Carter Addition Phase III
DEVELOPMENT FEES
PROJECT NAME: Carter Addition, Phase 3
ENGINEER:Dowdey, Anderson
ORIGINATION DATE:
SENTASSESSMENTASSESSED FEEAMOUNT PD DATE
Water Impact Fee$34,569.00
Wastewater Impact Fee$34,569.00
Park Fee$30,840.0030,840.00lh12/16/2011
Roadway Impact-Zone$15,264.0015,264.00lh12/16/2011
Street Sign $772.09772.09ra4/17/2013
Street Light $1,762.201,762.20ra4/24/2013
Construction Inspection$23,637.6923,637.69ra9/12/2012
Pond filling only$408.95408.95ra1/26/2012
Overtime Inspection
Water Tap Inspection$1,150.00
Wastewater Tap Inspection$1,150.00
Water Meter (Domestic)$2,390.85
Water Meter (Fire/Irrig)$0.00
Meter Deposit (Domestic)$690.00
Meter Deposit (Fire/Irrig)$0.00
Utility Final Inspection$1,150.00
Subtotal to Eng.$72,684.9372,684.93$0.00
Total FeesFees PaidAmount Owed
TOTALS
$148,353.7872,684.93$75,668.85
NOTES
Prior To ConstructionDate ReceivedPrior To Final Acceptance
Erosion Control ApprovedAs Built Plan Recd.
E.P.A.-N.O.I. Recd.Paving Bond Recd.
Const. Plan ApprovedUtilities Bond Recd.
$15,944.00
Erosion Contr Escrow
Flood Study fees:FEMA2,500.00
3/3/2011
Review1,000.00
3/3/2011
r 1
r
CASH 5/23//3 096703
RECEIPT Date
o Received Fromo �- �r�S� 1 N C
`° °' 6A-P.TE1 A Dn4 ph
00, 00 in a Address /
a ' N a fill/6r'
V2 18 8 Dollars VS f
x
o .I N For f/O,V CONIX L £S&Cth
A416
V `chi ACCOUNT HOW PAID
C
OUN
ACCCOUNT CASH IIIII
cc U AMT.• ,• /1 9. / / I,• 2',V1//
BALANCE( 9 MONEY ORDER❑ By ?Alb,-
` DUE CREDIT CARD
250 GIBRALTAR ROAD
`Toll gyros.,lilt HORSHAM, PA 19044 Check No. - 9281911 Check Date - 05/20/13 Stub 1 of 1
215-938-8000
r INVOICE NO INVOICE DATE COMMENT GROSS DEDUCTIONS AMOUNT PAI11
130516/3124 051613 EROSION CONTROL 15,944.00 15,944.00
J
Toll'Bros., Inc CHECK No. 09281911 „20
1210
250 Gibraltar Road 'VENDOR NO CHECK DATE CHECK AMOUNT
Horsham PA 13044
215-938-8000 254816 05/20/13 $""1 5,944.00
** INVALID SIX MONTHS AFTER DATE ISSUED **
PAY
FIFTEEN THOUSAND NINE HUNDRED FORTY FOUR AND 00/100*`******************************
TO THE City Coppell .fr
ORDER OF Planning Dept wells Fargo sank,N.A.
255 Parkwa Blvd PO Box 9478 -�� "----:::::=
y San Franasca,CA ���. ti`_� i.i;;i���"� 1`�-
Coppeil TX 75019-9478 �.. "_:/;;::;�.;-� �_-J
'' ESTIMATE
Z.'r r-:F
-65:. a.
MEADE SERVICING GROUP INC. HUB #1202908174700
PO BOX 2107 (HUB CERTIFICATE ATTACHED)
ROCKWALL,TX 75087
469-628-8070
FAX:972-772-0001
BD IXO N @ M EADEG ROU P.NET international Erosion Control Association
JOB NAME DATE
CARTER PARSE 3 MAINTENCE 5-15-13
1BID ITEM DESCRIPTION UNIT QUANTITY UNIT PRICE AMOUNT
`` BROADCAST SEED AC 12 $412.00 $4,944.00
MAINTENANCE OF EROSION CONTROL(FOR TWO LS 1 $11,000.00 $11,000.00
YEARS)
TOTAL 315,944.00
Exclusions:Clearing,cleaning,repair,maintenance,hand digging,rocky soli,inspections,re-vegetation of disturbed ground due to removal of erosion control
Items,seedbed preparation,emulsified asphalt,water sources,water pump,water cost,debris/root/rock removal,back-filling&grading of any soil other than the
imported compost for(BOS)&(PB)bid Items,soil analysis,traffic control,and mowing.Quotes for these items are available upon request.Please call 469-628-8070
Notes:
1)Inspection will be billed monthly and performed weekly.
2)Add$300.00 for NOI Fee if site is greater than 5 AC
3)1 Free Mobilization-Additional t,fobiliration @ 5225.00
4)The client is responsible for providing a water source(including water&meter fees)for hydromulch seeding and sod,and Is also responsible for the maintaining
and watering of seed and or sod after install.5)Item 161-2002 will consist of furnishing,placing,and blending 1"of compost with 3"of topsoil The 3"of topsoil will
be furnished and placed to grade by others,After blending the 1"of compost,any debris root or rock removal will be done by others.
5)In area where sod or compost are to take place,the grade adjacent to all pavement,structures,sidewalks and back of curbs is to be left an inch(1")Or(2")low
for(DOS).
Thank you for choosing Meade Servicing Group INC,
290 GIBRALTAR ROAD
Toll`Bros.,Inc HORSHAM, PA 19044
215-938-8000 Check No. - 9270232 Check Date - 04/16/13 Stub 1 of 1
INVOICE NO INVOICE DATE COMMENT GROSS DEDUCTIONS AMOUNT PAI,
3124STREETLIGHT 032613 CARTER ADD PHS# 3: 1,762.20 1,762.20
J
F I
doll giros., Inc CHECK NO. 09270232 „-10
■ 1210
250 Gibraltar Road 'VENDOR NO. CHECK DATE CHECK AMOUNT
Horsham PA 19044
215-938-8000 . ***
** INVALID SIX MONTHS AFTER DATE ISSUED ** 222417 04/16/13 $ 1,762.20
PAY
ONE THOUSAND SEVEN HUNDRED SIXTY TWO AND 20/100
ORDER DER Water r Coppell • /fin""w` etilt)::1:
ORDER OF: Water Billing Dept ,�PO BOX 9478 Wens Fncs Bank,N.a 7-•"":".:•••••
- San Francisco,CA � _�ji����i���-- .
