Cambridge Phase 1-LR 940825J G EOTECHNICAL
E GEE Consultants, Inc.
F
2540 Glenda lane · Suite 108 · Dallas, lexas 75229 · (214) 620-9791 · [ax (214) 620-9794
REPORT OF CONCRETE MIX INSPECTION
Report Date: August 25, 1994 Date Concrete Placed: August 17 1994 Standard 6"x!2'
Client: Beamer Development Corporation Area 28.27 Square Inches
Project: Estates of Cambridge Manor Con¢~te Report No.: 5
Contractor: Burkard Utility Contractor
Concrete Supplier and Plant: Lattimore Materials Co./Plant #3
Location of Placement: Manhole Line "C"
s~.~, ~o B.~W~. INSPECTION DATA
MATERIALS
Mix Number: Time Sample Batchcd: 12:45 pm
Cement: Time Sampled: 2:10 pm
Sample Location: Line "C' MH 4+79.2..~3, MH 8+ 15.1c)
Fly Ash: Tmclo'l'icket No: 282,'3005549
Coars~ Aggregate: Temperature:
Intermediate Aggregate: Ambient Range: 100°F
Fine Aggregate: Concrete Range: 95°F
Slump Range (inches): 1.25
Admixtures: Weather Conditions: Hot Sunny, Clear
1 Time Started: 1:30 pm
2 with Air Time Completed: 3:10 pm
Added Water: Sample Air Content (%): No test
Total Cubic Yards Placed: 8.5
Required Strength (Lbs./sq.in.): 3.600
Specimen Meamu~d Aec Da~ Total Loaa Ccnnl~essive Strength Rematk~
Ntuaber SIun~ dn.s !Da.,,ss Tested [Lbs.) ,.Lbo..'Sq.ln.:
ECM 13 1.25 7 08/24/94 121,300 4,290
ECM 14 1.25 28 09/13/94
ECM 15 1.25 28 09/13/94
Tc~t Mc. thuds L¥11zed Fracture ~,~,~ Cvlinder~ Made By: V. S./G. H.
.t~T M C-3 [ .C-39,C- 143 , Un~es Nord O~hmnui~l ' '
Remarka and/or Distribution:
cc: Bill Anderson - Dowdy, Anderson and Associates, Inc.
Larry Davis - City of Coppeil
Tim Yancy - Burkard Utility Contractor
G~ ~onsuitants, Inc. Revieleed by: ,/~'~/'~'~'.~
ALI Imlf~n and ~x~t aa~ fo~ th~ exclusive m~ of th0 ¢lina to v/nan tb~ am J and dali ma b ~,~ ~ ~ ~ ~ ~ G~ C~U, Inc.