Loading...
Coppell Ind 2-LR130223 CONCRETE CYLINDER TEST REPORT Tradepoint Center II Creekview Road & Freeport Parkway Coppell, Texas REPORTED TO:REPORT NO. Hillwood 170 3090 Olive Street, Suite 300 REG PROJECT NO. 18520 Dallas, Texas 75219 SAMPLE DATE: 02-15-13 ATTN: Mr. Kerry Roetzel TECHNICIAN: C. Winchester PAGE: 1 of 3 CONTRACTOR: Hillwood Construction Services Location of Sample Set Number Location Quantity Represented (c.y.) 1 Paving: 80’S, 140’E from SE building corner 20/850 2 Paving: 35’S, 130’E from SE building corner 120/850 3 Paving: 78’S, 200’E from SE building corner 220/850 4 Paving: 30’S, 180’E from SE building corner 330/850 5 Paving: 10’N, 135’E from SE building corner 420/850 6 Paving: 55’N, 230’E from SE building corner 520/850 7 Paving: 160’N, 220’E from SE building corner 620/850 8 Paving: 65’N, 135’E from SE building corner 720/850 9 Paving: 210’N, 150’E from SE building corner 810/850 Design Information Source of Concrete Mix Identification Specified Strength (psi) Potter 7752 4000 Test Results SetCylinder Age @ Total Load Compressive Average Strength No. ID Date Tested Test(lbs.)Strength (psi) (psi) 1 4570 02-22-13 7 100310 3550 4570 03-15-13 28 4570 03-15-13 28 4570 Hold H 2 4571 02-22-13 7 126870 4490 4571 03-15-13 28 4571 03-15-13 28 4571 Hold H 3 4572 02-22-13 7 117980 4180 4572 03-15-13 28 4572 03-15-13 28 4572 Hold H 4 4573 02-22-13 7 124150 4390 4573 03-15-13 28 4573 03-15-13 28 4573 Hold H 2424 STUTZ DR. SUITE 400 DALLAS, TX 75235 [214] 350 5600 [214] 350 0019 TELFAX REPORT NO. 170 REG PROJECT NO. 18520 SAMPLE DATE: 02-15-13 PAGE: 2 of 3 Test Results SetCylinder Age @ Total Load Compressive Average Strength No. ID Date Tested Test(lbs.)Strength (psi) (psi) 5 4574 02-22-13 7 96070 3400 4574 03-15-13 28 4574 03-15-13 28 4574 Hold H 6 4575 02-22-13 7 117920 4170 4575 03-15-13 28 4575 03-15-13 28 4575 Hold H 7 4576 02-22-13 7 113490 4020 4576 03-15-13 28 4576 03-15-13 28 4576 Hold H 8 4577 02-22-13 7 126860 4490 4577 03-15-13 28 4577 03-15-13 28 4577 Hold H 9 4578 02-22-13 7 120620 4270 4578 03-15-13 28 4578 03-15-13 28 4578 Hold H Cylinder Data Air ConcreteAir Unit SetCylinder SlumpTime of Temp.Temp.EntrainmentWeightTicket 3 No. ID (inches)Sample(°F)(°F)(%) (lbs/ft)Number 1 4570 5.5 4:25 AM 52 63 5.1 151.2 31041 2 4571 5.25 5:10 AM 50 63 4.9 151.2 31051 3 4572 5.0 6:10 AM 49 63 4.9 140.6 31061 4 4573 6.0 7:10 AM 48 62 4.8 149.6 31072 5 4574 5.75 8:15 AM 47 62 4.8 150.2 31081 6 4575 4.75 9:55 AM 46 62 4.8 152.0 31091 7 4576 5.5 10:50 AM 46 62 4.9 150.6 31101 8 4577 4.5 12:00 PM 47 62 4.9 152.0 31111 9 4578 5.0 1:05 PM 44 61 5.0 150.6 31120 Note: (1) Concrete was sampled in accordance with ASTM C-31 (2) Concrete cylinders were tested in accordance with ASTM C-39 REPORT NO. 170 REG PROJECT NO. 18520 SAMPLE DATE: 02-15-13 PAGE: 3 of 3 Submitted by: E-Mail Distribution: (1) Hillwood/Mr. Kerry Roetzel REED ENGINEERING GROUP, LTD. (1) Hillwood Construction Services/ Registration Number F-3114 Mr. Gary Jones (1) Halff Associates/ Mr. Stephen Crawford (1) Halff Associates/Mr. Lance Clinton (1) Macgregor Associates/ Bill Woolwine Mr. Thomas Holland Sr. Manager, CMT (1) Macgregor Associates/ BW/cn Mr. Lee Rader (1) City of Coppell/Mr. Lee Stone (1) City of Coppell/Mr. Michael Arellano (1) City of Coppell/Mr. Rick