Loading...
NLW-_Pelican Ln DrainageFLOODPLAIN DEVELOPMENT PERMIT NAME OF PERMITEE: ei PERMIT NO. 9Z LLO D V ,J The above named permitee applied for a FLOODPLAIN DEVELOPMENT PERMIT on 1 le, J~. The application has been reviewed by the FLOODPLAIN ADMINSTRATOR and it has been determined that the proposed development is located,within aryentifiablpfloodplain of: The FLOODPLAIN ADMINISTRATOR has reviewed plans and specifications of the proposed development for conformance with the development standards required by COPPELL Floodplain Ordinance #94639. You are hereby authorized vroceed w9 the 0110 i ¢ascribed 1, To maintain compliance with the development standards of COPPELL Floodplain Ordinance #94639 and to�ldiminate or minimize flood damage potential to the proposed development, you are hereby directed to construct your proposed development in accordance with the following special provisions: r` (,,/j Compliance with the development standards of Coppell Floodplain Ordinance 1194639 including but not limited to: • For residential structures, the lowest floor (including basement) must be elevated to two (2) feet above the 100 - year base flood elevation or one (1) foot above ultimate condition whichever is higher. Certification of the lowest floor must be submitted from a registered professional engineer, architect, or land surveyor. • For non - residential structures, the lowest floor (including basement) must be elevated or floodproofed to two (2) feet above the 100 -year base flood elevation or one (1) foot above ultimate condition whichever is higher. Certification that the floodproofing methods are adequate to withstand the flood depths, pressure, velocities, impact and uplift forces and other factors associated with the base flood must be submitted from a registered professional engineer or architect. • For fill activities, the permittee must submit certification from a registered professional engineer or land surveyor that the level of the compacted fill materials is at or above the elevation of the Base Flood. i (� Certified copy of all final plans or As -Built Drawings must be submitted to the FLOODPLAIN ADMINISTRATOR. (V OTHER PROVISIONS: r MILCU 1Vame Date M 2. 3. 4. CONSTRUCTION DEVELOPMENT PERMIT APPLICATION Name of Applicant: Donald Brewer Address: 77S PP1 i can T.anP Phone Number: 214-415-4467 Location of Construction (address): 775 Pelican Lane Northl ake W6pol ands Past Phaca #6 F 70 Subdivision Section # Block # Lot # •, James Parrish Survey ABST. NO. 113 Survey /Abstract # Acreage Location description (attach vicinity map): Type of proposed construction or development: ( ) Residential ( ) Alteration of a natural waterway drainage course () Non - residential (X) Other (describe & attach drawing or sketch) () Placement of Fill (in right -of -way or on private property) Description of Construction Permit requested: ( ) Paving ( ) Sidewalk ( ) Drive Approach ( ) Excavation ( ) Fire Lane ( ) Bridge ( ) Median or Landscaping ( ) Box Culvert ( ) Water Main kX) R.C.P. ( ) Sanitary Sewer Main ( ) Flume ( ) Inlet ( ) Rip Rap ( ) Fill Area ( ) Drainage Channel Excavation ( ) Slope Protection /Retaining Nall ( ) Parking Lot ❖ Please provide the name, address and 24 hour phone number for supervisor of every contractor working under this general permit. S. All construction shall be in compliance with, but not limited to, the City of Coppell Subdivision Ordinance, Standard Construction Details, Streetscape Plan and approved plans. The contractors shall adhere to the City's Erosion and Sedimentation Ordinance. 6. Applicant shall provide a copy of approved plans, specifications and related cost estimate or contract of the proposed construction for the purpose of permit fee calculations. CONSTRUCTION DEVELC_ .✓LENT PERMIT APPLICATION Page 2 7. A Construction Permit Fee in accordance with the City of Coppell Fee Ordinance shall be paid prior to beginning work. Amount Due: _ 1,228.00 Date Paid: k-1 l 25 / c03 .NOTE: A separate excavation permit is required anytime pavement is cut or when there is work in the right -of -way not approved by the City Engineer. Any work requiring closing of a lane of traffic, street, or alley must be approved by the Engineering Dept. with notification to the following prior to closing: Police Department @ 972 - 304 -3600 Fire Department @ 972 - 304 -3500 Street Department @ 972 - 304 -3546 Engineering Department @ 972 - 304 -3679 Attach barricade plan / trench safety plan of a lane or street closure. (Required) Note: Street closures are allowed _from 9:00 a.m. until 3:00 p.m. ONLY unless otherwise approved by City Engineer. ➢ A pre - construction meeting is required prior to beginning work related to this permit. Contact the inspector to schedule meeting. Donald Brewer Signature of Applicant Printed Name City Inspector FOR CITY USE ONLY 11 -25 -3 Date 6 -Vo -- 7-7641 Contact Number(s) Is the fill area located in an identified flood hazard area? O(YES ( ) NO If YES, then a Floodplain Development Permit is required before any construction can begin. Is additional information required? ( ) YES NO Are other federal, state, or local permits requires? ( ) YES ( NO (PERMIT APPLICATION APPROVED ( ) PERMIT APPLICATION DISAPPROVED W1 0A �' j I I V_ 1A 2ZYL 3 City Approval I I Date Applicant shall indemnify and forever hold harmless against the City of Coppell each and every claim, demand or cause of action that may be made or come against it by reason of or if any way arising out of the closure, blocking, excavating, cutting, tunneling, or other work by the applicant under permit from. the City, if such permit is granted. T H E C 1 T Y O F COPPELL T O F v A S t $ 9 INSPECTION FEE CALCULATION SHEET PROJECT NAME 775 Pelican Lane, Storm Sewer Extension DATE 11-25-03 As per the City of Coppell Subdivision Regulations, the Developer shall pay 4% of the cost of the items to be permitted and inspected by the Engineering Department and dedicated to the City. The Developer shall pay 2% of the items to be inspected by the Engineering Department, but not dedicated to the City such as parking lots, private utilities, private drainage systems and so forth. Inspection fees are due on or before the date of the Pre - construction Meeting. In order to verify the inspection fee due, please provide a copy of the development contract(s) and this spreadsheet with completed calculations to the Engineering Dept. The contract(s) should indicate the cost to construct the following improvements: Construction Development Permit File /forms /feeinspeccost(8 /20/02) GRAND TOTAL I_ $ 1, 228.00 Page 3 PUBLIC IMPROVEMENTS CONTRACT AMOUNT X4%= PRIVATE IMPROVEMENTS CONTRACT AMOUNT X2%= PAVING WATER SANITARY SEWER STORM SEWER ALLEYS SIDEWALKS OTHER TOTAL Construction Development Permit File /forms /feeinspeccost(8 /20/02) GRAND TOTAL I_ $ 1, 228.00 Page 3 I www.FourDC� - -; - tiction, corn i Date: 0 09/22/2003 FAX 972 2869178 To: i BRIAN E. DINGLER 2010 VALLEY VIEW SL 'TE 300 DALLAS. TX 75234 P i Project: 1775 PELICAN LN Location: COPPEL, TX Four D Construction, Inc FL 3 Construction. Inc. 11200 Old Seagoville Road Balch Springs, TX 75180 Phone: (972) 286 -0094 FAX: (972) 286 -9178 10002 Four D Consction, Inc. is pleased to uovide a quote for the above referenced project. Please review the following bid items and associate,' costs. This quote is bas ad on plans provided by: VILBIG & ASSOCIATES BID ITEM 7 ITEM DE: CRIPTION QTY UofM UNIT PRICE EXTENDED PRICE 1 30" RCP TYPE 111 165 LF $102.80 $16,962.00 2 130" RCP TYPE B HDWI 1 EA $1,950.00 $1,950.00 3 REMOVE EXISTING HV I & CONNECT TO 30" 1 EA $400 -00 $400.00 4 TRENCH SAFETY 1 LS $350.00 $350.00 5 SOD FOR DISTURBED 4REA 733 SY $3.00 $2,199.00 6 .," : VNTENANCE BOND 1 LS $660.00 $660.00 7 RIP RAP 25 SY $65.00 $1,625.00 8 SILT FENCE 25 LF $2.50 $62.50 9 HAUL IN FILL 1012 CY $6 -00 $6,072.00 10 TOTAL $30,700.79 We have allo4ed 1 week for constructic n PROVISIONS[ This price for haul -in fill may be reduced if a close source is found. This dirt is hauled from South Dallas. 1. Silt fence will be instal ed by the L.F. as required by the City. 2. All underground utility 3onflicts to be relocated by others_ 3. Sodding can be done ty owner, if Four D installs, actual measured quanities will be charg ad. 4. Payment will be for qu inities actually installed. 5. Exclusions: a. Tree Protection f. Inspection Fees and Permits b. Landscaping and Spri :klers g. Construction Staking, Layout and Surveying c. Traffic Control h. Additional Mobilization d. Water for densities. (C an be acquired from water hose at house.) e. Density and Soils Tes ng 6. Pricing valid for 30 dad s from date above. Signed: Name. j—e,qZanie Title: Pre DONALD E. BREWER 2009 TXDL 08129440 PH. 972 - 406 -3702 2010 VALLEY VIEW LANE SUITE 300 30- 7426/3140 DALLAS, TX 75234 Dote U(L_- Pa to the Order of l� - V - - -- __ _ _._. Dollars � 0" _ ` USAA FEDERAL SAVINGS BANK ``I 10750 McDERMOTT FWY A USA` SAN ANTONIO, TEXAS 8288 -0544 (210) 456 41000 1-800- -832 -3724 1. For- CASH ilZ 058007 RECEIPT Date Received From 9- Address —, ZOl b v ?52384 $ 22- , DO VDollars g For l Gil E 7a EC T O N F G' o� a C) v ACCOUNT HOW N AML OF ACCOUNT CASH _ AMT. PAID. 2Q OZ CHECK aa, BALANCE MONEY ORDER ❑ DUE CREDIT CARD❑ B)(