Coppell TX 75019-9478 '''
H
r
CASH //-2 '/i3 096699
RECEIPT Date
Received From • r ()L I L3 R t.0 S1 Jive
T3 rn i�
a8 Address c . L ADDI �• U. n. -7
0 m °o Dollars$ !42,x,
ma ms xi -
Oc- For °''V l=
n
a O^'
V V ACCOUNT HOW PAID
ACOUN CASH
ACCOUM��y'/` - yy per'
0
BALANCE / �2 20 MONEY ORDER CI 92723 y 'R4JI
DUE.. ? ,,. CREDIT CARD❑ _
L -
City Of Coppell"✓
-water DApt ;leiG1N'EC! Al(r' 1)64")'
PO Box 9478
Coppell TX 75019-9478
December 21, 2012
J. Casey Ross, P.E.
Dowdey, Anderson & Associates, Inc.
5225 Village Creek Drive, Suite 200
Plano, Texas 75093
Re: Carter Addition Phase III
Street Light Fee Assessment
The following assessment represents the number of light units as established by Oncor Electric
Delivery Company for Carter Addition Phase III Subdivision:
5 lights @ $352.44 per light = $1,762.20
Prior to the final acceptance of this project, a check in the amount of $1762.20 should be made
payable to the City of Coppell and forwarded to the Engineering Department.
If you have any questions, or need any additional information or clarification, please feel free to
contact me at your convenience.
Sincerely,
Michael Garza, P.E.
Civil Engineer
Office Phone: (972) 304-7019
Fax: (972) 304-3570
E-mail: mgarza@coppelltx.gov
1
250 GIBRALTAR ROAD in
�DUBICAS.�Inc HORSHAM, PA 19044
215-938-8000 Check No. - 9270019 Check Date - 04/12/13 Stub 1 of 1 13
r INVOICE NO INVOICE DATE COMMENT GROSS DEDUCTIONS AMOUNT PAI S
3124COPPELL0313 032813 772.09 772.09 '
0
01
a
O
7J
S W
i
C4
N
x
N
o
- - I
Toll crfros, Inc CHECK NO 09270019 ,':29
M 250 Gibraltar Road
Horsham PA 19044 VENDOR NO CHECK DATE CHECK AMOUNT
215-938-8000
** INVALID SIX MONTHS AFTER DATE ISSUED * 222417 04/12/13 $ 772.09
PAY
SEVEN HUNDRED SEVENTY TWO AND 09/100********'**************************************
ORDER DER City Of Coppell ��"w` /
ORDER OF Water Billing Dept
PO Box 9478 Walls Fargo sank N.A. __
San Francisco,CA ,. _ j//j/4/;� _
CoPPsll TX 75019 9478 <,��.- . -_-----, ;/
1
le
CASH 4//7//,..3 082599
RECEIPT n Date
Receive m ( " / PA.
—y m°' °7+a€L
� Address -7�Z,D
C.5 r Dollars$ ._L_1 11
i° For �l6-1- ' 1-4244---'
0 s U ACCOUNT HOW PAID
N AMT OF
CASH
ACCOUNT��rrl/,� ,,
U AMT PAI#172 O q CHECK 4427007
BALANC MONEY ORDER❑ By i
DUE CREDIT CARD❑
MEMORANDUM
FROM THE
DEPARTMENT OF PUBLIC WORKS
DATE: February 28, 2013
TO: Mike Garza
FROM: George Marshall
RE: Carter Phase III
The following fee should be assessed and collected on the above referenced project.100%due prior
to final acceptance of project.
Street Signs Fee
s follawj g_ sment is being made in accordance with the City of Coppell Subdivision
Ordinance Appendix A Chapter VIII A. The following costs of those sign materials required are
based on current pricing which is reviewed on a regular basis.
SIGN UNIT PRICE QUANTITY EXTENDED PRICE
No Parking $90.57 0 $0.00
Speed Limit $90.57 2 $181.14 **
Street Names $113.05 0 $0.00
Yield - w/names $178.96 0 $0.00
Stop - w,names $178.96 2 $357.92
Warning Sign $100.64 0 $0.00
Keep Right(median) $90.57 0 $0.00
Object Markers(L&R) $27.22 0 $0.00
Labor $15.00 11 $165.00
5%Administrative cost $0.05 1360.53 $68.03
Other $0.00 0 $0.00
TOT $772.09
*cost breakdowns may be obtained by written request
**25 MPH needs posting on each end of a street to be enforceable
10 MPH for alleys
Sign Fee Revised 8/24/00
CONSTRUCTION DEVELOPMENT PERMIT APPLICATION
Name of Applicant
Address of Applicant
���� N1 li zzc Date Submitted 9- //- /�
Phone Number �� - j / -� Fax Number
Location of Construction (address, if available):
Subdivision �,,.:� Section # I j I Block # Lot #
OR Survey /Abstract #I I Acreage , Z f-3
Location description (attach vicinity map): ��s� %.��, :5 lle cue,
1. Type of proposed construction or development:
XResidential C- Alteration of a natural waterway drainage course
C Non- Residential C' Other (describe & attach drawing or sketch)
(�) Placement of Fill (in right -of -way or on private property)
2. Description of Construction Permit requested:
Paving
Sidewalk
Drive Approach
Excavation
Fire Lane
Bridge
Median or Landscape
Water Main
R.C.P.
ZSanitary Sewer Main
j Flume
Inlet
❑ Box Culvert
X Rip Rap
XFill Area
n Drainage Channel Excavation
Slope Protection /Retaining Wall
❑ Parking Lot
Provide an attachment containing the name and 24 -hr. contact phone number
of supervisor(s) for every contractor working under this general permit.
3.All construction shall be in compliance with, but not limited to, the City of Coppell Subdivision
Ordinance, Standard Construction Details, Streetscape Plan and approved plans. The
contractors shall adhere to the City's Erosion Control & Sedimentation Ordinance.
