Villas at Lake Vista Ph 2 DEVELOPMENT FEES
PROJECT NAME: Villas at Lake Vista, Phase 2
ENGINEER: Dowdey, Anderson &Assoc.
ORIGINATION DATE: 10/22/2012 (Revised 11/2/12)
SENT ASSESSMENT ASSESSED FEE AMOUNT PAID DATE
Water Impact Fee $66,420.00
Wastewater Impact Fee $58,617.00
Park Fee $50,115.00 $50,115.00 ra 11/8/2012
Roadway Impact-Zone $24,804.00 $24,804.00 ra 11/8/2012
Street Sign $623.30 $623.30 RA 2/4/2013
Street Light $1,410.17 $1,410.17 RA 2/4/2013
•
Construction Inspection $17,142.15 $17,142.15 ra 11/8/2012
8/14/2011 Early Grading (free dirt) $0.00 $0.00 8/14/2011
Early Grading permit $2,606.23 $2,606.23 Ih 10/12/2012
11/17/2012 Overtime Inspection $216.00 $216.00 ra 12/10/2012
Water Tap Inspection $2,050.00
Wastewater Tap Inspection $1,900.00
Water Meter(Domestic) $11,670.75
Water Meter(Fire/Irrig) $1,480.50
Meter Deposit(Domestic) $1,170.00
Meter Deposit(Fire/Irrig) $90.00
Utility Final Inspection $1,950.00
Subtotal to Eng. $96,916.85 $96,916.85 $0.00 j
Total Fees Fees Paid Amount Owed
TOTALS $242,265.10 $96,916.85 $145,348.25
NOTES
Prior To Construction Date Received Prior To Final Acceptance
2/15/2013 Erosion Control Escrow $4,743.00 As Built Plan Recd.
E.P.A.-N.O.I. Recd. Paving Bond Recd.
Const. Plan Approved Utilities Bond Recd.
Erosion Control Maint.