Loading...
Cambridge Phase 1-LR 940705 REVISED [ G EOTECHNICAL ENGINEERING GEE Consultants, Inc. 2540 Glenda Lane · Suite 10g · ~allas, lexas 7522~ · (214) 620-9791 · [ax (214) 620-9794 REPORT OF IN-PLACE DENSITY AND MOISTURE OF SOIl. Method: ASTM D2922 D3017 D698 Page 1 of 3 Client: Beamer Development Company ~,~,~] oc~.~io, Max. Or/ Demity Moisture Project: Estates of Cambridge .Manor Phase I ;Lln, CuFtj 1. Dark Gray Sandy Clay 101.I 14.2 Test Date: June 13, 1994 2. Brown Clayey. Sand 107.1 143 Report Date: July 5. 1994 3. Yellowish Bro~a and Olive Gray Clays' Sand 114.3 9.8 Required Density (%): 95% to 105% 4. Yellowish Bro~a Clayey Sand ~ith Gravel 115.2 9.3 Required Moisture (%):+3%, Opthnum +5% 5. Dark Gray Sil~' Clay 94.6 21.1 Mat Locatiotx"E~.~tion ,and 'or: 1.i~'t ln-I)lao: In-Dl~c~ Percem No. Eh3'. Dcm iLv Moisture Corm~t,-tion Te~t . No. 'Ll~s/Cul:tl Co~nt t %) Probe 4 Block A. Lot 4. 2nd lift 110 118.3 13.3 102_.'7,' 6" 2 Block A, Lot 6. 2nd lift 111 103.2 17.8 96.3 6~ 2 Cambridge Manor Lane. Statio~ g?20. 3~d lift 112 107.9 17.2 1£().7 6n 3 Block g. Lot 5. 10th lift 113 109.2 17.6 95.5 6' .~ Block B. Lot 7. 10th ]ift 114 103.4 20.3 96.5 6~ 2 Block D, Lot 1.6th lift 115 114.7 15.1 107.1 6~ 3 Block D, Lot 2. 6lb lift 116 120.2 13.3 105.2 6~ 3 Block D. 1.ot 5.6th lift 117 115.0 15.6 100.6 2 Block D, Lot [5.6~h lift lib lll.l 17.g 103.7 6~ Our letters and report.~ are for the exclusive usc of thc :[ient to whom the)' are addressed. The use of our name must receive our prior wn.~ten approval Our !eUers :md reporls apply ovlly to the sample tested alad/or insoeeted. ;md are no~ necessarily mdicatls'e of the quantifies of apparently identical or similar product_s. REVI~D GEE Consultants, Inc. (214) 620-9791 REPORT OF IN-PLACE DENSITY AND MOISTURE OF SOII Method: ASTM D2922 D3017 D698 Page 2 of 3 Client: Beamer Developmw~t Company Mamrial De. scfi~io~ Mmv. Do'. Ot~mum I~mity Moism~ Project: Estates of Cambridge Msmor Plmse I 1. Dark Gray 'Samly Clay 101.1 14.2 Test Date: June 13, 1994 2. Brown Clayey Sa~d 107.1 14.3 Report Date: July $, 1994 3. Yellowish Brown and Olive Gray Clayey Sand 114.3 9.8 Required Density (%): 95% to 105% 4. YeBowish Brown Clayey Sand with Gravel 115.2 9.3 Required Moisture (%):+3%, Optimum +$% 5. Dark Gray SHty Clay 94.6 21.1 Mat LocatiomElevation ;anfl/o~ Lift In-Place la-Place No. DE,.' Der~ityMoisture Teat ~LI~.CuFt~ C'ontem .Mo. 2 Block D. Lot 13, 5th 119 104.2 17.3 97.2 2 Block D, Lot 7, 5th lift 120 113.3 16.0 105.7 6" 2 Block C. Lot 8.3rd lift 121 110.6 17.5 103.3 6- 2 Block C, Lot 6, 3rd lift 122 109.7 18.6 102.4 6~ 2 Block C, Lot 4.3rd lift 123 110.4 16.6 103.1 6" 2 Block C. Lot 2. 3rd lift 124 108.0 19.7 100.8 6 n 5 Subgrade Cambridge Manor Lane. Station 19+20. 1st lift 125 100.7 23.9 106.4 5 Subgrade Cambridge Manor Lane. Station 17~00, 1st lift 126 98.9 24.7 104.5 6'~ 5 Subgrade Cambridge Manor Lane, Station 15+00, 1st lift 127 96.9 26.7 102.4 6" 5 Subgrade Cambridge Manor Lane. Station 13 +00. Ist lift 128 94.5 19.3 99.8 6' 5 Subgrade Cambridge Manor Lane. Station 10-v00, 1st lift 129 100.6 23.9 106.3 6" Our letters and reports are for the exclusive use of the client to whom they are addressed. The use of our name must receive our prior written approval. Our leners and reports apply ouly to the sample tested and/or insoected, and ave not necessarily indicative of the quantities of apparently identical or simdar products. REVISED GEE Consultants, Inc. (214) 620-9791 REPORT OF IN-PLACE DENSITY AND MOISTURE OF SOIl, Method: ASTM D2922 D3017 D698 Page 3 of 3 Client: Beamer Development Company Matedal ne~q~io~ M~x. Dw Op~num Density Moisture Project: Estate~ of Cambridge .Manor Phase I , 1. Dark Gray Sandy Clay 101.1 14.2 Test Date: June 13, 1994 2. Brown Clayey Sand 107.1 14.3 Report Dat~: July $. 1994 3. Yellowish Brown and Olive Gray Clayey Sand 114.3 9.8 Required Density (%): 95% to 105% 4. Yellowish Brown Clayey Sand with Gravel 115.2 9.3 Required Moisture (%):±3%. Optimum ~-$% 5. Dark Gray Silty Clay 94.6 21.1 Mat LocalicawEl"vation ~and,'orl Lift In-Plac~ In-P]ac~ Pcrcmu Teal No. Do,.- Dm~ir.y Moi~tu~ Pro~ 5 Block D. Lot 10. 1st lift 130 95.5 6" 5 Block D, Lot 12. 1st lift 131 106.1 21.4 112.1 4 Block B, Lot 3.6th lit~ 132 113.2 14.5 98.2 4 Block B, Lot 8, 3rd lift 133 110.8 17.5 109.6 6' Above test results meet specification requirements cc: Bill Anderson - Dowdy, Anderson and Associates, Inc. Larry Davis - City of Coppell Our letters and repor[,~ are for the exclusive use of thc client to whom Ihcy are addres?.ed. The use of our name must receive our prior written approval. Our letters and reports apply only to the sample tested and/or inspected, and are no~ necessarily indicati,,'e of the quantities of apparently identical or similar products.