4.Applicant shall provide a copy of approved plans, specifications and the related cost estimate or
contract for the purpose of permit fee calculation verification.
CONSTRUCTION DEVELOPMENT PERMIT APPLICATION
Page 2
5.A Construction Inspection Permit Fee shall be paid prior to beginning work, in accordance with
the City of Coppell Fee Ordinance. See Page 3 for calculation formula.
Amount Due $'2
Date Paid`
NOTE: A separate excavation permit is required anytime pavement is cut or when there is work in the
right -of -way not approved by the City Engineer.
➢Any work requiring closure of a lane of traffic, street, or alley must be approved in
advance by the Engineering Dept., with notification to the following prior to
closure:
Police Department @ 972 - 304 -3600 Street Department @ 972 -462 -5150
Fire Department @ 972 - 304 -3512 Engineering Dept. @ 972 -304 -3679
➢Attach barricade plan / trench safety plan of a lane or street closure. (Required)
➢It is a requirement of this permit that As -Built Drawings be turned in at the end of
this project. As- Builts consist of 1 set full size paper copy, 1 set full size mylar and a
CD with Autocad.dwg files.
NOTE. Street closures are allowed from 9.00 a.m. until 3:30 p.m. ONLY
unless otherwise approved by City Engineer.
➢A pre - construction meeting is required prior to beginning work related to this permit.
Contact the inspector assigned to your project to schedule the meeting.
Printing our name in 'c es your acceptance of the terms and conditions of this form:
S' lure of Applicane Contact Number
Signature of Inspector Contact Number
FOR CITY USE ONLY
Is the fill area located in an identified flood hazard area ?tYes C No
If YES, a Floodplain Development Permit is required before any construction can begin.
Is additional information required?
C7, Yes ()J�o
Are other federal, state, or local permits required? C Yes C
ERMIT APPLICATION APPROVED C` PERMIT APPLICATION DENIED
y 1 Date
Applicant shall indemnify and forever hold harmless against the City of Coppell each and every claim, demand
or cause of action that may be made or come against it by reason of or if any way arising out of the closure,
blocking, excavating, cutting, tunneling, or other work by the applicant under permit from the City, if such
permit is granted.
INSPECTION FEE CALCULATION SHEET
Project Name 1 �, ,,�, �' t , 1;4 __&E Date
Page 3
As per the City of Coppell Subdivision Regulations, the Developer shall pay 4% of the cost of the items to be permitted and inspected by
the Engineering Department and dedicated to the City. The Developer shall pay 2% of the items to be inspected by the Engineering
Department, but not dedicated to the City such as parking lots, private utilities, private drainage systems and so forth. Inspection fees are
due on or before the date of the Pre - construction Meeting.
In order to verify the inspection fee due, please provide a copy of the development contract(s) and this spreadsheet with
completed calculations to the Engineering Dept. The contract(s) should indicate the cost to construct the following
improvements:
Grand Total (total of 6 9
both colored fields) 4_3 6J7
PUBLIC IMPROVEMENTS
X4%--
PRIVATE IMPROVEMENTS
X2%=
CONTRACT AMOUNT
CONTRACT AMOUNT
Paving
`� 6��
j 70
Water
Sanitary Sewer
Storm Sewer
Alleys
Sidewalks
Other
1
/ f Z/�
/ 3
3/
Total
now
Grand Total (total of 6 9
both colored fields) 4_3 6J7
ref r.
Job Name Carter Addition Phase III
City Coppefl, Texas
Owner Papagolos Development
Date 7/10/2012
Notes "k
i. This Proposal' excludes the following: .. ..... ....
er.
- Testing 0 ...... . .... 01) '09 .. ........
- Staking �0%0 01
It"o, Goo,
- Payment and Performance Bonds
- Erosion Control Devices (other than those specifically quoted)
- Permits or Inspection Fee's
- Export of Onsite Cut
- Draining and mucking of existing pond (if required, add $15,000.00, material to be used onsite)
2. This Proposal is based on all onsite material excavated onsite being utilized onsite as fill.
Vilhauer Enterprises, LLC
Robert Hodges
Vice President
Office: 972.782.4443 • Fax: 214.390.3119 .6811 Ash Street, RO. Box 957, Frisco, Texas 75034
July 10, 2012
�9
CONSTRUCTION, 1.411
TO : Toll Dallas, TX LLC
2557 S.W. Grapevine Parkway
Suite 100
Grapevine, TX 76051
Project: Carter Addition, Ph. 3
Specs: Coppell, TX
E=ngineer. Dowdey Anderson & Assoc.
Scope: Installation of Water, Sanitary Sewer & Storm Drain
Proposal
290 S. Sixth Street
Mansfield, Texas 76063
(817)- 477 -1414
(8 17) - 473 -6077 fax
Line Item
Description
Unit
Quantity
Unit
I
Extended
'
6" Valve
4
Fire Hydrants
Price
Price
WATER
2,462.
1
8" Water Main
2"
8" Valve
'
6" Valve
4
Fire Hydrants
6
Fittings
x
1" Domestic Service
-r;
Thermoplastic, Fade Resistant Water Marker
.E
Dry Bore with Casing
"
6" x 8" Tee and 6" Valve on Existing 6" Water
.10
Testing
SEWER
2,462.
19.94
8" Sanitary Sewer Main
EA
4' Dia. Drop Manhole
'
4' Dia. Manholes
s.
Connect to Ex. Manhole with Drop Conn.
812.00
Concrete Encasement
_:-i
4" Services on New Main
-r;
4" Services on Existing Main
.E
Remove and Replace Asphalt Pavement
3,907.00
Traffic Control
.10
TV & Testing Main
1,183.00
Trench Safety
STORM DRAIN
1 30" RCP
2 24" RCP
21" RCP
4 18" RCP
5 10' Curb Inlets
6 4'x 4' Drop Inlet with Apron
7 30" RCP Type "CH -PW -O" Headwall on Piers
LF
2,462.
19.94
49,092.28
EA
9.
1,107.00
9,963.00
EA
4.
812.00
3,248.00
EA
4.
2,708.00
10,832.00
TON
1.3
3,907.00
5,079.10
EA
22,
1,183.00
26,026.00
EA
4.
50.00
200.00
LF
60.
300.00
18,000.00
EA
2.
4,277.00
8,554.00
LF
2,462.
0.75
1,846.50
SUB- TOTAL:
IWATER
$
132,840.88
LF
1,354.
24.25
32, 834.50
EA
1,
3,802.00
3,802.00
EA
4.
2,957.00
11,828.00
EA
2.
2,155.00
4,310.00
LF
20.
35.00
700.00
EA
19.
385.00
7,315.00
EA
3.
635.00
1,905.00
SF
450.
10.00
4,500.00
LS
1,
1,000.00
1,000.00
LF
1,354.
1.25
1,692.50
LF
1,354.
0.40
541.60
SUB- TOTAL:
ISEWER
$
10,428.60
LF
467.
53.04
24,769.68
LF
650.
42.41
27,566.50
LF
577.
38.98
22,491.46
LF
37.
34.86
1,289.82
EA
6.
2,650.00
15,900.00
EA
2.
3,250.00
6,500.00
EA
1.
12,100.00
12,100.00
24" RCP Type "CH-Pd-O" Headwall on Piers
Loose Rock Riprap,
10 Trench Safety
F,70917W" �r�
M32=1 0
EA 1. 11,900.66 11,900.66
SIF 456. 5.00 2,280.00
LF 11,731. 0.40 692.40
MOT 7,10,1
LS ll 4,850.00 4,850.00
WATER $ 132840.88
SEWER $ 70,i4i2,8.60
STORM DRAIN $ 126,490.52
MISCELLANEOUS is 4,860.011
$ 133±2,0J0
"114f, - 'r �A
TIME: 'J ) "'A 2, ,
20 Working days will be required for substantial completion. Substantial completion defined as all lines' 01
tested, backfilled, and awaiting paving stakes.
.. . . .. . . .. .
1 0 34,
. No
> These prices are firm for a period not to exceed 30 days, unless the project has been awarded 'i . . . . . ..............
contractor prior to 30 days after the proposal has been submitted in which case the prices can be
extended beyond 30 days as market conditions will allow.
> Utility Spoils to be left in stockpiles adjacent to the area from where it was displaced; hauling of
utility spoils is NOT included in the utility installation pricing.
> Geotechnical testing (density & concrete) is NOT included.
> It is assumed that water testing will be done by the tradition method by adding a valve to an existing
connection point and testing against that valve. No additional backflow preventors andlor bypasses are
included in the proposal.
> Sewer T.V, Testing does NOT include service, laterals or Retesting AFTER Franchise installation or at the
end of the maintenance period,
> T.V. Test of Storm Lines is NOT included.
> Vacuum cleaning of storm drain lines after paving (if required) is NOT included.
> Installation or removal of erosion control devices is NOT Included (other than stage 1 inlet protection).
> Final contract quantities to be determined using city approved construction plans.
> This proposal, including all qualifications, shall be included as part of the contract.
> Monthly pay estimates will be submitted by the 25th, of each month. Payment of monthly invoices are to be
received no later than, the 15th of the following month.
> Should payment be more than 30 days past due, owner shall pay fifteen (15) percent interest per annum, in
addition to the sum of thie past due invoice.
> If work is stopped by for issues that are beyond the contractors control for a period of more than 14 days, an
invoice for all money due including retainage will be sent and be due within 20 days of receipt.
ADMI-N—ISER—ATIVE •
• All inspection fees, permits, clearing / excavation, staking and w, w, testing (density & concrete) to be
ided by the developer.
provi
• Seeding, sodding or hydro mulching of disturbed areas shall, be provided • the developer as needed for city
acceptance.
• The owner / developer shall be considered the operator for the, purposes of the TCEQ Storm Water Pollution
Prevention'Plan.
rim.
Submitted to:
Submitted by:
Dowdy, Anderson, & Assoc & Paipago:los Development
Gilenn Midkiff
Attn: Casey Ross & John Papagolos
214-629-8035
Project:
Proposal Date:
7/13/2012
Carter Addition PH III (Paving)
Coppell, TX.
Plans Dated:
3/19/2012
CARTER ADDITION PH III
P1 6" REINF # 4@18 CONC PAVE (30'13-13)
5,745
Sly
34.25
196,766i.25i
P2 8" LIME SUBGRADE PREP (40#/SY)
6,065
SY
4.79
29,051.35
P3 LIME SU:BGRADE PREP (40#/SY)
122
TONS
152.00
$
18,544.00
P4 SMOOTH SAWCUT EX ASPHALT
78
LF
$ 4.50
$
351.00i
P5 WSIDEWALK
962
SF
$ 4.50
$
4,329.00
P6 BARRIER FREE RAMPS
4
EA
$ 1,300.00
$
5,200.0O
P7 TRAFFIC CONTROL ON CARTER
1
LS
$ 900.00
$
900.00
P8 MAINTENANCE BOND 2 YEAR
I
LS
$ 4,4OiO.00
$
4,400.00
TOTAL AMOUNT BID
S
—259;S41'-'f)0-"'
(See pages two for inclusion/exclusions)
<
VW ;tru,ctiontx.com
_W.gmconstructionix.com 0, 0"
214-629-8035 - gmidkiff@gmconstructiontx.com
-- r-*- AA,"'r 0A N700 -150 Corroilton TX 75006 ... ... ....
yoo
Page 1 of 1
hn Papagolos
From: gmidkifF @gmeonstructiontx.com
Sent: Thursday, August 23, 2012 9:37 PM
To: John Papagolos
Subject: Revised Proposal Carter Addition PH 3
John,
GM's revised proposal is $252,399.60 a reduction of ($7,42.00.)
We would appreciate the opportunity to build your project, so let me know if i need to
resubmit our revised proposal for contract preparation. Thanks
Sincerely,
Glenn Midkiff
2810 E. Trinity Mills Rd. #209 -159
Carrollton, TX 75006
(214) 629 -8035 Ph
(469) 737 -8567 Fax
8/24/2012
-- ---------- d
low GBAos., ifiC 250 GIBRALTAR ROAD to
HORSHAM, PA 19044
215-938-8000 Check No. - 9212544 Check Date - 09/11/12 Stub I of 1
00,
INVOICE NO
INVOICE DATE
COMMENT
GROSS
DEDUCTIONS
Amouw P—JaMN
120910/3124
091012
INSPECTION FEES
23,637.69
23,637.69
rn
*See Reverse Side For Easy Opening Instructions*
CASH 082553
i Date
RECEIPT
Received From
Address Rkn LIL A QV I 1
a. 75 r' Dollars
U
c° I~- V For ASS
O I =:�
t�3 0
CL a
Cox HOW PAID
Q ts 8 ACCOUNT
Ln
cli AMT OF OF CASH
T
ACCOUNT
A'. CHECK
AMT PAID
, C, MONEY ORDER 0 r
BALANCE
DUE
L DUE CREDITCARD❑ ;
Z
o Z
D �
m
's April 9� 2012
J. (" 'asey Ross, P111.
Dowdy, Anderson & Associates, Inc.
5225 Village Creek Dr. Suite 1-00
Plario,Tx 75093
I
RE: Carter Addition Phase III
Fee Assessment Letter
Dear Mr. Ross
Ticlosed is a copy of the City of Coppell, Development Fee Assessment table. along
with a copy of the
Development Fee calculations for the referenced development.
Please inake Payment Ilor the Impact Fees to the City of Coppell in the amount 0. fjQ.(tQ and forward to the
Engineering I)epartirient along with a copy of the Y cc Assessment table. This amount is a portion or the
assessed fees that need to be paid prior to filing of the final plat. please note that the Water and Seer
linpact Fees are due and payable at the issuance of Building Permit. Also,, please provicle a copy of the
I,-'rigincei's estirtiate or contract to our office so the 201/E & 411/b construction inspection fee call be %,crified,
`flic construction inspection fees must be paid prior to schedulinga pre-construction meeting.
The additional tees for water and sewer taps, water meters, and utility inspection fees need to be paid by
separate check. at the Public Works Service (enter, 816 S. Coppell Road. Meters will be ordered whe,"I
those fees are paid.
Appropriate payment of the required fees will help insure a successful beginning of this project. We look
L
forward to working with you on this project. If you have any (ILIC'StiOnS, please contact nie.
A refund for the roadway impact fee and the park fee in the amount ot'S1921.00 will be Issued for the
removal of one lot.
Sincerely.
i2nza., [11-
Graduate Fnoineer
z:1
cc: Jennifer Miller, Finance Director
Amy Swains, Administrative Technician, Building Inspections
Glenn Hollowell, Assistant Director of Public Works
Tim Oates, Deputy Chief /Prevention
Brad Reid, Director of Parks and Recreation
Michael Arellano, Chief Building Official
n PA P iti.VAY * P, 0, 2 G X -J r7 8 * C 0 PP L LL TX 7:5 ii 1 E L ca7 21,a 6 K. *, FA X 972,304 J 6, 79
DEVELOPMENT FEE TABLE
Project: Carter Addition Phase III
Date: 41512012
TOTAL
AMOUNT DUE
FEES DUE
PRIOR TO
FILING
PLAT
Water Impact Fee
$34,569.00
(100% due at Issuance of Building Permit
Water Tap Inspection Fee
$1,150.00
(100% due at Issuance of Water Meter)
Water Meter Fee (Domestic)
$2,390.85
(100% due at Issuance of Water Meter)
Water Meter Fee (Irrigation/Fireline)
$0.00
100% due at Issuance of Water Meter)
Water Meter Deposit (Domestic)
$690.00
100% due at Issuance of Water Meter)
Irrigation/Fireline Meter Deposit
$0.00
(100% due at Issuance of Water Meter)
Wastewater Impact Fee
$34,569.00
(100% due at Issuance of Building Permit)
Wastewater Tap Inspection Fee
$1,150.00
(100% due at Issuance of Building Permit)
Utility Final Inspection Fee
$1,150.00
(100% due at Issuance of Building Permit)
Park Fee
$0.00
$0.00
(100% due prior to Filing Plat)
Roadway Impact Fee
$0.00
$0.00
(100% due prior to Filing Plat)
Street Light Fee
Information not Available
(100% due prior to Acceptance of Project)
Street Sign Fee
Information not Available
(100% due prior to Acceptance of Project)
r onstruction Inspection Fee
Information not Available
100% due prior to Start of Construction)
TOTAL
$75,668.85
PLAT $0.00
TOTAL AMOUNT DUE PRIOR TO FILING FINAL
DEVELOPMENT FEE WORKSHEET
PROJECT: Carter Addition Phase III
DATE: 41512012
Water Impact Fee:
Domestic Meter(s)
Irrigation Meter(s):
Fireline Meter(s):
23 - 1 inch = 38.41 ESU's
0 = 0 ESU's
0
0
Total #: 38.41 ESU's @ $900.00 ea.
(Due prior to issuance of building permit)
Water Tap Inspection Fee:
0 ESU's
0 ESU's
$34,569.00
Total #: 23 Connections @ $50.00 ea. $1,150.00
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Domestic Water Meter Fee:
Total #: 23 Domestic Meter(s) @ $103.95 $2,390.85
(Single family due prior to issuance of building permit - *meter fee may change at the time of pick up)
(All other developments due prior to issuance of meter)
Irrigation /Fireline Water Meter Fee:
Total #: 0 Irrigation Meter(s) @ $0.00 $0.00
Total #: 0 Additional Irrigation Meter(s) @ $0.00 $0.00
Total #: 0 Fireline Meter(s) @ $0.00 meter provided by developer
(100% due prior to issuance of water meters)
Domestic Water Meter Deposit Fee:
Total #: 23 Meter(s) @ $30.00 ea.
(100% due prior to issuance of water meters)
Irrigation /Fire Meter Deposit Fee:
Total #: 0 Meter(s) @ $30.00 ea.
(100% due prior to issuance of water meters)
Wastewater Impact Fee:
Total Domestic Meters ESU's: 38.41 @ $900.00 ea.
(Due prior to issuance of building permit)
Wastewater Tap Inspection Fee:
Total #: 23 Connections @ $50.00 ea.
(100% due prior to issuance of building permit)
Utility Final Inspection Fee (All developments):
Total #: 23 Lots @ $50.00 ea.
