Cambridge Phase 1-LR 940620 E GEE Consultants, Inc.
E
2540 Glenda kane · Suite 108 · Dallas, Texas 75229 · (214) 620-9791 · Fax (214) $20-9794
MOISTURE DENSITY RELATIONSHIP REPORT
Test Report Date: June 20, 1994 Project No: B-94-0178
Client: Beamer Development
Sample Date: June 10, 1994
Project: Estates of Cambridge Manor, Phase I
Identit~cation: Moisture Density Relationship
Test Procedure: ASTM D698
Test Results:
Method ......................................... A
Optimum Moisture Content ............................. 24.0 percent
Maximum Density .................................. 90.2 pounds per cubic foot
Rammer Type ..................................... Manual
Material Description ................................. Gray Shale
Material Origin .................................... On-site Subgrade (Lake)
Moisture Preparation Procedure .......................... Air Dry
Liquid Limit ...................................... 58
Plastic Limit ...................................... 24
Plasticity Index .................................... 34
Percent Passing a No. 200 U.S. Sieve ...................... 94
Technician: K.Mc./L.G.
cc: Mr. Bill Anderson - Dowdy, Anderson and Associates, Inc.
Mr. Larry Davis - City of Coppell
Our lctters and rcpot~ are for th~ exclusive usc of ~c clicat to whom they arc addressed. The use of our name must rcceiv~ our prior writttm approval. Our letters and reports
apply only to ~he sample tcsted and/or inspected, and arc not neccssarily indicative of the quantities of apl~arently identical or similar products.