Loading...
Coppell Industrial Addn (Tradepoint 2)DEVELOPMENT FEES PROJECT NAME: Tradepoint II (Coppell Ind. Addn, Lot 2 Block A ) ENGINEER:Halff Assoc. ORIGINATION DATE:11/30/2012Revised 7/26/13 SENTASSESSMENTASSESSED FEEAMOUNT PD DATE Water Impact Fee$10,503.00 Wastewater Impact Fee$10,503.00 Roadway Impact-Zone$259,152.00$259,152.00lh1/30/2013 Street Sign Street Light Construction Inspection$115,268.00$115,268.00ra12/14/2012 Spine RoadConstruction Inspection$6,795.20$6,795.20ra10/8/2012 UG detentionConstruction Insp (grading)$8,656.00$8,656.00ra10/8/2012 UG detentionConstruction Inspection$19,484.00$19,484.00ra11/1/2012 Overtime Inspection Water Tap Inspection$50.00 Wastewater Tap Inspection$50.00 Water Meter (Domestic)$1,787.80 Water Meter (Fire/Irrig)$0.00 Meter Deposit (Domestic)$30.00 Meter Deposit (Fire/Irrig)$0.00 Utility Final Inspection$50.00 Subtotal to Eng.$409,355.20$409,355.20$0.00 Fees PaidAmount Owed TOTALS $432,329.00$409,355.20$22,973.80 NOTES Prior To ConstructionDate ReceivedPrior To Final Acceptance Erosion Control ApprovedAs Built Plan Recd. E.P.A.-N.O.I. Recd.Paving Bond Recd. Const. Plan ApprovedUtilities Bond Recd. Erosion Control Maint.