Shake & Shingle-Ph 3
DEVELOPMENT FEES
PROJECT NAME: Shake & Shingle Addn, Phase 3
ENGINEER:2/14/2013
ORIGINATION DATE:Hennessey Engineering
SENTASSESSMENTASSESSED FEEAMOUNT PAID DATE
Water Impact Fee$1,503.00
Wastewater Impact Fee$1,503.00
Park Fee
Roadway Impact-Zone$6,921.60$6,921.60RA6/7/2013
Street Sign
Street Light
Construction Inspection$2,758.30$2,758.30ra2/14/2013
EG or Bore Permit
Overtime Inspection
Water Tap Inspection$50.00
Wastewater Tap Inspection$50.00
Water Meter (Domestic)$299.25
Water Meter (Fire/Irrig)$0.00
Meter Deposit (Domestic)$30.00
Meter Deposit (Fire/Irrig)$0.00
Utility Final Inspection$50.00
Subtotal to Eng.$9,679.90$9,679.90$0.00
Total FeesFees PaidAmount Owed
TOTALS
$13,165.15$9,679.90$3,485.25
NOTES
Prior To ConstructionDate ReceivedPrior To Final Acceptance
Erosion Control ApprovedAs Built Plan Recd.
E.P.A.-N.O.I. Recd.Paving Bond Recd.
Const. Plan ApprovedUtilities Bond Recd.
Erosion Control Maint.
1
CASH
RECEIPT Date 0 7713 096705
o Received From 74-7.-0-1 Ff G Ln/STRII ��C7DI LP
/-I INGt- r�
Q,�$ Address S Ak " $ e 1 (�n� SE
wm N /�.(0�0 ^ �/ �nkpL/�C/tLh1 1.sD Dollars$4 2 '�PZ
O i:1 For ROA" I4 //��T/`-`-C /'�t -------
a a�
pa
V N U ACCOUNT HOW PAID
M
AMCT OF UM CASH
ACO4 �f Yf��NjL�
0 AMTPA1D4 /2,/S0 CHECK 'U/J7 /52 ,�I�
BALANCE d MONEY ORDER❑ By
` DUE CRENT CARD❑ 1
L