Loading...
Cambridge Phase 1-CS 950125 (2) DEVELOPMENT, INC. January 25, 1995 Mr. Atul Patel ENGINEERING DEPARTMENT City of Coppell P.O. Box 478 Coppell, Texas 75019 Dear Atul: Reference our recent meetings and phone conversations on January 19th and January 25th, 1995, regarding proper guide- lines pertaining to retaining walls in The Estates of Cambridge Manor. Consequently, Beamer Development, Inc., will implement the following procedures when addressing the construction of retaining walls in The Estates of Cambridge Manor: 1. Ail retaining walls in The Estates of Cambridge Manor will be contiguous to prevent slope failure and to protect the integrity of the soil. If a retaining wall is built adjacent and/or adjoining to an empty lot, Beamer Development will install temporary silt fencing or other types of retainage to prevent erosion and to insure proper drainage. 2. Any and all retaining walls that are under four (4') feet in height will not require approval from the City of Coppell Engineering Department and will be granted building permits. But prior to the "final" from the City of Coppell Building Inspection Depart- ment, the retaining walls must be in place. Atul, in closing, a copy of this letter will also be sent to the following custom home builders in The Estates of Cambridge Manor: - BRENTWOOD BUILDERS, INC. - CUSTOM ONE/HAAG & COMPANY, INC. - THE WATSON GROUP CUSTOM HOMES - DICK WALKER CUSTOM HOMES POST OFFICE BOX 2312 · COPPELL, TEXAS 75019 Atul Patel January 25, 1995 RETAINING WALLS - Page Two - If you have any questions or inquiries regarding any item or items in this letter, please feel free to call either MARK WAINSCOTT @ 214/ 447-9119 or myself @ 214/ 908-1068. Sincerely, cc: Brentwood Builders, Inc. Custom One/Haag & Co. The Watson Group Dick Walker Custom Homes O.W. McDonald Dowdey, Anderson Engineering