Loading...
Cambridge Phase 1-LR 940902 E GEE Consultants, Inc. F 2540 Glenda Lane · Suite 108 · Dallas, Texas 75229 · {.2141 620-9791 · Fax (214'! 620-9794 REPORT OF IN-PLACE DENSITY AND MOISTURE OF SOIl. Density Report No. 41 Method: ASTM D2922 D3017 D698 Page 1 of 1 Client: Beamer Development Company .~a~.~a~ ~io~ Max. D~' Optimum Density Moisture Project: Estates of Cambridge Manor Phase I (Lbs/CuFt) Content (%) Test Data: August 30. 1994 1. Dark Gray S~dy Clay 101.1 14.2 2. Brown Clayey. Sand 107.1 14.3 Report Date: September 2, 1994 3. Yellowish Bro~ Olive Gray Clays' Sand 114.3 9.8 4. Yellowish Bro~a~ Clayey Sand with Gravel 115.2 9.3 Required Density (%): 95,% to 105% 5. Dark Gray Sat), Clay 94.6 21.1 6. Gray Shale 90.2 24.0 Required Moisture (%):-v3%, Optimum +5% 7. Yeilo,Msh Brown and Light Gray ~'~and 103.4 8.4 Mat Localio~.El~,.'ation (ara:or) L:.t~ In-Plac~ In-Plac~ Perce. ra No. D~.- Dc'p~ityMoisture Compaction Test No. ,LI~, CuFu Contra ~'~) Probe 2 Sanita~' sewer, line E. station I +00 274 113.8 16.8 106.2 6" 2.5' below grade 2 Sanitary ~wer. line E. station 2+00 275 110.7 13.7 103.3 6" 1.0' below grade I Sanita%' sewer, line H. station l +64 276 103.0 21.9' 101.9 6~ 2.5' below grade 1 Sanitary sewer, line H. station I +64 277 106.4 16.2 105.3 6" 6~ below grade 5 Sanitary sewer, line !. station 1+50 278 98.4 ~.--3.0 104.0 6" 2.5' below grade i Sanitary sewer, line I. station 4+00 279 96.7 19.3 95.7 6" 2.5' below grade * Does not meet ~he project specifications cc: Bill Anderson - Dowdy, Anderson and Associates, [nc. Larry, Davis - City of Coppell