Cambridge Phase 1-LR 940815G EOTECHNICAL
E GEE Consultants, Inc.
F
2540 Glenda lane · Suite 10g · Dallas. lexas 75229 · (214) 620-9791 · Fax (214) 620-9794
REPORT OF CONCRETE MIX INSPECTION
Report Date: August 15, 1994 Date Concrete Placed: August 5, 1994 Standard 6'x12'
Client: Beamer Development Corporation Area 28.27 Square Inches
Project: Estates of Cambridge Manor Concrete Repo~No.: 3
Contractor: Burkhart Utility Contractors
Concrete Supplier and Plant: Lattimore Materials Co./Plant #7
Location of Placement: Storm Sewer Outlet Headwall
~. ~D B.,~ w~. INSPECTION DATA
MATERIALS o~i~ ~u.,cuva,
Mix Number: 38 Time Sample Berthed: 3:58 pm
Cement: Time Sampled: 5:15 pm
Sample Location: S.S. Outlet Headwa[l, N.W. corner of pond
Fly Ash: Truck:Ticket No: 280/7003495
Coarse Aggregate: Temperature:
Intermediate Aggregate: Ambient Range: 94°F
Concrete Range: 95°F
Fine Aggregate: Slump Range (inches): lY'
Admixtures: Weather Conditions: Partly Cloudy
I WR Time Started: 4:30 pm
2 Air Time Completed: 6:15 pm
Added Water: 20 gal. Sample Air Content (.~): No test
Total Cubic Yards Placed: 9.0
Required Strength (Lbs./sq.in.): 3.000
Siw. c~ Measured Afc Dam Totai Lo~ Comgn:ssi~,c Stt~g~ Rennar~
N ~n~r Sl~n~ tin. ~ , Days I Tee'''''m i Lt~. ~ , LI~.-.~I. In.
ECM 7 1~ 7 08/12/94 112,760 3,990 Broke 8/13
ECM 8 1~ 28 09/02/94
ECM 9 1% 28 09/02/94
T¢~, Methods Utilized Fractu~ Regular Cylinders Made By: R. G.
.-MYI'M C-31 .C-39.C-I~3 ,'Unle~ Nord Oth~rv.i~l ' '
Remarks and/or Distribution:
cc: Bill Anderson - Dowdy, Anderson and Associates, Inc.
Larry Davis - City of Coppell ~;~~..
GI~B Consultan'l:s, ThC. Revieued by:
/ ,..../
All I~l~rs ~ ~t}o~ am foe tl~ e..v. clu~i~e us~ of th~ clime to ,a,-h~n they am add.n:as~ and shah nm ix: r~gnadu~nl ,a..ithma th~ full aoin~el of GEE Consultams. inc. ~ us~ of our rmm~ must mce..ive
ou~ prior wfiUma approval. Om' km~m and ~ apply onJy to tim ~ampk: ~ ami/o~ in~n~ted a~! am not n~{~aarily i~licati,~ of th~ quamitie$ of aplm~mly idmati~l or similar prcdu~$.