Loading...
Cambridge Phase 1-LR 940620 E GEE Consultants, Inc. E 2540 Glenda kane · Suite 108 · Dallas, Texas 75229 · (214) 620-9791 · Fax (214) $20-9794 MOISTURE DENSITY RELATIONSHIP REPORT Test Report Date: June 20, 1994 Project No: B-94-0178 Client: Beamer Development Sample Date: June 10, 1994 Project: Estates of Cambridge Manor, Phase I Identit~cation: Moisture Density Relationship Test Procedure: ASTM D698 Test Results: Method ......................................... A Optimum Moisture Content ............................. 24.0 percent Maximum Density .................................. 90.2 pounds per cubic foot Rammer Type ..................................... Manual Material Description ................................. Gray Shale Material Origin .................................... On-site Subgrade (Lake) Moisture Preparation Procedure .......................... Air Dry Liquid Limit ...................................... 58 Plastic Limit ...................................... 24 Plasticity Index .................................... 34 Percent Passing a No. 200 U.S. Sieve ...................... 94 Technician: K.Mc./L.G. cc: Mr. Bill Anderson - Dowdy, Anderson and Associates, Inc. Mr. Larry Davis - City of Coppell Our lctters and rcpot~ are for th~ exclusive usc of ~c clicat to whom they arc addressed. The use of our name must rcceiv~ our prior writttm approval. Our letters and reports apply only to ~he sample tcsted and/or inspected, and arc not neccssarily indicative of the quantities of apl~arently identical or similar products.