Encore of Coppell feesDEVELOPMENT FEES
PROJECT NAME: Encore of Coppell (formerly Petterson Addn)
ENGINEER:Hamilton/Duffy
ORIGINATION DATE:2/28/2007revised 12/2/13
SENTASSESSMENTASSESSED FEEAMOUNT PD DATE
Water Impact Fee$12,024.00$900.006/3/1999
Wastewater Impact Fee$10,521.00$900.006/3/1999
Park Fee$8,995.00$3,855.006/3/1999
$1,285.00ra3/2/2007
$3,855.00ra12/3/2013
Roadway Impact-Zone$4,452.00$1,710.006/3/1999
$198.00ra3/2/2007
$636.00cd1/29/2009
$1,908.00ra12/3/2013
Street Light
Street Sign
Construction InspectionTBD
EG or Bore Permit
Overtime Inspection
Water Tap Inspection$400.00
Wastewater Tap Inspection$350.00
Water Meter (Domestic)$2,094.75
Water Meter (Fire/Irrig)$299.25
Meter Deposit (Domestic)$210.00
Meter Deposit (Fire/Irrig)$30.00
Utility Final Inspection$350.00
Subtotal to Eng.$13,447.00$13,447.00$0.00
Total FeesFees PaidAmount Owed
TOTALS$39,726.00$15,247.00$24,479.00
NOTES
Prior To ConstructionDate ReceivedPrior To Final Acceptance
Erosion Control ApprovedAs Built Plan Recd.
E.P.A.-N.O.I. Recd.Paving Bond Recd.
Const. Plan ApprovedUtilities Bond Recd.
Erosion Control Maint.
l
1
I CASH ��� ,,--� ; '� 096731
li RECEIPT Date _ -_-_ ,�!-±!- _
Received From 1 - ' .Z._. , ,`.,, 1-. ��... ;' 6 G t'3 ? • tic 5-rift 5-rift i A
Address EN ,b k . 0 .. _'.O PPS L L A
1 r
V � Dollars
$ 5,7 ` `
For T— ws' r� - fir r
ACCOUNT HOW PAID
AMT.
ACCOUNT
. , f
Ki
AM PAID e 7 j mm , �- R r' r ,� :r
f
°14`7---"
BALANCE MONEY ORDER i
DUE CREDIT GARDE]
J
iii .1'n,t ■474,.. IN,,4.-, NTTy,,,r, ti, ✓ T.' , y, r 1 r 1 W..,, •F4„ 'yg,Y:..:,,.1-1. u� ,k, ..:..0),. , s∎., ii I N`,N,
THIS DOCUMENT HAS AN ARTIFICIAL WATERMARK PRINTED ON THE BACK.THE FRONT OF THE DOCUME.. 4 - F ,ioS A MINT SIGNATURE LINE.ABSENCE OF THESE FEATURES WILL INDICATE A COPY,
( P A . Y`411)_l1 i '' 10002146 78
`er ViewPoint Bank,N.A. 64.305
611
r PO Box 869105•Plano,TX 75086-9105
K--;- o 972-578-5000•viewpointbank.com
Five Thousand Seven Hundred Sixty Three Dollars and No Cents
DATE 12/3/2013 C
r PAY TO THE CITY OF COPPELL
tb
$5,763.00 %
\,
DEVELOPMENT FEE TABLE
Project:Petterson Add. (Encore of Coppell)
Date:
12/2/2013
TOTALAMOUNT DUE
FEES DUEPRIOR TO
FILING
PLAT
Water Impact Fee$12,024.00
(100% due at Issuance of Building Permit)
Water Tap Inspection Fee$400.00
(100% due at Issuance of Water Meter)
Water Meter Fee (Domestic)$2,094.75
(100% due at Issuance of Water Meter)
Water Meter Fee (Irrigation/Fireline)$299.25
(100% due at Issuance of Water Meter)
Water Meter Deposit (Domestic)$210.00
(100% due at Issuance of Water Meter)
Irrigation/Fireline Meter Deposit$30.00
(100% due at Issuance of Water Meter)
Wastewater Impact Fee$10,521.00
(100% due at Issuance of Building Permit)
Wastewater Tap Inspection Fee$350.00
(100% due at Issuance of Building Permit)
Utility Final Inspection Fee$350.00
(100% due at Issuance of Building Permit)
Park Fee$3,855.00$3,855.00
(100% due prior to Filing Plat)
Roadway Impact Fee$1,908.00$1,908.00
(100% due prior to Filing Plat)
Street Light FeeInformation not Available
(100% due prior to Acceptance of Project)
Street Sign FeeInformation not Available
(100% due prior to Acceptance of Project)
Construction Inspection FeeInformation not Available
(100% due prior to Start of Construction)
TOTAL$32,042.00
TOTAL AMOUNT DUE PRIOR TO FILING FINAL PLAT
$5,763.00
ROADWAY IMPACT FEE CALCULATIONS
PROJECT:
Petterson Add. (Encore of Coppell)
DATE:
12/2/2013
ROADWAY IMPACT FEE:
Service Area *1
Category **Residential
Land Use **Residential (Medium/Low)
No. Lots/Units7
Development Units **7.00
Vehicle Miles per Development Unit **4.24
Fee per Vehicle Mile ***$150
Roadway Impact Fee due = (Development Units) x
(Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) =$4,452.00
* (Figure 4.1 - Roadway Impact Fee Study)
** (Table 4.10 - Roadway Impact Fee Study)
*** (Schedule 2, Page 3 - The Master Fee Schedule)
$2,544 was paid on 1/29/2009
AMOUNT DUE:$1,908.00