(100% due prior to issuance of building permit)
Park Fee (For Residential Developments Only):
* Preliminary plat approved: After October 26, 1993
Park Development Zone:
23 Single- family @ $1,285.00 per lot
0 Multi- family @ $1,285.00 per unit
(100% paid prior to Council approval of final plat)
Page 1
$690.00
$0.00
$34,569.00
$1,150.00
$1,150.00
Zone 2
$0.00
$0.00
DEVELOPMENT FEE WORKSHEET
Roadway Impact Fee:
(See attached fee calculations)
Street Lighting Fees:
Assessed for lighting in the City's right -of -way.
This fee cannot be assessed until after Oncor submits
the lighting plan for the proposed development.
Once the plans are submitted, $352.44 per light will be assessed.
(100% due prior to final acceptance of development)
Street Sign Fees:
Assessed for signage in the City's right -of -way.
(See attached fee calculations if applicable)
Construction Inspection Fees:
A copy of the development contract must be submitted for assessment.
The contracts should indicate the cost to construct the improvements
that are inspected by the Engineering Department.
(2% of development cost required for private improvements)
(4% of development cost required for public improvements)
Page 2
$0.00
Information not Available
Information not Available
Information not Available
ROADWAY IMPACT FEE CALCULATIONS
PROJECT: Carter Addition Phase III
DATE: 41512012
ROADWAY IMPACT FEE:
Service Area *
1
Category **
Residential
Land Use **
Residential Medium/Low
No. Lots/Units
23
Develo ment Units **
23.00
Vehicle Miles per Development Unit **
4.24
Fee per Vehicle Mile * **
$150
Roadway impact Fee due = (Development Units) x
Vehicle Miles per Development Unit x Fee per Vehicle Mile) $14,628.00
* (Figure 4.1 - Roadway Impact Fee Study)
** (Table 4.10 - Roadway Impact Fee Study)
* ** (Schedule 2, Page 3 - The Master Fee Schedule)
Percent of Credit Toward Roadway Impact Fees 100%
Total Credit $14,628.00
100% credit for impact fee already paid with original development on 12/16/2011 for $15,264.00
A refund of $636.00 will be submitted
There is also a credit of 30,840.00 for park fees paid on 12/16/2011
A refund of $1285.00 will be submitted.
DJECT NAME:
SINEER:
IGINATION DATE:
SENT
DEVELOPMENT FEES
Carter Addition, Phase 3
Dowdey, Anderson
ASSESSMENT
ASSESSED FEE
AMOUNT P- rJF
DATE
Water Impact Fee
$36,072.00
Paving Bond Recd.
Wastewater Impact Fee
$36,072.00
Erosion Control Maint.
Park Fee
$30,840.00
30,840.00 Ih
12/16/2011
Roadway Impact -Zone
$15,264.00
15,264.00 Ih
12/16/2011
Street Sign
$1,42 . 6
Street Light
$ 463.00
Construction Inspection
EG or Bore Permit
Pond filling only
$408.95
408.95 ra
1/26/2012
Overtime Inspection
Water Tap Inspectio
$1,200.00
Wastewater Tap I pection
$1,200.00
Water Meter (D estic)
$2,873.52
Water Meter ( re /Irrig)
$0.00
Meter Depo (Domestic)
$720.00
Meter De p sit (Fire /Irrig)
$0.00
Utility Fi I Inspection
$1,200.00
Sub al to En g.
$49,404.51
46,512.95
$2,891.56
Total Fees
Fees Paid
Amount Owed
TALS
$128,742.03
46,512.95
$82,229.08
Prior To Construction
Erosion Control Approved
E.P.A.- N.O.I. Recd.
Const. Plan Approved
Flood Study fees:
NOTES
Date Received
Prior To Final Acceptance
As Built Plan Recd.
Paving Bond Recd.
Utilities Bond Recd.
Erosion Control Maint.
FEMA
2,500.00 3/3/2011
Review
1,000.00 3/3/2011
DATE INVOICE NO
1 -25 -12 012512
__ DESCRIP1lON _ INVOICE AMOI
i1- election Fees 408.
DE . _-10_ 1'J r . .v
D UCT _.._—
408.95
CHECK CHECK
DATE 1-5-12 5- 12 NUMBER 1L-/92 TOTALS 408 . 9 5 1 408.913
FC S
P.O. BOX 1 90829 • DALLAS, TX 75219 -0829
AMERICAN BANK OF TEXAS 88-164
FRISCO. TX 1119
J.
Pay: ** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** *Four hundred eight dollars and 95 cents
DATE CHECK NO. AMOUNT
January 25, 2012 11792 $ * * * * * ** *408.95
IOAY
TH City of Coppell
ORDER
OF
On
� Vr�
r,
as�61
O a, $ F «1-14& of PoN —DS_ OA
CO r-
17.q2- Ac2jU
r- b/
i
i
t
0
T H E- C I T Y - O F
COPPELL
EARLY GRADING / EXCAVATION PERMIT
IN
RIGHT -OF -WAY / EASEMENT / PRIVATE PROPERTY
Date:
❑ Grading plans provided and approved.
(Erosion Control must be installed prior to beginning work.)
❑ Tree Removal Permit from Parks & Recreation Dept. required.
❑ Hold Harmless Letter from the Property Owner /Engineer /Developer is attached.
Project Name /Location:
General Contractor:
Permit issued to Company /Representative: .a
Address: 41,11W 14a,
ITelephone#: IVY— = G' �' Emergency Telephone #:
General �Description rof work (provide copy of approved plans): r
C-f' �t-o?pr�n u -�_ �s':, +.��n�ti✓ic_ '12"e"d null:
�3ZZ
➢ Was contact made with City and /or Utility Companies to locate existing utilities?
if NO, Reason:
YES ❑ NO
➢ Was contact made with Parks & Recreation Dept. concerning Tree Removal Permit?
a ;lyre -W/ 09 /W
if NO, Reason: le, 4, ✓� �. AYES NO
➢ Is removal of existing street, alleys, or sidewalks necessary? ❑ YES NO
if YES, Attach Bore /Street Cut /Saw Cut Permit
➢ Is Floodplain Permit required? ❑ YES NO
if YES, Permit # or date of City Council variance
//J r; !I 1 -"
rA
Early Grading / Excavation Permit Page 2
Representative(s) of the Contractor must adhere to all construction standards approved by the
City of Coppell, which includes but is not limited to: Erosion Control Ordinance, compaction
requirements (density tests will be required at the applicant's expense), Tree Ordinance and
barricading according to the Texas Manual on Uniform Traffic Control Devices. Area(s)
affected must be restored to as good condition as before the commencement of work
(grading, drainage, vegetation, and erosion control).
