Loading...
Encore of Coppell feesDEVELOPMENT FEES PROJECT NAME: Encore of Coppell (formerly Petterson Addn) ENGINEER:Hamilton/Duffy ORIGINATION DATE:2/28/2007revised 12/2/13 SENTASSESSMENTASSESSED FEEAMOUNT PD DATE Water Impact Fee$12,024.00$900.006/3/1999 Wastewater Impact Fee$10,521.00$900.006/3/1999 Park Fee$8,995.00$3,855.006/3/1999 $1,285.00ra3/2/2007 $3,855.00ra12/3/2013 Roadway Impact-Zone$4,452.00$1,710.006/3/1999 $198.00ra3/2/2007 $636.00cd1/29/2009 $1,908.00ra12/3/2013 Street Light Street Sign Construction InspectionTBD EG or Bore Permit Overtime Inspection Water Tap Inspection$400.00 Wastewater Tap Inspection$350.00 Water Meter (Domestic)$2,094.75 Water Meter (Fire/Irrig)$299.25 Meter Deposit (Domestic)$210.00 Meter Deposit (Fire/Irrig)$30.00 Utility Final Inspection$350.00 Subtotal to Eng.$13,447.00$13,447.00$0.00 Total FeesFees PaidAmount Owed TOTALS$39,726.00$15,247.00$24,479.00 NOTES Prior To ConstructionDate ReceivedPrior To Final Acceptance Erosion Control ApprovedAs Built Plan Recd. E.P.A.-N.O.I. Recd.Paving Bond Recd. Const. Plan ApprovedUtilities Bond Recd. Erosion Control Maint. l 1 I CASH ��� ,,--� ; '� 096731 li RECEIPT Date _ -_-_ ,�!-±!- _ Received From 1 - ' .Z._. , ,`.,, 1-. ��... ;' 6 G t'3 ? • tic 5-rift 5-rift i A Address EN ,b k . 0 .. _'.O PPS L L A 1 r V � Dollars $ 5,7 ` ` For T— ws' r� - fir r ACCOUNT HOW PAID AMT. ACCOUNT . , f Ki AM PAID e 7 j mm , �- R r' r ,� :r f °14`7---" BALANCE MONEY ORDER i DUE CREDIT GARDE] J iii .1'n,t ■474,.. IN,,4.-, NTTy,,,r, ti, ✓ T.' , y, r 1 r 1 W..,, •F4„ 'yg,Y:..:,,.1-1. u� ,k, ..:..0),. , s∎., ii I N`,N, THIS DOCUMENT HAS AN ARTIFICIAL WATERMARK PRINTED ON THE BACK.THE FRONT OF THE DOCUME.. 4 - F ,ioS A MINT SIGNATURE LINE.ABSENCE OF THESE FEATURES WILL INDICATE A COPY, ( P A . Y`411)_l1 i '' 10002146 78 `er ViewPoint Bank,N.A. 64.305 611 r PO Box 869105•Plano,TX 75086-9105 K--;- o 972-578-5000•viewpointbank.com Five Thousand Seven Hundred Sixty Three Dollars and No Cents DATE 12/3/2013 C r PAY TO THE CITY OF COPPELL tb $5,763.00 % \, DEVELOPMENT FEE TABLE Project:Petterson Add. (Encore of Coppell) Date: 12/2/2013 TOTALAMOUNT DUE FEES DUEPRIOR TO FILING PLAT Water Impact Fee$12,024.00 (100% due at Issuance of Building Permit) Water Tap Inspection Fee$400.00 (100% due at Issuance of Water Meter) Water Meter Fee (Domestic)$2,094.75 (100% due at Issuance of Water Meter) Water Meter Fee (Irrigation/Fireline)$299.25 (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic)$210.00 (100% due at Issuance of Water Meter) Irrigation/Fireline Meter Deposit$30.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee$10,521.00 (100% due at Issuance of Building Permit) Wastewater Tap Inspection Fee$350.00 (100% due at Issuance of Building Permit) Utility Final Inspection Fee$350.00 (100% due at Issuance of Building Permit) Park Fee$3,855.00$3,855.00 (100% due prior to Filing Plat) Roadway Impact Fee$1,908.00$1,908.00 (100% due prior to Filing Plat) Street Light FeeInformation not Available (100% due prior to Acceptance of Project) Street Sign FeeInformation not Available (100% due prior to Acceptance of Project) Construction Inspection FeeInformation not Available (100% due prior to Start of Construction) TOTAL$32,042.00 TOTAL AMOUNT DUE PRIOR TO FILING FINAL PLAT $5,763.00 ROADWAY IMPACT FEE CALCULATIONS PROJECT: Petterson Add. (Encore of Coppell) DATE: 12/2/2013 ROADWAY IMPACT FEE: Service Area *1 Category **Residential Land Use **Residential (Medium/Low) No. Lots/Units7 Development Units **7.00 Vehicle Miles per Development Unit **4.24 Fee per Vehicle Mile ***$150 Roadway Impact Fee due = (Development Units) x (Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) =$4,452.00 * (Figure 4.1 - Roadway Impact Fee Study) ** (Table 4.10 - Roadway Impact Fee Study) *** (Schedule 2, Page 3 - The Master Fee Schedule) $2,544 was paid on 1/29/2009 AMOUNT DUE:$1,908.00