Loading...
Cambridge Phase 1-LR 940804 G EOTECHNICAL E : GEE Consultants, Inc. 2540 Glenda lane * Suite 10g · Dallas, lexas 75229 * (214) 620-9791 · Fax (214) 620-9794 GENERAL REPORT Report Date August 4, 1994 I.spection Date July 29, 1994 Client B~-tmer Development General Report No.: 5 Project Estates of Cambridge Manor, Phase I Coppell, Texas Identification Observation of Pond Liner Method of Test Visual Results On this date, July 29, 1994, a representative of GEE Consultants, Inc. visited the above referenced project. The purpose qf the visit was to perform compaction and depth checks on the pond liner material. The material was also sampled at two locations to determine the Plasticity Index (P.I.) and percent passing No. 200 Sieve. Depth checks were performed at four locations; east and west sidewall, key areas on the east and west side. Each location was found to have the required depth of at least 2 feet. The PI and percent passing No. 200 Sieve results are as follows: Percent Location Liquid Limit Plasticity Index Passing, No.200 One foot deep 50 36 77 Surface 44 31 77 Material Description: Dark Gray Silty Clay cc: Mr. Bill Anderson - Dowdy, Anderson and Associates Mr. Larry Davis - City of Coppell .4'