➢ Any work requiring closing of a lane of traffic, street, or alley must be approved
by the Engineering Dept. with notification to the following prior to closing:
Police Department Q 972 - 304 -3600
Fire Department @ 972 - 304 -3500
Street Department (& 972 -462 -5150
Engineering Department @ 972 - 304 -3679
➢ Attach barricade plan / trench safety plan of a lane or street closure is required.
Note: Street closures are allowed from 9.00 a.m. until 4.00 p.m. ONLY unless
otherwise approved by City Engineer.
➢ A 2% inspection fee for grading is required prior to beginning work.
(Attach copy of excavation contract for verification)
Amount Paid $ Date Paid
❖ City inspector must be notified 24 hours prior to beginning work related to this
permit.
"I I �
Signatu a of pplicant/Contractor Rep.
-- ignatuf e PP4n't gineer-
A/,
City Inspector for this project
Printed Name
Prifited Name
ZG 1 14
D to
1 2 6 t 2--
Date
i2-3 -i�5Y
Contact umbers)
Applicant shall indemnify and forever hold harmless against the City of Coppell each and
every claim, demand or cause of action that may be made or come against it by reason of or
if any way arising out of the closure, blocking, excavating, cutting, tunneling, or other work'
by the applicant under permit from the City, if such permit is granted.
PROPOSAL
Project: Carter Addition Ph 3
Location: Coppell, TX
Date: January 4, 2012
Attn: John Papagolos
F'CS
Page 1 of 1
FCS Construction, LLC.
Trevor Francis
Estimator
Bid Total: $20,447.70
/- 'y- /,7-
6991 MAIN STREET - FRISCO, TX 75034 - 0 214.975.0808 - F 214.975.0811
Medic ' . foci
��Y
tJctit;Fticia::
17t?�Esiuir .
1
JProcess Material Imported From Offsite
1 7,4901 CY
1 $2.731
$20,447.70
FCS Construction, LLC.
Trevor Francis
Estimator
Bid Total: $20,447.70
/- 'y- /,7-
6991 MAIN STREET - FRISCO, TX 75034 - 0 214.975.0808 - F 214.975.0811
Toll Bros. Inc 250 GIBRALTAR ROAD
f HORSHAM PA 19044
�
_isto�a -annn Check No. - 9148193 Check Date - 12/14/11 Stub 1 of 1
INVOICE NO
INVOICE DATE
COMMENT
DROSS
DEDUCTIONS
AMOUNT PAID
111213/3124
121311
ROADWAY IMPACT AND PARK FEES
46,104.00
46,104.00
`loll `Bros., Inc CHECK NO. 09148193 -
250 Gibraltar Road VENDOR NO. CHECK DATE •
Horsham, PA 19044
(215) 938 -8000 254816 12/14/11 $ * ** *46,104.00
** INVALID SIX MONTHS AFTER DATE ISSUED **
PAY
FORTY SIX THOUSAND ONE HUNDRED FOUR AND 00/100
TO THE City Of Ceppell
Planning Dept
ORDER OF:
255 Parkway Blvd PO Box 9478
CoppellTX750199478 Wwhola Ba*ofDelaware,NationalAsaodaGon
Wilmington, DE 19803
`Toll `Bros., Inc
e„
May 31, 2011
J. Casey Ross, P.E.
Dowdey, Anderson & Associates, Inc.
5225 Village Creek Drive, Suite 200
Plano, Texas 75093
Re: Carter Addition Phase III
Street Light Fee Assessment
The following assessment represents the number of light units as established by Oncor Electric
Delivery Company for Carter Addition Phase III Subdivision:
5 lights @ $292.60 per light = $1,463.00
Prior to the final acceptance of this project, a check in the amount of $2,926.00 should be made
payable to the City of Coppell and forwarded to the Engineering Department.
If you have any questions, or need any additional information or clarification, please feel free to
contact me at your convenience.
Sincerely,
Michael Garza, E.I.T
Graduate Engineer
Office Phone: (972) 304 -7019
Fax: (972) 304 -3570
E -mail: mgarza @coppelltx.gov
May 31, 2011
J. Casey Ross, P.E.
Dowdy, Anderson & Associates, Inc
5225 Village Creek Dr. Suite 200
Plano, TX 75093
Re: Carter Addition Phase III
Street Sign Fee Assessment
Dear Casey Ross:
Enclosed with this letter is the street sign assessment for Carter Addition Phase III. Prior
to final acceptance of this project, a check in the amount of $1,428.56 should be made
payable to the City of Coppell and forwarded to the Engineering Department, along with
a copy of this street sign fee assessment letter. The Engineering Department will process
the payment and notify the Finance Director to ensure successful completion of this
project.
If you have any questions, please contact me at your convenience.
