Cambridge Phase 1-LR 940729J G EOTECHNICAL
E NGINEFRING GEE Consultants, Inc.
E I
2540 Glenda Lane · Suite 10g · Dallas, Texas 75229 · (214) 620-9791 · Fax (214) 620-0794
REPORT OF CONCRETE MIX INSPECTION
Report Da~: July 29, 1994 Da~ Concret~ P{aeed: July 22, 1994 Standard 6'x12'
Cliea,: Beamer Development Corporation Area 28.27 Squa~ Inches
Project: Estates of Cambridge Manor Concret~ R,'port No.:
Con,mc,or: Burkard Utility Contractors
Con:~t¢ Supplier and Plant: Lattimore Materials Co./Plant #3
Loca,ion of Placement: Manhole - Line A Station 0+00
MATERIALS s~, ssu .~.~w~. INSPECTION DATA
D~-~i~io~ !LI~;CuYd~
Mix Number: Time Sample Batched: 3:13 pm
Cement: Time Sampled: 4:00 pm
Sample Location: 100 yards N of DeForest Ln on MaeArthur
Fly Ash: Tmclo'Fieket No: 283,"3004734
Coarse Aggregate: Temperature:
Imermediate Aggregate: Ambient Range: 98°F
Fine Aggregate: Conere,e Range: 96°F
Slump Range (in,'hes): 2 ~A
Admixtures: Weather Conditions: Pauly Cloudy
1 w/Air Time Started: 2:00 pm
2 Time Compl¢,ed: 5:00 pm
Added Water: Sample Air Con,ent (%): No test
Total Cubic Yards Placed: 7.0
Required Strength (Lbs.isq.in.): 3.600
SW-cur~x Measured A~: I~R: Total Load
N uml~r Slump !;,n.I i{~ys I Te.~,,-A I Lbs.{ f Lhs.-Sq.ln.)
ECM 1 2% 7 07/29/94 141,300 5,000
ECM 2 2% 28 08/19/94
ECM 3 2% 28 08/19/94
'r.t .x~.~ L'~a ~=,~ I~, Cylinders Made By: J. R ·
AoeFM C-31.C-39.C-143 ,L'nies~ No~
Remarks and/or Distribution:
cc: Bill Anderson - Dowdy. Anderson and Associates. Inc.
G~ C:onsu..Ltants, Tn(::. Reviewed by:
AH le~tera and eqmn~ aec: fo~ Oae exclmiv~ uae of the cliem to wban ~-y am aadmaa~d and. ahall ~ be e~in~iuced withota 0~ full ap~ of GEE Comub. an~, Inc. The, uae of c~' natre rnuat ..~eive
~ prioe writle~ approval. Our u'tmra and mpo~ apply eniy to ~ mmplgL'~__~ and'or insp~t~[ and tre not n~easa~ly indicatb,~ o~'