Tax 2010A-CS130301
MEMORANDUM
FROM THE
DEPARTMENT OF ENGINEERING
To: George Marshall, P.E., Traffic Engineer
From: Albert Samaniego, Construction Inspector
Office Phone: (972) 304-3685
Fax: (972) 304-3570
Date: March 1, 2013
RE: WALK-THRU INSPECTION
Willow Springs Dr. Reconstruction Project
A final walk-thru for paving, utilities and drainage on the referenced project has been
scheduled for:
MONDAY, MARCH 4, 8:00 A.M.
Please let me know if I can be of further assistance.
cc: Shane Huffman, RKM Utility Services
Streets Dept.
Utilities Dept.
Fire Marshal Office
"CITY OF COPPELL ENGINEERING - EXCELLENCE BY DESIGN"