CF-Village-CS 890918GINN CONSULTING ENGINEERS
S eptembe~19 8 9
Mr. Karl D. Hirschey
Cajun Contractors, Inc.
P.O. Box 540487
Dallas, Texas 75354-0487
Re: Village Parkway Pump Statio~
City of Coppell, Texas
Change Order #3
Dear Mr. Hirschey:
Attached please find two (2) executed copies of Change Order #3
for the above referenced project. Thank you for your cooperation
with this matter. Please contact us if you have any questions.
Sincerely,
Sa~'ford W. Case, P.E.
Project Manager
enclosure
cc: Russell Doyle, P.E. Steve Goram
Dorothy Timmons, w/ 2 enclosures
H. Wayne Ginn, P.E.
Smoky Ginn
File 380
17103 Preston Road · Suite 100 · LB 118 · Dallas, Texas 75248 · Phone 214/248-4900
~l~structions on rcvcrsc side) ~"'~-
I'ROJI~CI': Village Par~ay ~ Station I)A'I'IT OF ISSUANCE: S/31/89
OWNER: City of Coppell
P.O. ~x 478
(N,,,,c. Coppell, ~ 75019
Address)
CONTRACFOI{: ~j~ Contractors, Inc. OWNER',
P.O. Box 104
Baton ~uge, ~ 70821-0104 ENGINI~IiR: Gi~, Inc. Consulter ~gineers
CpNTRACI' FOR: Village Par~ay ~ Station
ENGINEER's I'rojcct No. 580
You ;irc dircclcd Io m;ikc thc I'ollowing changes iii thc Contract Documents.
i)cscriplion: Tnsta11 an additional 296. $ VLF of 18" diameter drilled piers.
I'url~SeorCha.ge Order: Extra depth required on the 52 piers to reach suitable
stratum for pier penetration.
Alladm,cnls:ll.isld~munlc,,ISSUl,porlingcha,,§c) l. Cajun Contractors letter dated 4/12/89
2. Contract Documents Section 02577
CI IANGI':. IN CONTRACT PRICI~: . CI IAN(;F. IN CON'I'RACT TIM F.:
Origisml COllll'ilCl I'ricc O,'igi,ml C. olllr&lct 'l'i,.c
2,336,772.00 300 calendar days
I'rcvious Change (hdcrs No. 1 to No. 2 Nel clmngc I'rom previous Chh.ge Orders
0
2,300.00
days
COlilI'ilCI I'ricc prior to Ibis Clumgc Ordcr Conlrnct Time I'rior Io this Change Order
2, ~59,072.00 500 calen~r
Ncr Increase (~ .... n~ of this Cha.gc Ordcr Net increase (dccrcnsc) of this Change Order
8,434.00 -O-
Collti'acl I'ricc with all approved Ch;age Orders Conirncl Time with all approved Change Ordcrs
2,347,506.00 300 caIen~ ~ys