Loading...
CF-Village-CS 890918GINN CONSULTING ENGINEERS S eptembe~19 8 9 Mr. Karl D. Hirschey Cajun Contractors, Inc. P.O. Box 540487 Dallas, Texas 75354-0487 Re: Village Parkway Pump Statio~ City of Coppell, Texas Change Order #3 Dear Mr. Hirschey: Attached please find two (2) executed copies of Change Order #3 for the above referenced project. Thank you for your cooperation with this matter. Please contact us if you have any questions. Sincerely, Sa~'ford W. Case, P.E. Project Manager enclosure cc: Russell Doyle, P.E. Steve Goram Dorothy Timmons, w/ 2 enclosures H. Wayne Ginn, P.E. Smoky Ginn File 380 17103 Preston Road · Suite 100 · LB 118 · Dallas, Texas 75248 · Phone 214/248-4900 ~l~structions on rcvcrsc side) ~"'~- I'ROJI~CI': Village Par~ay ~ Station I)A'I'IT OF ISSUANCE: S/31/89 OWNER: City of Coppell P.O. ~x 478 (N,,,,c. Coppell, ~ 75019 Address) CONTRACFOI{: ~j~ Contractors, Inc. OWNER', P.O. Box 104 Baton ~uge, ~ 70821-0104 ENGINI~IiR: Gi~, Inc. Consulter ~gineers CpNTRACI' FOR: Village Par~ay ~ Station ENGINEER's I'rojcct No. 580 You ;irc dircclcd Io m;ikc thc I'ollowing changes iii thc Contract Documents. i)cscriplion: Tnsta11 an additional 296. $ VLF of 18" diameter drilled piers. I'url~SeorCha.ge Order: Extra depth required on the 52 piers to reach suitable stratum for pier penetration. Alladm,cnls:ll.isld~munlc,,ISSUl,porlingcha,,§c) l. Cajun Contractors letter dated 4/12/89 2. Contract Documents Section 02577 CI IANGI':. IN CONTRACT PRICI~: . CI IAN(;F. IN CON'I'RACT TIM F.: Origisml COllll'ilCl I'ricc O,'igi,ml C. olllr&lct 'l'i,.c 2,336,772.00 300 calendar days I'rcvious Change (hdcrs No. 1 to No. 2 Nel clmngc I'rom previous Chh.ge Orders 0 2,300.00 days COlilI'ilCI I'ricc prior to Ibis Clumgc Ordcr Conlrnct Time I'rior Io this Change Order 2, ~59,072.00 500 calen~r Ncr Increase (~ .... n~ of this Cha.gc Ordcr Net increase (dccrcnsc) of this Change Order 8,434.00 -O- Collti'acl I'ricc with all approved Ch;age Orders Conirncl Time with all approved Change Ordcrs 2,347,506.00 300 caIen~ ~ys