Loading...
Westhaven Addition DEVELOPMENT FEES PROJECT NAME: Westhaven Addition, Phase 1 ENGINEER:Kimley-Horn ORIGINATION DATE:5/25/2012 SENTASSESSMENTASSESSED FEEAMOUNT PAID DATE Water Impact Fee$138,294.00 Wastewater Impact Fee$128,700.00 Park Fee$183,755.00$183,755.00ra4/11/2013 Roadway Impact-Zone$90,948.00$90,948.00ra4/11/2013 Street Sign Street Light 4%Construction Inspection$101,981.79$101,981.79ra4/11/2013 EG or Bore Permit$6,558.75$6,558.75lh12/27/2012 Overtime Inspection Water Tap Inspection$7,250.00 Wastewater Tap Inspection$7,150.00 Water Meter (Domestic)$25,525.00 Water Meter (Fire/Irrig)$1,764.00 Meter Deposit (Domestic)$4,290.00 Meter Deposit (Fire/Irrig)$60.00 Utility Final Inspection$7,150.00 Subtotal to Eng.$383,243.54$383,243.54$0.00 Total FeesFees PaidAmount Owed TOTALS $703,426.54$383,243.54$320,183.00 NOTES Prior To ConstructionDate ReceivedPrior To Final Acceptance Erosion Control ApprovedAs Built Plan Recd. E.P.A.-N.O.I. Recd.Paving Bond Recd. Const. Plan ApprovedUtilities Bond Recd. Tree Removal Permit$225,000.00 12/17/2012Erosion Control Maint. Flood Study Review$3,500.00 5/25/2012 PareF:. 3.'46244 CITY COPPELL•• Check N9 C4!Flt Date 04/10/13 .: ••• DATE FPO REMARKS GROSS DEDUCTION •AMOUNT PAID WESTHAyEN FEES 040913 . • -,4::130sdWay fees - „-274,703 .00 .„. 376,684 79 cAs' RECEIPT Date 4/11/1 3 082595 Received From pi3a/Fic or 12( 15 8 Ts Address • a.?) Dollar 7?: 1 „ .T„:,'•• ..,C) . p4t. p IL) 8- ACCOUNT HOW PAID AMT OF„, C) , „ CASH c1 . 51153097 0, A P 374 i://5„ f7 BALANCE MT. co DUE . , Standard Pacific Payee: 146244 CITY. OF COPPELL • .• Check- Check Date INvoicE DATE FPO REMARKS GROSS DEDUCTION AMOUNT PAID WESTHA yE N FEES 040913 ' 274,703 .00 - 376,684.79 376,684.79 CITY OF COPPELL """""•""":":""•:""":".•”: . . 70-2328/719 Standard Pacific of Texas,Inc. •.•• .• • . .: • :' • Dallas Division • Bank of America • : 909 Lake Carolyn Parkway,Suite 1700 Commercial Disbursement Account NO.. .51153097'. -----, Irving TX 75039 Northbrook,IL (972)550-0426 DATE AMOUNT . • ' ' - ' . • ;• 04/1 0/13 .„ - : THREE HUNDRED SEVENTY SIX THOUSAND SIX HUNDRED EIGHTY FOUR AND 79/100 AAAAAAAAAAAAAA PAY TO THE ' ' STANDARD PACIFIC CORP, - GENERAL ACCOUNT ---- ORDER OF:-- CITY OF COPPELL . . PO BOX 9478 •••• , COPPELL TX 7 5 0 1 9 . - . • • .. •., 4110.1! T H C I T Y b p.._ COPPELL i CONSTRUCTION DEVELOPMENT PERMIT APPLICATION Name of Applicant: Address of Applicant: Phone Number: c5% FAX Location of Construction (address, if available): AN CST RAVC� ) a n -ph 1. Subdivision Section # OR Date Submitted: Survey /Abstract # Acreage Location description (attach vicinity map): Block # Lot # 1. Type of proposed construction or development: (L- 'Residential O Alteration of a natural waterway drainage course O Non - residential O Other (describe & attach drawing or sketch) O Placement of Fill (in right -of -way or on private property) 2. Description of Construction Permit requested: ( Pav' g () Median or Landscaping ( idewalk (ter Main () Drive Approach ( ) Excavation ( ) Fire Lane ( ) Bridge (*97. C.P. ( unitary Sewer Main () Flume nlet ( ) Box Culvert ( ) Rip Rap ( ) Fill Area ( ) Drainage Channel Excavation ( ) Slope Protection /Retaining Wall ( ) Parking Lot Provide an attachment containing the name and 24 -hr. contact phone number of supervisor(s) for every contractor working under this general permit. 3. All construction shall be in compliance with, but not limited to, the City of Coppell Subdivision Ordinance, Standard Construction Details, Streetscape Plan and approved plans. The contractors shall adhere to the City's Erosion Control & Sedimentation Ordinance. 4. Applicant shall provide a copy of approved plans, specifications and related cost estimate or contract for the purpose of permit fee calculation verification. CONSTRUCTION DEVELOPMENT PERMIT APPLICATION Page 2 5. A Construction Inspection Permit Fee shall be paid prior to beginning work, in accordance with the City of Coppell Fee Ordinance. See Page 3 for calculation formula. Amount Due: $ �Q / j��'/ . 