Sherrill Acres-Lt 3 Blk 1 DEVELOPMENT FEES
PROJECT NAME: Sherrill Acres, Lot 3 (Unificare)
ENGINEER: Allen & Ridinger Consulting
ORIGINATION DATE: 11/19/2004
SEN ASSESSMENT ASSESSED FEE AMOUNT PAIL DATE
Water Impact Fee $3,640.00
tewater Impact Fee $2,240.00
Park n/a
Roadway I act-Zone $4,660.32 $4,660.32 rb 2/2/2005
Street Sign
Street Light t ,
Construction Inspection to be calculated
EG or Bore Permit
Overtime Inspection
Water Tap Inspection $150.00
Wastewater Tap Inspection $50.00
Water Meter(Domestic) $211.72
Water Meter (Fire/Irrig) $3,431.73
Meter Deposit (Domestic) $30.00
Meter Deposit(Fire/Irrig) $60.00
Utility Final Inspection $50.00
Subtotal to Eng. $4,660.32 $4,660.32 $0.00
Total Fees Fees Paid Amount Owed
TOTALS $14,523.77 $4,660.32 $9,863.45
NOTES
Prior To Construction Date Received Prior To Final Acceptance
Erosion Control Approved As Built Plan Recd.
E.P.A.-N.O.I. Recd. Paving Bond Recd.
Const. Plan Approved Utilities Bond Recd.
Erosion Control Maint.
CHASE 0
TRI-STAR CONSTRUCTION, INC. JPMorgan Chase Bank,N.A.
3601 YUCCA DRIVE BLDG.2 wwwChase.com
FLOWER MOUND,0(75028 32-61-1110
(972)221-5558 2/14/2014
PAY TO THE 0
ORDER OF City of Coppell $ **3,191.50
2I6
Three Thousand One Hundred Ninety-One and
DOLLARS z-
-
co
City of Coppell
500 Southwestern Blvd.
Coppell, TX 75019
MEMO AUTHORIZED SIGNATURE
Justice Benefits/13-046
'
CASH
at 096746
RECEIPT Date /
Received From TE,/ s-T-14 NS, LI Ai
Address 3H—C-eR.e,/L 1-
° 2 9 Dollars$
0
For AT3144/% 40-01,
ACCOUNT HOW PAID
ACCOUNT CASH
mu)
0 AMT RAI", 'CHEON'
$
< < -
SAI-ANOt, MONEYSFIDER '
1/4 • Eiu tROxicAlIDEI 4 By I