Loading...
Cambridge Phase 1-LR 940810 G EOTECHNICAL E GEE Consultants, inc. 2540 Glenda lane · Suite 10g · Dallas, Texas 75229 · {214) 620-9791 · Fax (214) 620-9794 REPORT OF IN-PLACE DENSITY AND MOISTURE OF SOIL Density Report No.35 Method: ASTM D2922 D3017 D695 Page 1 of 1 Client: Beamer Development Company ~at~ria~ t)r~cri~i~ Max. Dry Optimum Density Moisture Project: Estat~ of Cambridge Manor Phase I (Lbs/CuFt) Content (%) Test Date: August 5. 1994 I. Dark Gray Clayey Sand 101.1 14.2 ~.* Browa Clays' Sand 107.1 14.3 Report Date: August 10. I994 3. Yellowish Bro~a Olive Gray Clayey "'~and 114.3 9.8 4. Yellowish Brown Clayey Sand w/Gravel 115.2 9.3 Required Density (%): 90% to 105% 5. Dark Gray Silo· Clay 94.6 21.1 6. Gray S~ale 90.2 24.1) Required Moisture (%): ±3%. Optimum +5% 7. Yellowish Brown and Light Gray ":~md 103.4 8.4 Mat Locatio~.-'E]cvatio~ iand.:orl Lilt [n-P!a~ In-Plac~ P~:rcont No. D~' l'X'mity Moistw~ Cc~action Test No. ~Lb~.CuFt; Ccr~,~-m i % ! Prob~ 2 l1 +75, line A. trench backfill 249 , 98.2 12.2 91.7 6" 1st lift. bottom lift. approximately 8 feet deep 2 9+50. line A. trench backfill 250 108.1 17.0 100.9 6' Surface lift 2 9+60. line A. trench backfill 251 100.1 17.2 93.5 6' Intermediate lift approximately 4 feet deep All test meet the prt~ect specifications -cc: Bill Anderson - Dowdy. Anderson and Associates. Inc. Larry Davis - City of Coppell