O’Dell CONCRETE CYLINDER TEST REPORT Tradepoint Center II Creekview Road & Freeport Parkway Coppell, Texas REPORTED TO:REPORT NO. Hillwood 172 3090 Olive Street, Suite 300 REG PROJECT NO. 18520 Dallas, Texas 75219 SAMPLE DATE: 02-16-13 ATTN: Mr. Kerry Roetzel TECHNICIAN: J. Watson PAGE: 1 of 3 CONTRACTOR: Hillwood Construction Services Location of Sample Set Number Location Quantity Represented (c.y.) 1 Paving: 285’N, 264’E from SE building corner 40/900 2 Paving: 381’N, 231’E from SE building corner 110/900 3 Paving: 444’N, 251’E from SE building corner 230/900 4 Paving: 337’N, 148’E from SE building corner 340/900 5 Paving: 397’N, 168’E from SE building corner 410/900 6 Paving: 450’N, 200’E from SE building corner 510/900 7 Paving: 537’N, 260’E from SE building corner 620/900 8 Paving: 490’N, 145’E from SE building corner 710/900 9 Paving: 573’N, 190’E from SE building corner 810/900 Design Information Source of Concrete Mix Identification Specified Strength (psi) Potter Ready Mix 7752 4000 Test Results SetCylinder Age @ Total Load Compressive Average Strength No. ID Date Tested Test(lbs.)Strength (psi) (psi) 1 4602 02-23-13 7 108490 3840 4602 03-16-13 28 4602 03-16-13 28 4602 Hold H 2 4603 02-23-13 7 108000 3820 4603 03-16-13 28 4603 03-16-13 28 4603 Hold H 3 4604 02-23-13 7 148440 5250 4604 03-16-13 28 4604 03-16-13 28 4604 Hold H 4 4605 02-23-13 7 96920 3430 4605 03-16-13 28 4605 03-16-13 28 4605 Hold H 2424 STUTZ DR. SUITE 400 DALLAS, TX 75235 [214] 350 5600 [214] 350 0019 TELFAX REPORT NO. 172 REG PROJECT NO. 18520 SAMPLE DATE: 02-16-13 PAGE: 2 of 3 Test Results SetCylinder Age @ Total Load Compressive Average Strength No. ID Date Tested Test(lbs.)Strength (psi) (psi) 5 4606 02-23-13 7 122460 4330 4606 03-16-13 28 4606 03-16-13 28 4606 Hold H 6 4607 02-23-13 7 95250 3370 4607 03-16-13 28 4607 03-16-13 28 4607 Hold H 7 4608 02-23-13 7 118370 4190 4608 03-16-13 28 4608 03-16-13 28 4608 Hold H 8 4609 02-23-13 7 124510 4410 4609 03-16-13 28 4609 03-16-13 28 4609 Hold H 9 4610 02-23-13 7 147620 5220 4610 03-16-13 28 4610 03-16-13 28 4610 Hold H Cylinder Data Air ConcreteAir Unit SetCylinder SlumpTime of Temp.Temp.EntrainmentWeightTicket 3 No. ID (inches)Sample(°F)(°F)(%) (lbs/ft)Number 1 4602 6.5 4:44 AM 33 52 5.5 142.4 31130 2 4603 6.0 5:25 AM 33 49 6.5 141.2 31137 3 4604 6.0 6:43 AM 33 55 5.0 144.0 31149 4 4605 5.5 7:39 AM 39 54 5.0 141.2 31160 5 4606 4.5 8:21 AM 45 54 5.0 142.8 31167 6 4607 5.0 9:25 AM 61 55 5.0 145.6 31177 7 4608 5.0 11:23 AM 65 59 6.0 144.4 31188 8 4609 5.5 12:28 PM 65 64 5.0 145.6 31199 9 4610 6.5 1:21 PM 64 66 4.0 146.0 31209 Note: (1) Concrete was sampled in accordance with ASTM C-31 (2) Concrete cylinders were tested in accordance with ASTM C-39 REPORT NO. 172 REG PROJECT NO. 18520 SAMPLE DATE: 02-16-13 PAGE: 3 of 3 Submitted by: E-Mail Distribution: (1) Hillwood/Mr. Kerry Roetzel REED ENGINEERING GROUP, LTD. (1) Hillwood Construction Services/ Registration Number F-3114 Mr. Gary Jones (1) Halff Associates/ Mr. Stephen Crawford (1) Halff Associates/Mr. Lance Clinton (1) Macgregor Associates/ Bill Woolwine Mr. Thomas Holland Sr. Manager, CMT (1) Macgregor Associates/ BW/cn Mr. Lee Rader (1) City of Coppell/Mr. Lee Stone (1) City of Coppell/Mr. Michael Arellano (1) City of Coppell/Mr. Rick O’Dell