Loading...
Tax 2011B-LR130228ALLIHIYCE GEC?TECTiil'iICRL CROUP Consulting Engineering * Geotechnical Engineering * Construction Materials 3228 Halifax Street, Suite A, Dallas, Texas 75247 Phone: (972) 444 -8889 Fax: (972) 444 -8893 Acct ID: 1770 File No: C12 -1001 Date Sampled: 01/30/2013 Report Date: 02/28/2013 Previously Reported: 02/22/2013 Sampled By: Smith, Courtney Project: Vanbebber Drive Street Improvements By Order Of: Chris Location: conc 300 yds Order Number: 1770 Client: City of Coppell REPORT: REPORT OF CONCRETE COMPRESSIVE STRENGTH TEST LAB NO: 141696 Test Method: See Below Client PO: Q- 0612 -01 TEST RESULTS Report No: 141696 Page 1 of 2 Set: 1 of 2 Material: CONCRETE Location: Vanbebber Street, station 14 +00, N. side Number of Specimens: 5 Maximum Compressive Average Spec Age Tested Diameter Area Load Cure Strength Strength Tested Nbr (date : days) (in) (in 2) (lbs) Break Type Loc (PSI) (PSI) By Comments A 02/02/13 : 3 6.00 28.27 102,615 Type 2 Lab 3,630 3,630 B 02/06/13: 7 6.00 28.27 146,570 Type 2 7:53 am Lab 5,180 C 02/06/13: 7 6.00 28.27 140,545 Type 2 Lab 4,970 D 02/27/13: 28 6.00 28.27 167,830 Type 2 Lab 5,940 E 02/27/13: 28 6.00 28.27 169,920 Type 2 Lab 6,010 HE E] Type 1 Type 2 Type 3 Type 4 ............. _1 Type 5 Specification Strength: 3,600 psi @ 28 days Slump: 1 - 3 Air Content: 3 - 5 Date Received: 01/31/2013 Curing Method: Standard Time Sampled: 8:45 am Time Batched: 7:53 am Temp.: Ambient: 48 °F Mix: 50 °F CONFORMS Slump: 2.0 Inches Air Content: 3.6% Mix Code: 8274 5,080 5,970 * F ................. Type 6 Transported By: TXI Source /Sampled At: Truck / Center Plant: TXI - Plant #128 Truck /Ticket No: 3803 / 1591853 Quantity Represented: 10 cu. yds. at 20 cu. yds. placed of a 190 cu. yd. total placement Remarks: Test Method (As Applicable): Unless noted, concrete was sampled and tested in accordance with ASTM C31, C172, C143, C231 or C173, C1064 and C138. Compressive strength tests per ASTM C39. Client: City of Coppell Attn: Mr. Rick O'Dell (1 -cc copy) Orig: City of Coppell (Coppell, TX) Attn: Mr. Keith Marvin, P.E. Respectfully Submitted, Alliance Geotechnical Group Perry C. Kakedra, CME Department Manager THIS REPORT APPLIES ONLY TO THE STANDARDS OR PROCEDURES INDICATED AND TO THE SAMPLE(S) TESTED AND /OR OBSERVED AND ARE NOT NECESSARILY INDICATIVE OF THE QUALITIES OF APPARENTLY IDENTICAL OR SIMILAR PRODUCTS OR PROCEDURES, NOR DO THEY REPRESENT AN ONGOING QUALITY ASSURANCE PROGRAM UNLESS SO NOTED. THESE REPORTS ARE FOR THE EXCLUSIVE USE OF THE ADDRESSED CLIENTAND ARE NOT TO BE REPRODUCED WITHOUT WRITTEN PERMISSION. 19uiAnce GEOTECfif11CRL GROUP Consulting Engineering * Geotechnical Engineering * Construction Materials 3228 Halifax Street, Suite A, Dallas, Texas 75247 Phone: (972) 444 -8889 Fax: (972) 444 -8893 Acct ID: 1770 File No: C12 -1001 Date Sampled: 01/30/2013 Report Date: 02/28/2013 Previously Reported: 02/22/2013 Sampled By: Smith, Courtney Project: Vanbebber Drive Street Improvements By Order Of: Chris Location: conc 300 yds Order Number: 1770 Client: City of Coppell REPORT: REPORT OF CONCRETE COMPRESSIVE STRENGTH TEST LAB NO: 141696 Test Method: See Below Client PO: Q- 0612 -01 TEST RESULTS Report No: 141696 Page 2 of 2 Set: 2 of 2 Material: CONCRETE Number of Specimens: 5 Location: Vanbebber Street, station 10 +50, N.bound side Maximum Compressive Average Spec Age Tested Diameter Area Load Cure Strength Strength Tested Nbr (date : days) (in) (in 2) (Ibs) Break Type Loc (PSI) (PSI) By Comments A 02/02/13 : 3 6.00 28.27 103,820 Type 2 Lab 3,670 3,670 B 02/06/13: 7 6.00 28.27 124,280 Type 2 Lab 4,400 C 02/06/13: 7 6.00 28.27 125,285 Type 2 Lab 4,430 D 02/27/13: 28 6.00 28.27 141,975 Type 2 Lab 5,020 E 02/27/13 : 28 6.00 28.27 138,920 Type 3 Lab 4,910 EFF �F : E E��IC� 1 Type 1 Type 2 Type 3 Type 4 Type 5 Specification Strength: 3,600 psi @ 28 days Slump: 1 - 3 Air Content: 3 - 5 Date Received: 01/31/2013 Curing Method: Standard Time Sampled: 12:00 pm Time Batched: 10:51 am Temp.: Ambient: 51 °F Mix: 55 °F CONFORMS Slump: 4.0 Inches Air Content: 3.5% Mix Code: 8274 4,410 4,970 ................. Type 6 Transported By: TXI Source /Sampled At: Truck / Center Plant: TXI - Plant #143 Truck /Ticket No: 8029 / 1592203 Quantity Represented: 10 cu. yds. at 100 cu. yds. placed of a 190 cu. yd. total placement Remarks: *Slump exceeds specfications Test Method (As Applicable): Unless noted, concrete was sampled and tested in accordance with ASTM C31, C172, C143, C231 or C173, C1064 and C138. Compressive strength tests per ASTM C39. Client: City of Coppell Attn: Mr. Rick O'Dell (1 -cc copy) Ong: City of Coppell (Coppell, TX) Attn: Mr. Keith Marvin, P.E. Respectfully Submitted, Alliance Geotechnical Group i Perry C. Kakara, CME Department Manager THIS REPORT APPLIES ONLY TO THE STANDARDS OR PROCEDURES INDICATED AND TO THE SAMPLE(S) TESTED AND /OR OBSERVED AND ARE NOT NECESSARILY INDICATIVE OF THE QUALITIES OF APPARENTLY IDENTICAL OR SIMILAR PRODUCTS OR PROCEDURES, NOR DO THEY REPRESENT AN ONGOING QUALITY ASSURANCE PROGRAM UNLESS SO NOTED. THESE REPORTS ARE FOR THE EXCLUSIVE USE OF THE ADDRESSED CLIENT AND ARE NOT TO BE REPRODUCED WITHOUT WRITTEN PERMISSION.