Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Cambridge Phase 1-LR 940822 (2)
I G E GEE Consultants, Inc. 2540 Glenda Lane · Suite 108 · Dallas, Texas 75229 · (214) 620-9791 · Fax {214) 620-9794 REPORT OF CONCRETE MIX INSPECTION Repo~ Date: August 22, 1994 Da~e Concrete Placed: July 22, 1994 S'-n~ 6'x11" Client: Beamer Development Corporation Area 28.27 Square Incb~ l~oject: Estates of Cambridge Manor Co.crete RepoflNo.: Contractor: Burkard Utility Contractors co"c~t¢ Supplier and ~ant: Lattimore Materials Co./Plant #3 Location of Placement: Manhole - Line A Station 0+00 ~- ~o h,~ w~. INSPECTION DATA MATERIALS ~ Mix Number: Time Sample Batched: 3:13 pm Cement: Time Sampled: 4:00 pm Sample Location: 100 yards N of DeForest Ln on MetAl',hut Fly Ash: Track;Ticket No: 283/3004734 Coarse Aggregate: Temperature: Intermediate Aggregate: Ambient Range: 98°F Fine Aggregate: Co"crete Range: 96°F Slump Range (inches): Admixtures: Weather Conditions: Pafily Cloudy i w/Air Time Started: 2:00 pm 2 Time Completed: 5:00 pm Added Water: Sample Air Coment (~): No test Total Cubic Yards Placed: 7.0 Required Strength (Lbs.;sq.in.): 3.600 ECM 1 2~ 7 07/29/94 141,300 5,000 ECM 2 2% 28 08/19/94 179,250 6,340 ECM 3 2% 28 08/19/94 176,900 6,260 Te~t .Ma'.h~ Utiliz~l Fracture R=gula, Cylinders blade By: J. R. A~"['M C-31.C-39. C-143 ~[.;n]~..No~ Ot~.'ig; Remarks and/or Distribution: cc: Bill Anderson - Dowdy, Anderson and Associates. Inc. Larr~ Davis - City of Coppell G~ ~onsul't~.nts, Thc. Reviewed by: