Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Cambridge Phase 1-LR 940804 (4)
J G EOTECHNICAL E GEE Consultants, Inc. E J NVIRONMENTAL 2540 Glenda Lane · Suite 108 · Dallas, Texas 75229 · (214) 620-9791 · Fax (214) 620-9794 REPORT OF CONCRETE MIX INSPECTION Report Date: August 4, 1994 Date Concrete Placed: July 28, 1994 Standard 6'x12' Client: Bea~er Development Corporation Area 28.27 Square Inches Project: Estates of Cambridge Manor Concrete Report No.: 2 Contractor: Burkard Utility Contractors Concrete Supplier and Plant: Lattimore Materials Co./Plant #3 Location of Placement: Manho 1 e s,~. ~o B,,,~,w~. INSPECTION DATA MATERIALS Mix Number: Time Sample Batched: 2:56 pm Ccmem: Time Sampled: 3:45 pm Sample Location: Manhole. Line A. Slation 8+97 Fly Ash: Truck,Ticket No: 300/3004900 Coarse Aggregate: Temperature: Intermediate Aggregate: Ambient Range: 97°F Fine Aggregate: Concrete Range: 86°F Slump Range (inchcs): 3' Admixtures: Weathcr Conditions: Partly Cloudy I w/Air . Time Started: 2:45 pm 2 Time Completed: 4:20 pm Added Water: Sample Air Content (4): No test Total Cubic Yards Placed: 9.0 Required Strength (Lbs.;sq.in.): 3.600 Speciz~n Measured A~ Dine To~i Load C~i~ N~r SI~, ~.~ ~ s, T~ (L~.~ (L~. '~.~. ECM 4 3" 7 08/04/94 120,480 4,260 ECM 5 3" 28 08/25/94 ECM 6 3" 28 08/25/94 Test Mc~ Util~ F~ ~g~ar A~M C-31.C-39. C-;a3 [.~ N~ o~i~, Cylinde~ Made By: K. Mc. Remarks and/or Distribution: cc: Bill Anderson - Dowdy, ~dc~n and Associates. Inc. ~' Davis - City of Coppell G~ ~su~s~ X~C. Review~ by: AH let~m and mgo~s am for d~ eaclusi,n~ us~ of th~ climm to w'amn 0~ey am add,Meed ~ s~ ~ ~ ~ ~'i~ ~ ~ ~ of G~ C~, ~. T'n~ i of ~ nan~ nmmt ~c~ive prior writt~.a al:~n'al. O~f kt~u'm nad ~por~ npl~ly c~y to ths~ ~mpl~ te~l~d ~'~ ~ an~ a~ n~ ~ in~i~ativ~ of ~ quamitie~ of appm~c~ly kk~ticai of similar l~odu~s.