Loading...
Sherrill Acres-Lt 3 Blk 1 DEVELOPMENT FEES PROJECT NAME: Sherrill Acres, Lot 3 (Unificare) ENGINEER: Allen & Ridinger Consulting ORIGINATION DATE: 11/19/2004 SEN ASSESSMENT ASSESSED FEE AMOUNT PAIL DATE Water Impact Fee $3,640.00 tewater Impact Fee $2,240.00 Park n/a Roadway I act-Zone $4,660.32 $4,660.32 rb 2/2/2005 Street Sign Street Light t , Construction Inspection to be calculated EG or Bore Permit Overtime Inspection Water Tap Inspection $150.00 Wastewater Tap Inspection $50.00 Water Meter(Domestic) $211.72 Water Meter (Fire/Irrig) $3,431.73 Meter Deposit (Domestic) $30.00 Meter Deposit(Fire/Irrig) $60.00 Utility Final Inspection $50.00 Subtotal to Eng. $4,660.32 $4,660.32 $0.00 Total Fees Fees Paid Amount Owed TOTALS $14,523.77 $4,660.32 $9,863.45 NOTES Prior To Construction Date Received Prior To Final Acceptance Erosion Control Approved As Built Plan Recd. E.P.A.-N.O.I. Recd. Paving Bond Recd. Const. Plan Approved Utilities Bond Recd. Erosion Control Maint. CHASE 0 TRI-STAR CONSTRUCTION, INC. JPMorgan Chase Bank,N.A. 3601 YUCCA DRIVE BLDG.2 wwwChase.com FLOWER MOUND,0(75028 32-61-1110 (972)221-5558 2/14/2014 PAY TO THE 0 ORDER OF City of Coppell $ **3,191.50 2I6 Three Thousand One Hundred Ninety-One and DOLLARS z- - co City of Coppell 500 Southwestern Blvd. Coppell, TX 75019 MEMO AUTHORIZED SIGNATURE Justice Benefits/13-046 ' CASH at 096746 RECEIPT Date / Received From TE,/ s-T-14 NS, LI Ai Address 3H—C-eR.e,/L 1- ° 2 9 Dollars$ 0 For AT3144/% 40-01, ACCOUNT HOW PAID ACCOUNT CASH mu) 0 AMT RAI", 'CHEON' $ < < - SAI-ANOt, MONEYSFIDER ' 1/4 • Eiu tROxicAlIDEI 4 By I