Loading...
Cambridge Phase 1-LR 940818 E GEE Consultants, Inc. 2540 Glenda Lane · Suite 10g a Dallas, Texas 7522~ · (214) 620-97~1 · [ax (214) 620-~794 REPORT OF RN-PLACE DENSITY AND MOISTURE OF SOIL Density Report No. 38 Method: ASTM D2922 D3017 D698 Page 1 of I Client: Beamer Development Company Mat~ml O~--~ion Max. Dry Optimum Density Moisture Project: Estates of Cambridge .Manor Phase I (Lbs/CuFt) Content (,~) Test Date: August 17, 1994 I. Dark Gray ~'~andy Clay I01.1 14.2 Report Date: August 18, 1994 2. Brown Clayey Sand 107.1 14.3 3. Yellowish Brown Olive Gray Clayey. Sand 114.3 9.8 4. Yellowish Brown Clayey ~'~aud with GraYel 115.2 9.3 Required Density (%): 95% to 105% 5. Dark Gray Silty, Clay 94.6 21.1 6. Gray Shale 90.2 24.0 Required Moisture (%): "-3%. Optimum +5% 7. Yellowish Brown and Light Gray Sand 103.4 8.4 Mai Lo~ation,'EIcvation (and.'or~ Li/~ In-Ph~:c la-Place Pe~-m Tern NO. ~ De.si .ty Moi~us~ Compe~.xion No. iL~,CuFtl Con~m ~) PrOc 2 Line C, Station 4+50 258 109.3 14.4 102.1 6' 10' Sanitary Sewer. surface 2 Line C, Station 4+60 259 109.5 14.0 102.2 6~ 10' Sanilary Sewer. 2' deep 2 Line C, Station 4 + 70 260 I09. I 14.3 101.9 6' 10" Sanitary. Sewer. 4' deep 5 Line C. Station 8+ 10 261 96.3 ~,3.7 101.8 6" 10" Sanitary Sewer. surlihce lift 5 Line C, Station 8 + 00 262 97.9 22.0 103.5 6~ 10" Sanita~. Sewer, 2' deep All tests meet Ihe project specifica6ons cc: Bill Anderson - Dowdy, Anderson and Associates, Inc. Larry Davis - City of Coppell