Rosebriar-CS130306 (4)Mike
I talked to Kenny this morning and we are looking at a way to open up
those areas so we make sure we don't block any drainage. I think we
would be best off just fixing it so it won't be a problem for anyone in
the future.
Thanks, Brad
Brad Meyer
Principal
Contrast Development, LLC
300 East John Carpenter Fwy
Suite 940
Irving , TX 76062
817.312.0417
On Mar 6, 2013, at 11:31 AM, Michael Garza <MGarza@coppelltx.gov> wrote:
We are in the process of moving and I did receive confirmation
that it was dropped off so it is probably somewhere in one of our boxes.
Can we get a letter from Kenny or whomever regarding the drainage issue,
stating that you are aware that in the event of a complaint regarding
standing/blocking water from the adjacent properties you will address
this issue in a timely fashion. As soon as we get the as-builts and this
letter we will issue the final acceptance.
Thanks,
Michael Garza, P.E.
Civil Engineer
City of Coppell
972-304-7019
From: Brad Meyer [mailto:brad.meyer@contrastdevelopment.com]
Sent: Wednesday, March 06, 2013 11:15 AM
To: Michael Garza
Cc: Kenny Hafner; Rhonda Adloo; Marc Paquette
Subject: Re: Rosebriar
Mike
I dropped off the maintenance bond and check last Thursday. I
gave it to the lady that sits outside of Ken's office.
Thanks, Brad
Brad Meyer
Principal
Contrast Development, LLC
300 East John Carpenter Fwy
Suite 940
Irving , TX 76062
817.312.0417
On Mar 6, 2013, at 9:05 AM, Michael Garza <MGarza@coppelltx.gov>
wrote:
Kenny,
We have not received the maintenance bonds or the
erosion control bond. We are also lacking the final as-builts. We still
have concerns with the drainage from the adjacent properties along the
west property line being blocked. The first heavy rain we get they will
have standing water in their back yards and we will get phone calls. I
understand Larry has discussed this issue with you. As soon as we get
these items we will be able to issue the final acceptance letter.
Thanks,
Michael Garza, P.E.
Civil Engineer
City of Coppell
972-304-7019
From: Kenny Hafner [mailto:kennyhafner@yahoo.com]
Sent: Tuesday, March 05, 2013 4:28 PM
To: Michael Garza
Cc: Brad Meyer
Subject: Rosebriar
We did the final walk Friday and punchlist items
completed yesterday. Can you give us an idea on when to expect an
acceptance letter?
Thanks,
Kenny Hafner
Cilken Real Estate Management, LLC
1318 Danbury Drive
Mansfield, Texas 76063
Office: 817/477-0110
Fax: 817/477-0220
Cell: 214/202-7818
E-mail: kennyhafner@yahoo.com