Loading...
Cambridge Phase 1-LR 940822J G EOTECHNICAL E GEE Consultants, Inc. 2540 Glenda lane · Suite 10g * Dallas. lexas 75229 · (214) 620-9791 · Fax (214) 620-9794 REPORT OF CONCRETE MIX INSPECTION Report Date: AucJ~.st 22, 1994 Date Concreto Placed: August 12 1994 Standard 6'x12' Client: Beamer Development Corporation A~a 28.27 Square Inches Project: Estates of Cambridge Manor Concrete Report No.: 4 Contractor: Griffith Construction Concrete Sugplicr and Plant: Lattimore Materials Co./Plant #14 Location of Placement: Manho 1 e ~, s~D ~ w~,. INSPECTION DATA MATERIALS Mix Number: Time Sample Batchcd: 2:25 pm Cement: Time Sampled: 3:55 pm Sample Location: Line "A' 17+86 sanitary, s~wer Fly Ash: Track/Ticket No: 561/14003326 Coarae Aggregate: Temperature: Intermediate Aggregate: Ambient Range: 100°F Fine Aggregate: Concrete Range: 87°F Slump Range (inches): 1.0' Admixtures: Weather Conditions: Partly Cloudy I Time Started: 1:45 pm 2 with Air Time Completed: 4:45 pm Added Water: 2 gal. Sample Air Content (%): No test Total Cubic Yards Placed: 4.0 Required Strength (Lbs./sq.in.): 3.600 ECM 10 1.0" 7 08/19/94 138,540 4,900 ECM 11 1.0" 28 09/09/94 ECM 12 1.0" 28 09/09/94 T~t Mm~ ttil~ Fmm~ Re&mar Cvlinde~ Made By: R. G. ~M C-31.C.39.C-la3 ~U~ N~ Re~r~ and/or Distribution: cc: Bill Ander~n- Dowdy. Anderson a~ As~iales. Inc. ~ Davis - City of Coppell ~ ~nsuimts, Inc. Revie.~ by: