Shadowridge Estates, Phase 5
DEVELOPMENT FEES
PROJECT NAME: Shadowridge Estates, Phase 5, Lot 2 & 3
ENGINEER:Middleton & Associates
ORIGINATION DATE:11/6/2013
SENTASSESSMENTASSESSED FEEAMOUNT PAID DATE
Water Impact Fee$3,006.00
Wastewater Impact Fee$3,006.00
Park Fee$2,570.00$2,570.00ra12/18/2013
Roadway Impact-Zone$1,272.00$1,272.00ra12/18/2013
Street Sign
Street Light
Construction Inspection
EG or Bore Permit
Overtime Inspection
Water Tap Inspection$100.00
Wastewater Tap Inspection$100.00
Water Meter (Domestic)$598.50
Water Meter (Fire/Irrig)$0.00
Meter Deposit (Domestic)$60.00
Meter Deposit (Fire/Irrig)$0.00
Utility Final Inspection$100.00
Subtotal to Eng.$3,842.00$3,842.00$0.00
Total FeesFees PaidAmount Owed
TOTALS
$10,812.50$3,842.00$6,970.50
NOTES
Prior To ConstructionDate ReceivedPrior To Final Acceptance
Erosion Control ApprovedAs Built Plan Recd.
E.P.A.-N.O.I. Recd.Paving Bond Recd.
Const. Plan ApprovedUtilities Bond Recd.
Erosion Control Maint.
r 1
CASH
RECEIPT Date /_/is '3 . . 096734
Received Frofn ' ' ' e 1 ' L1�G'map rn
_
Q.ii cm Address e r s P I i , , 1
V >,a N Dollars$31.--42 -�
0 m"4 For 4 r- , °,: 4 , / e� r _ _
cv ACCOUNT HOW PAID
AMT.OF CASH
ACCOUNT
h a w ! .
AMT PAIN e , Q42, CHECK A C d
BALANCE v MONEY ORDER 0 By
..DUE CREDIT CARDO A
. 3232=61
BAYBRIDGE CONSTRUCTION LLC 111011 2 4
1010 TEXAS STAR CT )
EULESS,TX 76040-5713 DATPC, [ e". ;0(.3
ark v
pJ /J/
„.:
”' PAY TO THE /' � ,/rs� /// I $ 3, �J�� : ,c) ..„:
ORDER OF CFf !—�f/f(/ /X
,---,,--, ✓ W )/ 4d/ri/ r ),.#4,I .
4
,,,,,
, ,
4: CHASE 0
r JPMorgan Chase Bank,N.A.
www.Chase.com z, s 40/97e/a,
MEMO tiWv g _ , S -- -,--- - -- ---t, ------ ,
metal, I-% ,
DEVELOPMENT FEE TABLE
Project:Shadow Ridge Estates 5 Lot 1-3
Date:
11/6/2013
TOTALAMOUNT DUE
FEES DUEPRIOR TO
FILING
PLAT
Water Impact Fee$3,006.00
(100% due at Issuance of Building Permit)
Water Tap Inspection Fee$100.00
(100% due at Issuance of Water Meter)
Water Meter Fee (Domestic)$598.50
(100% due at Issuance of Water Meter)
Water Meter Fee (Irrigation/Fireline)$0.00
(100% due at Issuance of Water Meter)
Water Meter Deposit (Domestic)$60.00
(100% due at Issuance of Water Meter)
Irrigation/Fireline Meter Deposit$0.00
(100% due at Issuance of Water Meter)
Wastewater Impact Fee$3,006.00
(100% due at Issuance of Building Permit)
Wastewater Tap Inspection Fee$100.00
(100% due at Issuance of Building Permit)
Utility Final Inspection Fee$100.00
(100% due at Issuance of Building Permit)
Park Fee$2,570.00$2,570.00
(100% due prior to Filing Plat)
Roadway Impact Fee$1,272.00$1,272.00
(100% due prior to Filing Plat)
Street Light FeeInformation not Available
(100% due prior to Acceptance of Project)
Street Sign FeeInformation not Available
(100% due prior to Acceptance of Project)
Construction Inspection FeeInformation not Available
(100% due prior to Start of Construction)
TOTAL$10,812.50
TOTAL AMOUNT DUE PRIOR TO FILING FINAL PLAT
$3,842.00
DEVELOPMENT FEE WORKSHEET
PROJECT:
Shadow Ridge Estates 5 Lot 1-3
DATE:
11/6/2013
Water Impact Fee:
Domestic Meter(s):2- 1 inch=3.34ESU's
Irrigation Meter(s):0=0ESU's
0=0ESU's
Fireline Meter(s):0=0ESU's
Total #:3.34ESU's @ $900.00 ea.$3,006.00
(Due prior to issuance of building permit)
Water Tap Inspection Fee:
Total #:2Connections @ $50.00 ea.$100.00
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Domestic Water Meter Fee:
Total #:2Domestic Meter(s) @$299.25$598.50
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
(This fee may change at the time of pick up)
Irrigation/Fireline Water Meter Fee:
Total #:0Irrigation Meter(s) @$0.00$0.00
Total #:0Additional Irrigation Meter(s) @$0.00$0.00
Total #:0Fireline Meter(s) @$0.00meter provided by developer
(100% due prior to issuance of water meters)
Domestic Water Meter Deposit Fee:
Total #:2Meter(s) @ $30.00 ea.$60.00
(100% due prior to issuance of water meters)
Irrigation/Fire Meter Deposit Fee:
Total #:0Meter(s) @ $30.00 ea.$0.00
(100% due prior to issuance of water meters)
Wastewater Impact Fee:
Total Domestic Meters ESU's:3.34@ $900.00 ea.$3,006.00
(Due prior to issuance of building permit)
Wastewater Tap Inspection Fee:
Total #:2Connections @ $50.00 ea.$100.00
(100% due prior to issuance of building permit)
Utility Final Inspection Fee (All developments):
Total #:2Lots @ $50.00 ea.$100.00
(100% due prior to issuance of building permit)
Page 1
DEVELOPMENT FEE WORKSHEET
Park Fee (For Residential Developments Only):
* Preliminary plat approved:After October 26, 1993
Park Development Zone : Zone 1
2Single-family @$1,285.00per lot$2,570.00
0Multi-family @$1,285.00per unit$0.00
(100% paid prior to Council approval of final plat)
Roadway Impact Fee:
(See attached fee calculations)$1,272.00
Street Lighting Fees:
Assessed for lighting in the City's right-of-way. Information not Available
This fee cannot be assessed until after Oncor submits
the lighting plan for the proposed development.
Once the plans are submitted, $352.44 per light will be assessed.
(100% due prior to final acceptance of development)
Street Sign Fees:
Assessed for signage in the City's right-of-way. Information not Available
(See attached fee calculations if applicable)
Construction Inspection Fees:
A copy of the development contract must be submitted for assessment.Information not Available
The contracts should indicate the cost to construct the improvements
that are inspected by the Engineering Department.
(2% of development cost required for private improvements)
(4% of development cost required for public improvements)
Page 2
ROADWAY IMPACT FEE CALCULATIONS
PROJECT:
0
DATE:
11/6/2013
ROADWAY IMPACT FEE:
Service Area *1
Category **Residential
Land Use **Residential (Medium/Low)
No. Lots/Units2
Development Units **2.00
Vehicle Miles per Development Unit **4.24
Fee per Vehicle Mile ***$150
Roadway Impact Fee due = (Development Units) x
(Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) =$1,272.00
* (Figure 4.1 - Roadway Impact Fee Study)
** (Table 4.10 - Roadway Impact Fee Study)
*** (Schedule 2, Page 3 - The Master Fee Schedule)
AMOUNT DUE:$1,272.00