Loading...
Cambridge Phase 1-LR 940901 G E OTECHNICAL E GEE Consultants, Inc. 2540 Glenda lane · Suite 10g · Dallas, Texas 75229 · (214) 620-9791 · }:ax 1214) 620-9794 REPORT OF CONCRETE MIX INSPECTION Report Date: September 1, 1994 Date Concrete Placed: August 19 1994 Standard 6'x12" Client: Beamer Development Corporation Area 28.27 Square Inches Project: Estates of Cambridge Manor Concrete Report No.: 6 Contractor: Burkard Utility Contractor Concrete Supplier and Plant: Lattimore Ma=erials Co./Plant #3 Location o£ Placement: Manhole MATERIALS ~.- ~D ~,~ w~. INSPECTION DATA Descrlptio~ (L~.'CuYd) Mix Number: Time Sample Batched: 3:37 pm Cement: Time Sampled: 4:12 pm Fly Ash: Sample Location: Line 'C' station 11 +38.86 · Track,Ticket No: 331i3005628 Coarse Aggregate: Temperature: Intermediate Aggregate: Ambient Range: 113°F Fine Aggregate: Concrete Range: 95°F Admixtures: Slump Range (inches): 2.5" Weather Conditions: Clear I Time Started: 3:45 pm 2 Time Completed: 5:25 pm Added Water: 6 gallons Sample Air Content (..%.): No test Total Cubic Yards Placed: 4.5 Required Strength (Lbs./sq.in.): 3,000 SPecu'hen Measured Age Date Tonal Load Compmasive .StomgLh Remarks Number Slump ,M.J iD%', s I Teared fL~.~ ~.Lbs..'Sq.ln.: ECM 16 2.5 7 08/26/94 97,920 3,460 ECM 17 2.5 28 09/16/94 ECM 18 2.5 28 09/16/94 Test Methods I.tiliz~l Fracnttm Regular Cvlinders .glade By: G. H. AS'FM C-31,C-3q,C-143 ,t.'n~s No~:l O~.~:~'i~ - - Remarks and/or Distribution: cc: Bill Anderson - Dowdy. Anderson and Associates. Inc. Larry. Davis - City of Copper Tim Yancy - Burkard Utility Contractor GEE Consultants, In(::. Reviewed by: All ~tmrs and ,~..~,~ am for th~ e. xcimiv~ am of ihs: dial to ~ ~ am addme~d and shall nat Ix: ,~v,~%a:ed without th~ full appro~l of GEE C~, [ne. Th~ um of our nan~ must r~eive m~t .mfio~ n~n'iamx aFl.oval. Our le. ltsm and ,~l,~,~ apply ou]), to th~ sampI,- t~md ar~b'o~ im~l~'~d and tm not r~omearily indieativ~ of th~ qunntJti~m of al~m~ntly id~mical or $izuilar pro~uc~.