Loading...
Cambridge Phase 1-LR 940729J G EOTECHNICAL E NGINEFRING GEE Consultants, Inc. E I 2540 Glenda Lane · Suite 10g · Dallas, Texas 75229 · (214) 620-9791 · Fax (214) 620-0794 REPORT OF CONCRETE MIX INSPECTION Report Da~: July 29, 1994 Da~ Concret~ P{aeed: July 22, 1994 Standard 6'x12' Cliea,: Beamer Development Corporation Area 28.27 Squa~ Inches Project: Estates of Cambridge Manor Concret~ R,'port No.: Con,mc,or: Burkard Utility Contractors Con:~t¢ Supplier and Plant: Lattimore Materials Co./Plant #3 Loca,ion of Placement: Manhole - Line A Station 0+00 MATERIALS s~, ssu .~.~w~. INSPECTION DATA D~-~i~io~ !LI~;CuYd~ Mix Number: Time Sample Batched: 3:13 pm Cement: Time Sampled: 4:00 pm Sample Location: 100 yards N of DeForest Ln on MaeArthur Fly Ash: Tmclo'Fieket No: 283,"3004734 Coarse Aggregate: Temperature: Imermediate Aggregate: Ambient Range: 98°F Fine Aggregate: Conere,e Range: 96°F Slump Range (in,'hes): 2 ~A Admixtures: Weather Conditions: Pauly Cloudy 1 w/Air Time Started: 2:00 pm 2 Time Compl¢,ed: 5:00 pm Added Water: Sample Air Con,ent (%): No test Total Cubic Yards Placed: 7.0 Required Strength (Lbs.isq.in.): 3.600 SW-cur~x Measured A~: I~R: Total Load N uml~r Slump !;,n.I i{~ys I Te.~,,-A I Lbs.{ f Lhs.-Sq.ln.) ECM 1 2% 7 07/29/94 141,300 5,000 ECM 2 2% 28 08/19/94 ECM 3 2% 28 08/19/94 'r.t .x~.~ L'~a ~=,~ I~, Cylinders Made By: J. R · AoeFM C-31.C-39.C-143 ,L'nies~ No~ Remarks and/or Distribution: cc: Bill Anderson - Dowdy. Anderson and Associates. Inc. G~ C:onsu..Ltants, Tn(::. Reviewed by: AH le~tera and eqmn~ aec: fo~ Oae exclmiv~ uae of the cliem to wban ~-y am aadmaa~d and. ahall ~ be e~in~iuced withota 0~ full ap~ of GEE Comub. an~, Inc. The, uae of c~' natre rnuat ..~eive ~ prioe writle~ approval. Our u'tmra and mpo~ apply eniy to ~ mmplgL'~__~ and'or insp~t~[ and tre not n~easa~ly indicatb,~ o~'