Cambridge Phase 1-LR 940901 G E
OTECHNICAL
E GEE Consultants, Inc.
2540 Glenda lane · Suite 10g · Dallas, Texas 75229 · (214) 620-9791 · }:ax 1214) 620-9794
REPORT OF CONCRETE MIX INSPECTION
Report Date: September 1, 1994 Date Concrete Placed: August 19 1994 Standard 6'x12"
Client: Beamer Development Corporation Area 28.27 Square Inches
Project: Estates of Cambridge Manor Concrete Report No.: 6
Contractor: Burkard Utility Contractor
Concrete Supplier and Plant: Lattimore Ma=erials Co./Plant #3
Location o£ Placement: Manhole
MATERIALS ~.- ~D ~,~ w~. INSPECTION DATA
Descrlptio~ (L~.'CuYd)
Mix Number: Time Sample Batched: 3:37 pm
Cement: Time Sampled: 4:12 pm
Fly Ash: Sample Location: Line 'C' station 11 +38.86
· Track,Ticket No: 331i3005628
Coarse Aggregate: Temperature:
Intermediate Aggregate: Ambient Range: 113°F
Fine Aggregate: Concrete Range: 95°F
Admixtures: Slump Range (inches): 2.5"
Weather Conditions: Clear
I Time Started: 3:45 pm
2 Time Completed: 5:25 pm
Added Water: 6 gallons Sample Air Content (..%.): No test
Total Cubic Yards Placed: 4.5
Required Strength (Lbs./sq.in.): 3,000
SPecu'hen Measured Age Date Tonal Load Compmasive .StomgLh Remarks
Number Slump ,M.J iD%', s I Teared fL~.~ ~.Lbs..'Sq.ln.:
ECM 16 2.5 7 08/26/94 97,920 3,460
ECM 17 2.5 28 09/16/94
ECM 18 2.5 28 09/16/94
Test Methods I.tiliz~l Fracnttm Regular Cvlinders .glade By: G. H.
AS'FM C-31,C-3q,C-143 ,t.'n~s No~:l O~.~:~'i~ - -
Remarks and/or Distribution:
cc: Bill Anderson - Dowdy. Anderson and Associates. Inc.
Larry. Davis - City of Copper
Tim Yancy - Burkard Utility Contractor
GEE Consultants, In(::. Reviewed by:
All ~tmrs and ,~..~,~ am for th~ e. xcimiv~ am of ihs: dial to ~ ~ am addme~d and shall nat Ix: ,~v,~%a:ed without th~ full appro~l of GEE C~, [ne. Th~ um of our nan~ must r~eive
m~t .mfio~ n~n'iamx aFl.oval. Our le. ltsm and ,~l,~,~ apply ou]), to th~ sampI,- t~md ar~b'o~ im~l~'~d and tm not r~omearily indieativ~ of th~ qunntJti~m of al~m~ntly id~mical or $izuilar pro~uc~.