Sincerely,
Michael Garza, E.LT
Graduate Engineer
Office Phone: (972) 304 -37019
Fax: (972) 304 -3570
DEVELOPMENT FEE TABLE
Project: Carter Addition Phase III
Date: 512012011
TOTAL
AMOUNT DUE
FEES DUE
PRIOR TO
FILING
PLAT
Water Impact Fee
$36,072.00
(100% due at Issuance of Building Permit)
Water Tap Inspection Fee
$1,200.00
(100% due at Issuance of Water Meter)
Water Meter Fee (Domestic)
$2,873.52
(100% due at Issuance of Water Meter)
Water Meter Fee (Irrigation /Fireline)
$0.00
(100% due at Issuance of Water Meter)
Water Meter Deposit (Domestic)
$720.00
(100% due at Issuance of Water Meter)
Irrigation /Fireline Meter Deposit
$0.00
(100% due at Issuance of Water Meter)
Wastewater Impact Fee
$36,072.00
(100% due at Issuance of Building Permit)
Wastewater Tap Inspection Fee
$1,200.00
(100% due at Issuance of Building Permit)
Utility Final Inspection Fee
$1,200.00
(100% due at Issuance of Building Permit)
Park Fee
$30,840.00
$30,840.00
(100% due prior to Filing Plat)
Roadway Impact Fee
$15,264.00
$15,264.00
(100% due prior to Filing Plat)
Street Light Fee
$1,463.00
(100% due prior to Acceptance of Project)
Street Sign Fee
Information not Available
(100% due prior to Acceptance of Project)
Construction Inspection Fee
Information not Available
(100% due prior to Start of Construction)
TOTAL
$126,904.52
$46,104.00
TOTAL AMOUNT DUE PRIOR TO FILING FINAL PLAT
DtVELOPMENT FEE WORKSHEET
PROJECT: Carter Addition Phase III
DATE: 512012011
Water Impact Fee:
Domestic Meter(s): 24 - 1 inch = 40.08 ESU's
Irrigation Meter(s): 0 = 0 ESU's
0 = 0 ESU's
Fireline Meter(s): 0 = 0 ESU's
Total #: 40.08 ESU's @ $900.00 ea.
(Due prior to issuance of building permit)
Water Tap Inspection Fee:
Total #: 24 Connections @ $50.00 ea.
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Domestic Water Meter Fee:
Total #: 24 Domestic Meter(s) @ $119.73
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
$36,072.00
$1,200.00
$2,873.52
Irrigation /Fireline Water Meter Fee:
Total #: 0 Irrigation Meter(s) @ $0.00 $0.00
Total #: 0 Additional Irrigation Meter(s) @ $0.00 $0.00
Total #: 0 Fireline Meter(s) @ $0.00 meter provided by developer
(100% due prior to issuance of water meters)
Domestic Water Meter Deposit Fee:
Total #: 24 Meter(s) @ $30.00 ea.
(100% due prior to issuance of water meters)
Irrigation /Fire Meter Deposit Fee:
Total #: 0 Meter(s) @ $30.00 ea.
(100% due prior to issuance of water meters)
Wastewater Impact Fee:
Total Domestic Meters ESU's: 40.08
(Due prior to issuance of building permit)
@ $900.00 ea.
Wastewater Tap Inspection Fee:
Total #: 24 Connections @ $50.00 ea.
(100% due prior to issuance of building permit)
Utility Final Inspection Fee (All developments):
Total #: 24 Lots @ $50.00 ea.
(100% due prior to issuance of building permit)
Page 1
$720.00
$0.00
$36,072.00
$1,200.00
$1,200.00
DtVELOPMENT FEE WORKSHEET
Park Fee (For Residential Developments Only):
* Preliminary plat approved: After October 26, 1993
Park Development Zone:
24 Single- family @ $1,285.00 per lot
0 Multi- family @ $1,285.00 per unit
(100% paid prior to Council approval of final plat)
Roadway Impact Fee:
(See attached fee calculations)
Street Lighting Fees:
Assessed for lighting in the City's right -of -way.
This fee cannot be assessed until after T.U. Electric submits
the lighting plan for the proposed development.
Once the plans are submitted, $292.60 per light will be assessed.
(100% due prior to final acceptance of development)
Street Sign Fees:
Assessed for signage in the City's right -of -way.
(See attached fee calculations if applicable)
Construction Inspection Fees:
A copy of the development contract must be submitted for assessment.
The contracts should indicate the cost to construct the improvements
that are inspected by the Engineering Department.
(2% of development cost required for private improvements)
(4% of development cost required for public improvements)
Page 2
Zone 2
$30,840.00
$0.00
$15,264.00
$1,463.00
Information not Available
Information not Available
ROA1u WAY IMPACT FEE CALCULATIONS
PROJECT: Carter Addition Phase III
DATE: 512012011
ROADWAY IMPACT FEE:
Service Area *
1
Category **
Residential
Land Use **
Residential (Medium /Low)
No. Lots /Units
24
Development Units **
24.00
Vehicle Miles per Development Unit **
4.24
Fee per Vehicle Mile * **
$150
r adway Impact Fee due = (Development Units) x
hicle Miles per Development Unit) x (Fee per Vehicle Mile) _ $15,264.00
* (Figure 4.1 - Roadway Impact Fee Study)
** (Table 4.10 - Roadway Impact Fee Study)
* ** (Schedule 2, Page 3 - The Master Fee Schedule)
FAA\:7& WDEY, ANDER, A
ASSOCIATES, INC.
CIVIL ENGINEERS
5225 Map Creek Drive, We 200
Noo, Taus 15093
Phone 912. 9314694 Fix 972. 931.9538
To: George Marshall, P.E.
TRANSMIUAL
From: /.Casey Ross, P.E.
Co:
City of Coppell
Date:
March 3, 2011
Address:
255 Parkway Boulevard
Coppell, TX 75019
CC:
File
Phone:
972 - 3043679
Via:
Hand Delivery
Re:
Carter Addition Phase III
CLOMR Fee
job #:
07111 C
Please find attached the following checks for processing the CLOMR request:
Check No. 9067260 ($2500)
Check No. Y010141 ($1000)
The CLOMR flood study was submitted to you on January 19, 2011. Please let me know if you need anything further
to process the CLOMR request.
Thank you,
Casey Ross, P.E.
Received by: _
Date received:
R:\Data\2007\07111 \00 \Correspondence\Transmittals \07111 C- Trans - Coppell- 2011 -03- 03- CLOMR.docx
F X�
m
u
1�
r '
a �
m
U
CASW
`. Date �= 082 "0
Received From 7 _
Address ��� ► f� (t t yt p :§ �1 4
Q• Dollars $
t-1 For
ACCOUNT HOW PAID
U
AMT: OF CASH
.ACCOUNT -
AM? PAID.'gA" CHECK
BALANCE ONEY ORDER BY
DU CREDIT CARD
CASH
Date
RECEIPT
FAddrm m
` {
AS
n Dollars $
t» ,'
ACCOUNT HOW PAID
L: AMT: 0'
CASw
ACCOUNT
CHECK" s
AMT PAID `11 % t
BALANCE MONEY ORDER B
DUE OREDITCARD
t
I
I I-0