7 'F Date Paid: ` - 1113 NOTE. A separate excavation permit is required anytime pavement is cut or when there is work in the right -of -way not approved by the City Engineer. ➢ Any work requiring closure of a lane of traffic, street, or alley must be approved in advance by the Engineering Dept., with notification to the following prior to closure: Police Department 0 972 - 304 -3600 Street Department (& 972 - 462 -5150 Fire Department a 972 - 3043500 Engineering Dept. 0 972 - 304 -3679 ➢ Attach barricade plan / trench safety plan of a lane or street closure. (Required) ➢ It is a requirement of this permit that As -Built Drawings be turned in at the end of this project. As- Builts consist of 1 set full size paper copy, 1 set full size mylar and CD with Autocad.dwg files. NOTE. Street closures are allowed from 9.00 a. m. until 4.00 p m ONLY unless otherwise approved by City Engineer. ➢ A pre - construction meeting is required prior to beginning work related to this permit. 4S'a ntact the ' s for assigned to your project to schedule the meeting. rV f A is Printed Nam Contact Number /_A'2f(/ DD VlS 972! - 304 -3G.,N 46R- 576 =7747 Ci Inspector Contact Number(s) FOR CITY USE ONLY Is the rill area located in an identified flood hazard area? ( ) YES ( ) NO If YES, a Hoodplain Development Permit is required before any construction can begin. Is additional information required? ( ) YES ( ) NO Are other federal, state, or local permits required? ( ) YES ( ) NO ( ) PERMIT APPLICATION APPROVED ( ) PERMIT APPLICATION DENIED City Approval Date Applicant shall indemnify and forever hold harmless against the City of Coppell each and every claim, demand or cause of action that may be made or come against it by reason: of or if any way arising out of the closure, blocking, excavating, cutting, tunneling, or other work by the applicant under permit from the City, if such permit is granted. F�1 � 1�1 1.4 ' b o� u R H A z V �ti FBI a ti 0 O a� cd O 5 b Q„ O O y 'Z7 A C ) � o CA o �cn0 �o ac 0 4 v, d 8 �t O _! y N U id O pip O vi L. c °zs u . ° ' 03 c >o Q > ' o Ln _ E'er,., 4 o c C 0 �U y H ° T3 ° w +, a� =cd cd .° a C� °' ' w � W ° �v =� 0 U C V C) cz O. b0 U O' p U 0 QwTSw ►.� u II 0 N F a °Q E. a dz �o a M II •off . � f�V H OQ U a tY, w 3 � H p a¢, 3 cQn En ¢ M o�L a ot H z P a 0 d a d a A a C u 2 a 0 U STANDARD PAUHG Payee: 146244 CITY OF COP ,L Check No. - 51150 Check Date - 12/21/12 ` T H E C 1 T Y O F COPPEL,L T � o Mark Harris, P.E. Kimley -Horn & Associates 5750 Genesis Court Suite 200 Frisco, Tx 75034 RE: Westhaven Phase I Fee Assessment Letter Dear Mr. Harris, March 20, 2013 Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy of the Development Fee calculations for the referenced development. Please make payment for the Impact Fees to the City of Coppell in the amount of $274.703.00 and forward to the Engineering Department along with a copy of the Fee Assessment table. This amount is a portion of the assessed fees that need to be paid prior to filing of the final plat. Please note that the Water and Sewer Impact Fees are due and payable at the issuance of a Building Permit. Also, please provide a copy of the Engineer's estimate or contract to our office so the 2% & 4% construction inspection fee can be verified. The construction inspection fees must be paid prior to scheduling a pre - construction meeting. The additional fees for water and sewer taps, water meters, and utility inspection fees need to be paid by separate check at the Public Works Service Center, 816 S. Coppell Road. Meters will be ordered when those fees are paid. Appropriate payment of the required fees will help insure a successful beginning of this project. We look forward to working with you on this project. If you have any questions, please contact me. Sincerely, Mich . Civil Engineer cc: Jennifer Miller, Finance Director Amy Swaim, Administrative Technician, Building Inspections Glenn Hollowell, Assistant Director of Public Works Tim Oates, Deputy Chief /Prevention Brad Reid, Director of Parks and Recreation