Loading...
Shake & Shingle-Ph 3 DEVELOPMENT FEES PROJECT NAME: Shake & Shingle Addn, Phase 3 ENGINEER:2/14/2013 ORIGINATION DATE:Hennessey Engineering SENTASSESSMENTASSESSED FEEAMOUNT PAID DATE Water Impact Fee$1,503.00 Wastewater Impact Fee$1,503.00 Park Fee Roadway Impact-Zone$6,921.60$6,921.60RA6/7/2013 Street Sign Street Light Construction Inspection$2,758.30$2,758.30ra2/14/2013 EG or Bore Permit Overtime Inspection Water Tap Inspection$50.00 Wastewater Tap Inspection$50.00 Water Meter (Domestic)$299.25 Water Meter (Fire/Irrig)$0.00 Meter Deposit (Domestic)$30.00 Meter Deposit (Fire/Irrig)$0.00 Utility Final Inspection$50.00 Subtotal to Eng.$9,679.90$9,679.90$0.00 Total FeesFees PaidAmount Owed TOTALS $13,165.15$9,679.90$3,485.25 NOTES Prior To ConstructionDate ReceivedPrior To Final Acceptance Erosion Control ApprovedAs Built Plan Recd. E.P.A.-N.O.I. Recd.Paving Bond Recd. Const. Plan ApprovedUtilities Bond Recd. Erosion Control Maint. 1 CASH RECEIPT Date 0 7713 096705 o Received From 74-7.-0-1 Ff G Ln/STRII ��C7DI LP /-I INGt- r� Q,�$ Address S Ak " $ e 1 (�n� SE wm N /�.(0�0 ^ �/ �nkpL/�C/tLh1 1.sD Dollars$4 2 '�PZ O i:1 For ROA" I4 //��T/`-`-C /'�t ------- a a� pa V N U ACCOUNT HOW PAID M AMCT OF UM CASH ACO4 �f Yf��NjL� 0 AMTPA1D4 /2,/S0 CHECK 'U/J7 /52 ,�I� BALANCE d MONEY ORDER❑ By ` DUE CRENT CARD❑ 1 L