Loading...
Cambridge Phase 1-LR 940825J G EOTECHNICAL E GEE Consultants, Inc. F 2540 Glenda lane · Suite 108 · Dallas, lexas 75229 · (214) 620-9791 · [ax (214) 620-9794 REPORT OF CONCRETE MIX INSPECTION Report Date: August 25, 1994 Date Concrete Placed: August 17 1994 Standard 6"x!2' Client: Beamer Development Corporation Area 28.27 Square Inches Project: Estates of Cambridge Manor Con¢~te Report No.: 5 Contractor: Burkard Utility Contractor Concrete Supplier and Plant: Lattimore Materials Co./Plant #3 Location of Placement: Manhole Line "C" s~.~, ~o B.~W~. INSPECTION DATA MATERIALS Mix Number: Time Sample Batchcd: 12:45 pm Cement: Time Sampled: 2:10 pm Sample Location: Line "C' MH 4+79.2..~3, MH 8+ 15.1c) Fly Ash: Tmclo'l'icket No: 282,'3005549 Coars~ Aggregate: Temperature: Intermediate Aggregate: Ambient Range: 100°F Fine Aggregate: Concrete Range: 95°F Slump Range (inches): 1.25 Admixtures: Weather Conditions: Hot Sunny, Clear 1 Time Started: 1:30 pm 2 with Air Time Completed: 3:10 pm Added Water: Sample Air Content (%): No test Total Cubic Yards Placed: 8.5 Required Strength (Lbs./sq.in.): 3.600 Specimen Meamu~d Aec Da~ Total Loaa Ccnnl~essive Strength Rematk~ Ntuaber SIun~ dn.s !Da.,,ss Tested [Lbs.) ,.Lbo..'Sq.ln.: ECM 13 1.25 7 08/24/94 121,300 4,290 ECM 14 1.25 28 09/13/94 ECM 15 1.25 28 09/13/94 Tc~t Mc. thuds L¥11zed Fracture ~,~,~ Cvlinder~ Made By: V. S./G. H. .t~T M C-3 [ .C-39,C- 143 , Un~es Nord O~hmnui~l ' ' Remarka and/or Distribution: cc: Bill Anderson - Dowdy, Anderson and Associates, Inc. Larry Davis - City of Coppeil Tim Yancy - Burkard Utility Contractor G~ ~onsuitants, Inc. Revieleed by: ,/~'~/'~'~'.~ ALI Imlf~n and ~x~t aa~ fo~ th~ exclusive m~ of th0 ¢lina to v/nan tb~ am J and dali ma b ~,~ ~ ~ ~ ~ ~ G~ C~U, Inc.