Michael Arellano, Chief Building Official 255 PARKWAY * P.O.BOX 9478 * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673 DEVELOPMENT FEE TABLE Project: Westhaven Phase I Date: 312012013 TOTAL AMOUNT DUE FEES DUE PRIOR TO FILING PLAT Water Impact Fee $138,294.00 (100% due at Issuance of Building Permit) Water Tap Inspection Fee $7,250.00 (100% due at Issuance of Water Meter) Water Meter Fee (Domestic) $25,525.50 (100% due at Issuance of Water Meter) Water Meter Fee (Irrigation/Fireline) $1,764.00 (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic) $4,290.00 (100% due at Issuance of Water Meter) Irrigation/Fireline Meter Deposit $60.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee $128,700.00 (100% due at Issuance of Building Permit) Wastewater Tap Inspection Fee $7,150.00 (100% due at Issuance of Building Permit) Utility Final Inspection Fee $7,150.00 (100% due at Issuance of Building Permit) Park Fee $183,755.00 $183,755.00 (100% due prior to Filing Plat) Roadway Impact Fee $90,948.00 $90,948.00 (100% due prior to Filing Plat) Street Light Fee Information not Available (100% due prior to Acceptance of Project) Street Sign Fee Information not Available (100% due prior to Acceptance of Project) Construction Inspection Fee Information not Available (100% due prior to Start of Construction) TOTAL $594,886.50 $274,703.00 TOTAL AMOUNT DUE PRIOR TO FILING FINAL PLAT DEVELOPMENT FEE WORKSHEET PROJECT: Westhaven Phase I DATE: 312012013 Water Impact Fee: Domestic Meter(s): 143 - 5/8 inch X 3/4 inch = 143 Irrigation Meter(s): 2 - 2 inch = 10.66 0 = 0 Fireline Meter(s): 0 = 0 Total #: 153.66 ESU's @ $900.00 ea. (Due prior to issuance of building permit) Water Tap Inspection Fee: Total #: 145 Connections @ $50.00 ea. (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Domestic Water Meter Fee: Total #: 143 Domestic Meter(s) @ $178.50 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) (This fee may change at the time of pick up) Irrigation/Fireline Water Meter Fee: ESU's ESU's ESU's ESU's $138,294.00 $7,250.00 $25,525.50 Total #: 2 Irrigation Meter(s) @ $882.00 $1,764.00 Total #: 0 Additional Irrigation Meter(s) @ $0.00 $0.00 Total #: 0 Fireline Meter(s) @ $0.00 meter provided by developer (100% due prior to issuance of water meters) Domestic Water Meter Deposit Fee: Total #: 143 Meter(s) @ $30.00 ea. (100% due prior to issuance of water meters) Irrigation/Fire Meter Deposit Fee: Total #: 2 Meter(s) @ $30.00 ea. (100% due prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ESU's: 143 (Due prior to issuance of building permit) @ $900.00 ea Wastewater Tap Inspection Fee: Total #: 143 Connections @ $50.00 ea. (100% due prior to issuance of building permit) Utility Final Inspection Fee (All developments): Total #: 143 Lots @ $50.00 ea. (100% due prior to issuance of building permit) Page 1 $4,290.00 $60.00 $128,700.00 $7,150.00 $7,150.00 DEVELOPMENT FEE WORKSHEET Park Fee (For Residential Developments Only): * Preliminary plat approved: After October 26, 1993 Park Development Zone: 143 Single- family @ $1,285.00 per lot 0 Multi- family @ $1,285.00 per unit (100% paid prior to Council approval of final plat) Roadway Impact Fee: (See attached fee calculations) Street Lighting Fees: Assessed for lighting in the City's right -of -way. This fee cannot be assessed until after Oncor submits the lighting plan for the proposed development. Once the plans are submitted, $352.44 per light will be assessed. (100% due prior to final acceptance of development) Street Sign Fees: Assessed for signage in the City's right -of -way. (See attached fee calculations if applicable) Construction Inspection Fees: A copy of the development contract must be submitted for assessment. The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Department. (2% of development cost required for private improvements) (4% of development cost required for public improvements) Page 2 Zone 1 $183,755.00 $0.00 $90,948.00 Information not Available Information not Available Information not Available