Cambridge Phase 1-LR 940915J G EOTECHNICAL
E GEE Consultants, Inc.
, ~.9 · (214.~ 620-9791 · Fax (214~ 620-9794
2540 Glenda Lane · Suite 108 · Dallas, Texas --'~'~
REPORT OF CONCRETE MIX INSPECTION
Report Date: September 15, 1994 Date Concrete Placed: August 17 1994 Standard 6"x12"
Client: Beamer Development Corporation Ar~a _8._7 Square inches
Project: Estates of Cambridge Manor Concrete Repon No.: 5
Co,tractor: Burkard Utility Contractor
Concrete Supplier and Plant: Lattimore Materials Co./Plant #3
Location of Placement: Manhole Line "C"
s,,~. ssD ..,~. w~,. INSPECTION DATA
MATERIALS
Mix Number: Time Sample Batched: 12:45 pm
Cement: Time Sampled: 2:10 pm
Sample Location: Line "C' MH 4--~9.~,~, MH 8+15.19
Fly Ash: TmcbTicket No: 282.'3005549
Coarse Aggregate: Temperature:
Intermediate Aggregate: Ambient Range: 100"F
Fine Aggregate: Concrete Range: 95°F
Slump Range (inches~: 1.25
Admixtures: Weather Condition~: Hot Sunny. Clear
I Time Star, ed: 1:30 psn
.;'~ with Air Time Completed: 3:10 pm
Added Water: Sample Air Content (%): No test
Total Cubic Yards Placed: 8.5
Required Strength (Lbs.:sq. n.l: 3.600
ECM 13 1.25 7 08/24/94 121,300 4,290 * Note: Cylinder possibly
ECM 14 1.25 28 09/14/94 103,980 3,680* damaged.
ECM 15 1.25 28 09/14/94 125,190 4,430
T~'~t .Me'.h,z~as L::.iize~ Frac~;.tre Regular C',-linder.,, Made Bx': V. S./G. H.
Remarks and:or Distribution:
cc: Bill Anderson - Dowdy. Anderson and Associates. Inc.
Larry Davis - City of Coppell
Tim Yancy - Burkard Utility Contractor
All IcU~rs and ,'~p~*rls am .for '-.~ cxclusive o.ne of ~ orient Lo ,.,.horn the~, am acu, lmssed and shall no~ h~ mp~xluced v. ithoat ti~ t~ll Jpp. ro~al of fiE£ Co~uitanis, inc. 'Ene usc o£ out :~une must