Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Cambridge Phase 1-LR 940712
I G EOTECHNICAL E GEE Consultants, Inc. E I NVIRONMENTA~- 2540 Glenda Lane * Suite 108 · Dallas, Texas 75229 · (214) 620-9791 · Fax (214) 620-9794 REPORT OF IN-PLACE DENSITY AND MOISTURE OF SOH. Method: ASTM D2922 D3017 D698 Page 1 of 2 Client: Beerier Development Company I~msity Me~m~ tI.~,CuF0 Co~ (~) Project: Estates of Cambridge .Manor Plmse I. Gray :~ale 90.2 24.0 Test Date: July 5, 1994 2. Report Date: July 12, 1994 3. Required Density (%): 95% to 105% 4. Required Moisture (%):+3%, Ol~imum +5% Locatio~'Ek'~atio~ No. Test No. Kings Canyon Road, Station I +50, lift #7- RETEST//141 202 92.2 25.0 102.2 Kings Canyon. Station 3+50. lift #7 - RETEST #142 203 92.8 24. I 102.0 6" Cambridge Manor Lane. Station 9+50, lit~ #92 - RETEST #147 204 91.2 25.0 101.1 6' Cambridge Manor Lane. Station 12~-00. lit~ - RETEST//153 ~-05 94.6 24.9 104.9 6~, Cambridge Manor Lane. Station 4+50. lift #2 - RETEST #154 206 95.3 25.2 105.7 6' Castle Creek Drive. Station 4+50. lift #2 - RETEST #158 207 93.2 27.9 103.3 6' Castle Creek Drive. Station 7+00. lift ~ - RETEST #159 208 9 !. 9 9,6.5 ! 01.9 6' Cambridge Manor Lane, Station 9+00, lift//3 - RETEST//161 209 93.7 24.6 103.9 6' Cambridge Manor Lane, Station 14+50, lit~ #3 - RETEST//164 210 94.1 25.7 104.3 6' All t~st meet the project specifications GEE Consultants, Inc. (214) 620-9791 REPORT OF IN-PLACE DENSITY AND MOISTURE OF SOIL Method: ASTM D2922 D3017 D698 Page 2 of 2 Client: l~amer Developm~t Company Moi~nm~ (Li~/CuFt) Com~ (.~) P~oject: Estates of Cambridge Manor Phas~ ! 1. Gray Shale 90.2 2,{.0 Test Date: July $1994 Report Date: July 12, 1994 3. Required Density (%): 95% to i05% 4. Required Moisture (%):±3%, Optimum +$% Mai Lo~atlou,'Ei~,'a6ou taud/o~{ Li~ .In-Pla~e In-Pla~ Per~-m .'40. Dr), Density Moistu~ Compaction No. (Lt~CuFl{ I Cambridge Manor Lane. Station 17+00, lift #3 - RETEST #165 211 92.8 26.0 102.9 6' { Kings Creek Road. Station 3+75, lift #8 - RETEST #160 212 92.7 25.4 102.8 6' ! Kings Creek Road, Station I +50. lift #8 - RETEST #161 213 93.5 24.6 103.7 6" All test meet the project specifications ¢¢: Bill Anderson - Dowdy, Anderson and Associates. [nc. Larry Davis - City of Coppell