ROADWAY IMPACT FEE CALCULATIONS PROJECT: Westhaven Phase I DATE: 312012013 ROADWAY IMPACT FEE: Service Area * 1 Category ** Residential Land Use ** Residential Medium/Low No. Lots/Units 143 Development Units ** 143.00 Vehicle Miles per Development Unit ** 4.24 Fee per Vehicle Mile * ** $150 F adway Impact Fee due = (Development Units) x ehicle Miles per Development Unit ) x (Fee per Vehicle Mile ) = $90,948.00 * (Figure 4.1 - Roadway Impact Fee Study) ** (Table 4.10 - Roadway Impact Fee Study) * ** (Schedule 2, Page 3 - The Master Fee Schedule) lu T W[ C t t t 0 V EARLY GRADING / EXCAVATION PERMIT IN RIGHT -OF -WAY / EASEMENT / PRIVATE PROPERTY City Contractor Date: 12/21/12 ❑ ❑ Grading plans provided and approved. (Erosion Control must be installed prior to beginning work.) ❑x ❑ Tree Removal Permit from Parks & Recreation Dept. required. ❑x ❑ Hold Harmless Letter from the Property Owner /Engineer /Developer is attached. Project Name /Location: Westhaven / South. of SH 121 and Bus 121 General Contractor: Vilhauer_ Permit issued to Company /Representative: Standard Pacif ic, / Chip Boyd Address: 909 Lake Carolyn Pkwy, Suite 1700, Irving, TX 75039' Telephone #: 972.590.2400 Emergency Telephone #: 51`2.567 4504 General Description of work (provide copy of approved plans): Grading and clearing associated with 297 single family lots and floodplain modifications. ➢Was contact made with City and /or Utility Companies to locate existing utilities? if NO, Reason: ( Yes (' No ➢Was contact made with Parks & Recreation Dept. concerning Tree Removal Permit? if NO, Reason: G Yes r No is removal of existing street, alleys, or sidewalks necessary? (` Yes (*'No if YES, Attach Bore /Street Cut /Saw Cut Permit ➢Is Floodplain Permit required? (*'Yes (" No if YES, Permit # or date of City Council variance Early Gradinq / Excavation Permit Page 2 Representative(s) of the Contractor must adhere to all construction standards approved by the City of Coppell, which includes but is not limited to: Erosion Control Ordinance, compaction requirements (density tests will be required at the applicant's expense), Tree Ordinance and barricading according to the Texas Manual on Uniform Traffic Control Devices. Area(s) affected must be restored to as good condition as before the commencement of work (grading, drainage, vegetation, and erosion control). ➢Any work requiring closing of a lane of traffic, street, or alley must be approved by the Engineering Dept. with notification to the following prior to closing: Police Department @ 972 - 304 -3600 Fire Department @ 972 - 304 -3512 Street Department @ 972 - 462 -5150 Engineering Department @ 972 - 304 -3679 ➢Attach barricade plan /trench safety plan of a lane or street closure is required. Note: Street closures are allowed from 9:00 a.m. until 3.30 p.m. ONLY unless otherwise approved by City Engineer. ➢A 2% inspection fee for grading is required prior to beginning work. (Attach copy of excavation contract for verification) Amount Paid $ 6558.75 Date Paid 12 / 26 /12 ❖City inspector must be notified 24 hours prior to beginning work related to this permit. Printing ur name ipWcates your acceptance of the terms and conditions of this form: ign ur of Appli nt /Contractor Rep. Date Signature of City Engin er c City In pector for this project 12- Date Contact Number(s) Applicant shall indemnify and forever hold harmless against the City of Coppell each and every claim, demand or cause of action that may be made or come against it by reason of or if any way arising out of the closure, blocking, excavating, cutting, tunneling, or other work by the applicant under permit from the City, if such permit is granted. Appendix I Tree Removal Permit Application TREE REMOVAL PERMIT APPLICATION City of Coppell, Texas Date: -I'l, Permit Number. (Issued by City upon appmval) Property Location: Ln\j � ou 5, 1 jr,,�c Attach additional sheets as accessary. TWS 2pPUC2d0a must be accompanied by a PL= or Preliminary Plat of the site. Proposed new development must attach a Trte Survey. I