Loading...
Rosebriar-CS130306 (2)Mike: I gave one set of as-builts to Larry at the walk-through for him to review. I have not been notified that he has completed the review of these plans, so I have not prepared the remaining required sets. I will forward to you as soon as he releases us. Description: PLS_Logo_66 emlsig Marc P. Paquette, P.E. | 817-562-3350(o) | 817-995-8587(c)| 5751 Kroger Dr., Ste. 185, Keller, TX 76244 marc.paquette@pelotonland.com From: Michael Garza [mailto:MGarza@coppelltx.gov] Sent: Wednesday, March 06, 2013 9:06 AM To: Kenny Hafner Cc: Brad Meyer; Rhonda Adloo; Marc Paquette Subject: RE: Rosebriar Kenny, We have not received the maintenance bonds or the erosion control bond. We are also lacking the final as-builts. We still have concerns with the drainage from the adjacent properties along the west property line being blocked. The first heavy rain we get they will have standing water in their back yards and we will get phone calls. I understand Larry has discussed this issue with you. As soon as we get these items we will be able to issue the final acceptance letter. Thanks, Michael Garza, P.E. Civil Engineer City of Coppell 972-304-7019 From: Kenny Hafner [mailto:kennyhafner@yahoo.com] Sent: Tuesday, March 05, 2013 4:28 PM To: Michael Garza Cc: Brad Meyer Subject: Rosebriar We did the final walk Friday and punchlist items completed yesterday. Can you give us an idea on when to expect an acceptance letter? Thanks, Kenny Hafner Cilken Real Estate Management, LLC 1318 Danbury Drive Mansfield, Texas 76063 Office: 817/477-0110 Fax: 817/477-0220 Cell: 214/202-7818 E-mail: kennyhafner@yahoo.com