Coppell Industrial Addn (Tradepoint 2)DEVELOPMENT FEES
PROJECT NAME: Tradepoint II (Coppell Ind. Addn, Lot 2 Block A )
ENGINEER:Halff Assoc.
ORIGINATION DATE:11/30/2012Revised 7/26/13
SENTASSESSMENTASSESSED FEEAMOUNT PD DATE
Water Impact Fee$10,503.00
Wastewater Impact Fee$10,503.00
Roadway Impact-Zone$259,152.00$259,152.00lh1/30/2013
Street Sign
Street Light
Construction Inspection$115,268.00$115,268.00ra12/14/2012
Spine RoadConstruction Inspection$6,795.20$6,795.20ra10/8/2012
UG detentionConstruction Insp (grading)$8,656.00$8,656.00ra10/8/2012
UG detentionConstruction Inspection$19,484.00$19,484.00ra11/1/2012
Overtime Inspection
Water Tap Inspection$50.00
Wastewater Tap Inspection$50.00
Water Meter (Domestic)$1,787.80
Water Meter (Fire/Irrig)$0.00
Meter Deposit (Domestic)$30.00
Meter Deposit (Fire/Irrig)$0.00
Utility Final Inspection$50.00
Subtotal to Eng.$409,355.20$409,355.20$0.00
Fees PaidAmount Owed
TOTALS
$432,329.00$409,355.20$22,973.80
NOTES
Prior To ConstructionDate ReceivedPrior To Final Acceptance
Erosion Control ApprovedAs Built Plan Recd.
E.P.A.-N.O.I. Recd.Paving Bond Recd.
Const. Plan ApprovedUtilities Bond Recd.
Erosion Control Maint.