Loading...
Cambridge Phase 1-LR 940815 (2)JG ~OTECHNICAL E GEE Consultants, inc 2540 Glenda kane · Suite 10g · Dallas, Texas 75229 · (214) 620-0791 · Fax (214) 620-97! REPORT OF IN-PLACE DENSITY AND MOISTIYRE OF SOIL Density Report No.37 Method: ASTM D2922 D3017 D698 Page 1 of Client: Beamer I)~elopmm]t Company M,~,~.~ t'~s,.-~i~ Max. D~' Optimum Density Moisture Project: F.,states of Cambridge Manor Phase I (LbsiCuFt) Content (%) Test Date: August 12, 1994 1. Dark Gray Sandy Clay 101.1 14.2 2. Brown Clayey Sand 107.1 Report Date: August I5, 1994 3. Yellowish Brown Olive Gray Clayey. "'~and I14.3 9.8 4. Yel/ow~h Brnwn Clays' Sand w~t.b Gravel 115.2 9.3 Required Density (%): 95% to 105% 5. Dark Gray Silo' Clay 94.6 21.1 6. Gray Shale 90.2 24.0 Requir=d Moisture (%): :1:3%, Opthuum ~-5,.~ 7. Yello,n~sh Brown aad Light Gray ~.~ud 103.4 8.4 Mat LoJ~ion, Elevation ~'and'or~ I.iR ImPlac¢ In-Plat= P=r~nt No. I)ty D=mit.v Moi~tu~ Test ~Lbs, Cul:U Ccntmra ,' ~ ~ No. Pro~ 2 Line A. Station 16+50. top lit~ 7%~5 102,0 23,1 * 95 6" 8' Sewer under street 2 Line A. Station 16-50 256 103.0 17.2 96.2 6~ 8' Sewer under street. 4' deep 2 Line A. Station 16~-50 257 102.8 17.3 96.0 6~ 8' Sewer under street. 6' deep · Does not meet the project specifications Bill Anderson - Dowdy, Anderson and Associates. Inc. Lan'y Davis - CJly of Coppel{