Loading...
Cambridge Phase 1-LR 940622 (2)G EOTECHNICAL ENGINEERING GEE Consultants, Inc. E INVIRONMENTAL 2540 Glenda Lane · Suite 108 · Dallas, Texas 75229 · (214) 620-9791 · Fax (214) 620-9794 REPORT OF IN-PLACE DENSITY AND MOISTURE OF SOIl. Method: ASTM D2922 D3017 D698 Page 1 of Client: City of Coppell Ms~a~ Oescriv~o, ~x~um Opamum DO' Moisture Dcnsi~' Content Project: W.T. Cozby Library (Lb.~cu~:t~ Percent Test Date: June 17, 1994 I. Reddish Brown Clay Sand 112.5 12.2 Report Date: June 22, 1994 2. Dark Gray Clayey Sand 101.5 18.9 Required Density (%): 95% to 105% 3. Required Moisture (%): +3% Optimum 4. ~tat Location/Elevation (and/or) LiR la-Pla~e la-Place Percent No. D~ Density.' Moisture C,~nnpactica Test No. (LbsiCuFt'~ Con~nt ( .'~ Probe 2 Utility ditch, sewer line, l't lift, 60' south of north end of ditch 95 105.6 17.6 104.0 6" 2 Utility ditch, sewer line, 2" lift, 75' south of north end of ditch 96 98.4 18.3 96.9 6" 2 Utility ditch, sewer line, 3'~ lift, 50' south of north end of ditch 97 109.5 15.6 107.9 6" 2 Utility ditch, sewer line, 6~h lift (final), 68' north of northeast corner 98 108.9 16.4 1.07.3 6" 2 Utility ditch, sewer line, 4ta lift, 40' south of north end of ditch 99 103.7 20.7 102.2 6" 2 Utility ditch, sewer line, 5a lift, 45' south of north end of ditch 100 - 105.4 16.6 103.9 cc: Gary $ieb - City of Coppell lira Bullock - F & S Partners Lan'y Davis - City of Coppell Rob,rt Williams - Brockette Davis Drake, Inc. Mike Sherpinskas o Diversified Construction Services, Inc. Ou~ l~tt~m and r~ort~ am fo~ tho exclu$i'~ u~ of ~ client to whom they am add~$.~d. Thc u~ of out- nam~ must me¢i,,,¢ our prior wrim~-n approval. Our letter~ and r~port~ apply only to thc scruple t¢~ted and/or i~r}~:t~d, and am not nec¢~rily indicatlw o~ fl~e quantiti¢~ of apparently identical or similar product~.