Loading...
Cambridge Phase 1-LR 940729 (2)J G EOTECHNICAL E GEE Consultants, inc. 2540 Glenda Lane · Suite 108 · Dallas, Texas 75229 · (214) 620-9791 · Fax (214) 620-9794 REPORT OF IN-PLACE DENSITY AND MOISTURE OF SOIL Density Report No.33 Method: ASTM D2922 D3017 D698 Page I of 1 Client: Beamer Development Company Malarial I~fimio= Max. Dry Optimum Density Moistur~ Project: Estates of Cambridge Manor Phase I (Lbs/CuFf) C0ntent (%) Test Date: July 27, 1994 1. Dark Gray Sandy Clay 101.1 2. Brown Clayey Sand 107.1 14.3 Report Date: July 29, 1994 3. Yellowish Brown Olive Gray Clayey Sand 114.3 9.8 4. Yellowish Brown Clayey. Sand w/Gravel 115.2 9.3 Required Density (%): 95% to 105% 5. Dark Gray Silty. Clay 94.6 21.1 6. Gray Shale 90.2 24.0 Required Moisture (%): ,-3%, Optimum ?5% 7. Yellowish Brown and Light Gray "Sand 103.4 8.4 Mat Locatio~'£1~'ation (ar~'or~ Lift In. Pla~ Ir,-Plac~ No. DE,~' Demity Moiatu~ Compact. iota .No. 5 Station 5+00. line A. 3rd lift 240 86.6 26.1 91.5 6" 5 Station 5-05, lin,' A. 2nd lift 241 90.3 25.1 95.4 6' 5 Station 5 + 10. line A. Ist 242 86.4 25.8 91.3 6" All test meet the~.pmjeet specifications cc: Bill Anderson - Dowdy. Anderson and Associates. Inc. ~') Larry. Davis - City of Coppeil il/ . .J ~;