2 9.3 Required Density (%): 95% to 105% 5. Dark Gray Silty Clay 94.6 21.1 6. Gray Shale 9(I.2 24.0 Required Moisture (,%): =3%, Optimum +5% 7. Yellowish Brown :u~d Light Gray Sand 103.4 8.4 Probe I Storm sewer line A. Station 7~-50 282 104.8 15.8 103.7 6" Cambridge Manor Lane 33' pipe - final lift 5 Stomt sewer line B, Station 0-75 283 97.2 25.1 102.7 6~ West o£ Cambridge Manor Lane 21" pipe 6' below existing grade 2 Storm sewer line A. Station 8+75 284 107.3 16.8 100.2 6" Cambridge Manor Lane 33" pipe - final lift I Storm ~ewer line A. Station 9+50 285 102.7 14.9 101.6 6" Cambridge Manor Lane 33' pipe - final All tests meet the pr~ect specifications cc: Bill Anderson - Dowdy. Anderson and Associates. Inc. Larry Davis - City of Coppe[l