Loading...
Cambridge Phase 1-LR 940606E GEE Consultants, Inc. 2540 Glenda Lane · Suite 108 · Dallas, Texas 75229 · (214) 620-9791 * Fax (214) 620-9794 MOISTURE DENSITY RELATIONSHIP REPORT Test Report Date:June 6, 1994 Project No: B-94-0178 Client: Beamer Development Sample Date: May 31, 1994 Project: Estates of Cambridge Manor, Phase I Identification: Moisture Density Relationship Test Procedure: ASTM D698 Test Results: Method ......................................... A Optimum Moisture Content ............................. 21.1 percent Maximum Density .................................. 94.6 pounds per cubic foot Rammer Type ..................................... Manual Material Description ................................. Dark Gray Silty Clay Material Origin .................................... On-site Subgrade Moisture Preparation Procedure .......................... Air D~ Liquid Limit ...................................... 50 Plastic Limit ...................................... 18 Plasticity Index .................................... 32 Percent Passing a No. 200 U.S. Sieve ...................... 97 Technician: K.Mc./L.G. cc: Mr. Bill Anderson - Dowdy, Anderson and Associates, Inc. Mr. Larry Davis - City of Coppell Our lelters and repof~s are for thc exclusive use of thc clle~t to whom they ar~ nddressed. Thc use of our name must receive our prior wrilten approval. Our letters and reports apply only. to thc sample tesled and/or inspe~-'ted, and are no~ ne~e~sal~.' indicative of the quantities of apparently identical or similar products.