Loading...
Cambridge Phase 1-LR 940712 (2)J G EOTECHNICAL ENGINEERING GEE Consultants, Inc. E INVIRONMENT -' -- 2540 Glenda Lane · Suite 108 · Dallas, Texas 75229 · (214) 620-9791 · Fax (214) 620-9794 REPORT OF IN-PLACE DENSITY AND MOISTURE OF SOIL Method: ASTM D2922 D3017 13698 Page 1 of 1 Client: Reamer Developmem Company Material E~mni~ion M~x.I)tT Dm~ity Moi~mm Project: F.~lai~ of Cambridge Manor Phase I 1. Dark Oray Sandy Clay 101.1 Test Date: July 7, 1994 2. Brown Clayey Sand 107.1 143 Report Date: July 12. 1994 3. Yellowish Brown Olive Gray Clayey Sand 1143 9.8 Required Density (%): 95% to 105% 4. Yellowish Browa Clayey Sand with Gravel 115.:~ 9.3 Required Moisture (%):+3%. Opfmam +5% 5. Dark Gray Silty. Clay 94.6 21.1 Mat Locatio~-El~'atio~ (ar~'or~ Li~ In-Pla~ In-Pla~ P~rc~at No. Do/.' D~n-~ity MoLmttm~ Teat ( Ll~:Cul:t~ Comma No. proh~ 2 Castle Creek Drive, Suation G-,-50. Lii~//4 214 103.2 17.7 96.3 6' 2 Lot 12. Block D. 6th lit~ 215 110.0 16.6 102.7 6~ 2 Lot 14, Block D. 8th 216 96.9 19.l 95.9 6" I Lot 16. Block D. 9th lift 217 105.0 19.2 103.9 6" Bill Anderson - Dowdy, Anderson and Associates. Inc. Larry. Davis - City of Copp¢ll