understand this application is subject to all rules and regulations pertaining to Section 34-U of the Zoning Ordinance Code Boql,ofthe City ofl:cppeg. Tem. z Applicant Signature:_ e- z Staff Use Only Approve%Pisapproved By., Date --CO-M—Mefilts: r Receipt No -006 Fee Paid: ?M �70 Appendix J I. DETERIMINATION of GROSS RETRIBUTION for PROTECTED TREES Determination in Inches: INCHES (DBM of TREE REMOVED times (x) I inch egUGROSS RETRIBtMON in INCHES (DBIO Determination in Man: GROSS RETRIBUTION in INCHES (DBH) times S 100.00 i zw Ii != GROSS RETRIBUTION in DOLLARS inches (DBH) X10 inchq pm inches (DBH) X $100.00 S 2. DETERMINATION of GROSS RETRIBUTION for SPECIMEN and HISTORIC TREES Determination in Inches: INCHES (DBH) of TREE REMOVED tunes (x) 10 inches 1 equj�s.( =.) GROSS RETRIBUTION in INCHES (DBH) mopes (DBR) X 10, incites (DBH) Determination in Dollars: The appraised value of the tree as determined by the Cotnxl of Landscaping Tree Apprsiaars (C'LTA) Guidelina. Appel K DETERMINATION of RETRIBUTION CREDITS Non- ReidmtW Property GROSS RETRIBUTION inches (DBM minus ( -) PRESERVATION CREDIT. Trees Preserved on Site inches (DW divided by (;r) Tots! Trees on Site inches (DBH) f =1 Preservation Pa'cx =ge times (x) Gross Retribution inches (DBM PRESERVATION CREDTr - inches (DBM minus ( -) LANDSCAPING CREDrr dyes (DBM zs (4 NET RETRIBUTION inches (DBB) rimes (x) S 100.00 x $100.00 . CONTRIBUTION to CITY of COPPELL REFORESTATION _ and NATURAL AREAS FUND S 1, 0 o Q (� fir... 4 +�. i A Payee: 146244. CITY OF COP-,,,LL Check NO. - 511501oi Check Da te - 11/30/12 INVOICE DATE FPO REMARKS GROSS DEDUCTION AMOUNT PAID ..................... .. . .... ....... :2 g. ---------- ------- ---------- -2 -6, ........... ..... . ... . .......... ...... .......... ............... .. ...... . .... ...................... . .... .................... .C.... .M ............ . .O....F .. CO- P PE- LL - XX .... � .. ... : . . . .. .I .. - ......................... . ............. . . % . ... ......... .....S....1...1...5...0...1... 84 P 0 BOX 9478 COPPELL TX 75019 Standard Pacific Payee: 146244 CITY OF COPPELL Check No. - 51150184 Check Date - 11/30/12 INVOICE DATE FPO REMARKS GROSS DEDUCTION AMOUNT PAID ............... . . .. ........ .. ....... ... .... ..... ..... 1 11 .... I. . . ..... ...... ................................ ---------- -------- ---------- .. ....... ............ .......... .. . . ...... ..... .................... ........... .......... ................ ........ .................................. i .. . .. I` .* ....................... . .... . .............................. ....... ... .. .. . .......... 1..: --', :m .............. ................... . .............. . ..... ..... ........... I ............ -1 .. I ..... %: .: ...... . ........ . ...... ... .. .. ................ ............. ......... ........... ..... ........... ....... ..... ...... .. . . ..... RMOW: ....... ... ...... . .. ..................... .................... .... . ..... .... . .... . . ..... ................. ." .................... .... ............ . ................ ............. ...... ** ........ . ............. . . .... ........... ......... . ..... ........... ....... ........... .......... ........................... . . .... ...... ....... :- ............................... ........................ . . ...... . ........... ........ ......... ........ mom; ..... ..... .. . .. ... . .. . ..... ..... . . .. ...... .... ........ mo ................... .... CITY OF COPPELL Standard Pacific of Texas, Inc. I Dallas Division 909 Lake Carolyn Parkway, Suite 1700 Irving TX 75039 (972) 550-0426 70-2328f719 Bank of America Commercial Disbursement Account No. 51150184 Northbrook, IL DATE AMOUNT 11/30/12 $ * *225,000.00 TWO HUNDRED TWENTY FIVE THOUSAND AND 00/100 PAY TO THE STANDARD PACIFIC CORP. ORDER OR CITY OF COPPELL ENERALACCOUNT P 0 BOX 9478 COPPELL TX 75019 .� AV�_,.,, . _ ,..n� �...`. ��.,: ....... 3 . .: , .. .:_ ....... .... .: .......... enm iH•Y.. ....... ". .- wrxCw��x�n,ma�w'. ". '. waba�..