Northlake-Cypress WatersDEVELOPMENT FEES
PROJECT NAME: Cypress Waters, Ph. 1
ENGINEER:Kimley-Horn
ORIGINATION DATE:12/22/2011
SENTASSESSMENTASSESSED FEEAMOUNT PAID DATE
Water Impact FeeN/A
Wastewater Impact FeeN/A
Park FeeN/A
Roadway Impact-ZoneN/A
Street Sign
Street Light
4%Const Insp Water/Sewer$4,642.56$4,642.56ra12/22/2011
4%Const Insp Traffic Signal$10,917.76$10,917.76RA1/18/2012
2% & 4%Temp. Traffic Signal$640.00$640.00ra1/25/2013
4%Dividend Dr East extension$212.08$212.08ra8/23/2013
Water Tap Inspection$0.00
Wastewater Tap Inspection$0.00
Water Meter (Domestic)$0.00
Water Meter (Fire/Irrig)$0.00
Meter Deposit (Domestic)$0.00
Meter Deposit (Fire/Irrig)$0.00
Utility Final Inspection$0.00
Subtotal to Eng.$16,412.40$16,412.40$0.00
Total FeesFees PaidAmount Owed
TOTALS
$16,412.40$16,412.40$0.00
NOTES
Prior To ConstructionDate ReceivedPrior To Final Acceptance
Erosion Control ApprovedAs Built Plan Recd.
E.P.A.-N.O.I. Recd.Paving Bond Recd.
Const. Plan ApprovedUtilities Bond Recd.
Erosion Control Maint.
Billingsley Property Services, Inc. Texas Capital Bank, N.A.
6800 Windhaven Pkwy McKinney Avenue Banking Center
Suite 133 2100 McKinney Avenue,Suite 10
The Colony,TX 75056 Dallas,TX 75201 , 08/21/2013
111017979
**** TWO HUNDRED TWELVE AND 08/100 DOLLARS
TO THE
ORDER OF $212.08***** •
City of Coppell /.,,t r,.1 ,v-v, cr
Void after 180 days from issue
DATE:08/21/2013 CK#:721 TOTAL:$212.08***** BANK:BPS TxCap Single Fund Acct(3bpspool)
PAYEE:City of Coppell(citcop)
Job(Prop) Categ(Acct) Invoice-Date Description Amount
cwoff#4(404) 8/21/13-08/21/2013 Eng.Inspection fees 212.08
212.08
r
7
P
CASH J123,J/ 096713
RECEIPT ' Date
RN 'L } F r 1G Received From / —L y L`
a 4 Address ii
/I/, 2 , c�
Cn i : X12 ser
m° °o � - >rrt S j._s Dollars$'
OYHN For 16/ tellA; 6 �S??� , .
R Q
rn
�a U o ,
6 N ACCOUNT HOW PAID
AMT OF CASH
m ACCOUNT /
'\ \\ O AMT.PAID W 212 tl,.0 �� CHECK '�L/. _ ?
• BAL'ANCE '�� MONkY➢RDEfL� - By
\ - DUIi i'. 'CREDIT CARDt� . ...-: .. +..'. ..; ., .i.. .. ..�•