Loading...
Blackberry Farm-SY121108 (4)Technical Report and CDC Application on the Elm Fork of the Trinity River for The Holmes Builders 7r1i9 100352 �,.•'�Q `��S�ONIII•EN ^L`•�' ht0.roti City of Coppell Dallas County, Texas by: O'Brien Engineering, Inc. 14900 Landmark, Suite 530 Dallas, Texas 75254 Ph: 972- 233 -2288 Fax: 972 - 233 -2818 November 8, 2012 V W W 4� m n O V h L W L n rA Table of Contents , I. Introduction II. 1 Objectives of This Study III. ............................................................. ..............................1 Hydrologic Analysis ..................................................................... IV. ..............................1 Hydraulic Analysis Appendix C — Cross Section Comparison Plots .......................... ............................... A. Methodology Appendix D — CDC Application Forms ......................................................................... ..............................1 B. Current CDC Model (Base Model) ........................................ ..............................2 C. Revised CDC Model ............................................................. ..............................2 D. Pre - Project Model ................................................................. ..............................3 E. Proposed- Project Model (With- Project Model) V. ..................... ............................... 3 Valley Storage Analysis VI. ............................................................. ............................... 4 Operation and Maintenance Summary VII. ........................................ ..............................4 Results & Conclusions ............................................................... ............................... 5 Tables Table 1 Summary of 1 % AC Flood Water Surface Elevations and Velocities .................. 6 Table 2 Summary of SPF Water Surface Elevations and Velocities . ............................... 7 Appendices Appendix A — Exhibits ,a��ti�tttt1t Exhibit 1 — Hydraulic Workmap «•.Zj* OF TF- rgttrt Exhibit 2 — Site Map VC000 «A« _•ti, s t Exhibit 3 — Proposed Site Grading Plan r *= r. * Appendix B — Hydraulic Model Printouts P, JACOB LE'• SUEP -•••••••••••••• r Current CDC Model a� 9 ., 100352 Revised CDC Model t t� � � ...... tI With- Project Model liIONAL,�� ~�' Appendix C — Cross Section Comparison Plots 2. Appendix D — CDC Application Forms Appendix E — Digital Copies of Hydraulic Model Data I. Introduction O'Brien Engineering, Inc. (OEI) is under contract with The Holmes Builders (Owner) to prepare an application for a Corridor Development Certificate (CDC) for the development of a 54.6 -acre tract in Coppell and Carrollton, Texas. The subject tract is located north of Sandy Lake Road, west of the Elm Fork of the Trinity River (Elm Fork), and approximately 2000 feet east of MacArthur Boulevard. Denton Creek flows through the subject tract and drains into Elm Fork approximately 5,400 feet downstream. II. Objectives of This Study The primary objectives of this study are to evaluate the floodplain of Elm Fork in the vicinity of the subject tract to ensure that the proposed development would not increase the design flood water surface elevations or erosive velocities and to ensure that the proposed development would not result in valley storage losses for the 1% annual chance (11% AC) flood and the Standard Project Flood (SPF), greater than 0.0% and 5.0% respectively. III. , Hydrologic Analysis No hydrology was developed for this project. The hydraulic model for this project evaluation uses the peak flood flow rates based on future anticipated watershed development for the year 2050. IV. Hydraulic Analysis A. Methodology The floodplain and channel topography for the subject area were obtained from on- the- ground field data surveyed by Kadleck & Associates mapped to one -foot contour interval topography. The topography for limited portions of the floodplain outside of the project site were augmented with the North Central Texas Council of Governments (NCTCOG) 2007 aerial photography mapped to 2 -foot contour intervals. The topography for portions of the Denton Creek channel were augmented with topography developed for the Trinity River Corridor Mapping from a 1 1991 aerial survey mapped to 2 -foot contour intervals. The hydraulic analysis was conducted using the U.S. Army Corps of Engineers (USAGE) water surface profiles computer program, HEC -RAS (version 4.0). In addition,-the hydraulic model has two sets of geometry data based on high frequency flood flow rates, consisting of the 10% to 1 % AC floods and low frequency flood flow rates consisting of the 0.2 % AC and the SPF floods. Channel and overbank reach lengths were digitally measured using AutoDesk's AutoCAD software. Manning's roughness coefficients were verified through field reconnaissance with reference to "Guide for Selecting Manning's Roughness Coefficients for Natural Channels and Flood Plains Water - Supply Paper 2339," by the United States Geological Survey, 1989 and Ven Te Chow, "Open - Channel Hydraulics ". B. Current CDC Model (Base Model) The United States Army Corps of Engineers (USACE) model for Elm Fork of the Trinity River was requested and obtained from USACE. The data obtained is in HEC -RAS format. The model was input into OEI's database and executed to verify ;data integrity. C. Revised CDC Model The Base model received from USACE was used as a platform for establishing the Revised CDC model through the project area. The Revised CDC model in the present study for Elm Fork was established by adding one cross section (97792) in the project vicinity and moving cross section 97178 approximately 180 feet downstream to river station 96997. The profiles of these two sections and section 97919 were updated with the topography data described in the methodology section of this report. Contraction and expansion coefficients used in the model are 0.1 and 0.3 respectively for normal floodplain conditions and 0.3 and 0.5 respectively near constrictions. Downstream reach lengths were updated based on the location of the new cross sections. Manning's roughness coefficients were entered into the model on the new sections using the horizontal variation method, consistent with the base model. Ineffective flow limits based on contraction of flow due to encroachment of 4 the Sandy Lake Road bridge were maintained based on the USACE workmap produced for the base model and mapping. The model cross section locations are illustrated on Exhibits 1 and 2, "Hydraulic Workmap" and "Site Map" found in Appendix A. D. Pre - Project Model The purpose of the Pre - Project model is to simulate any man -made changes constructed since development of the base modeling. The Pre - Project model is developed from the Revised Base model as a platform and, therefore, includes corrections and updated topography. For this study, the Pre - Project model for Elm Fork is identical to the Revised Base model as there were no modifications in the project vicinity, since the development of the base modeling. Therefore, no separate Pre - Project model for Elm Fork is included herein. E. Proposed Project Model (With- Project Model) The Pre - Project model was used as a platform to develop the With- Project Conditions model. The With- Project model for Elm Fork represents floodplain modifications, which would result from the proposed development, which includes placement of fill in the right overbank due to the proposed development. The proposed floodplain modifications begin near cross section number 97919 and continue through cross section 96997. Excavation of a pond is proposed on a portion of the subject tract near cross sections 97919 and 97792. Manning's roughness values were adjusted on cross sections 97919 through 96997 to represent proposed site conditions. Roughness coefficients used in the remainder of the model are identical to those in the Pre- Project model. The proposed development is illustrated in attached Exhibit 3, "Proposed Site Grading Plan" of Appendix A. 3 V. Valley Storage Analysis Valley storage for the proposed site was calculated using ArcGIS 9.2 by generating digital surfaces of the existing topography, the proposed topography, and the floodwater surface elevations. A comparison of each surface was used to determine the valley storage implications of the proposed site. Floodplain fill for the project site encompasses the majority of the site in areas designated as sub - divided residential lots and streets. Compensation for this loss in valley storage has been provided by two excavated ponds located on the east side of the subject property as indicated on Exhibit 3, Site Grading Plan. The baseline discharge established in the CDC Manual for the Elm Fork is 4000 cfs, which was used in the Revised CDC model for this study to establish the baseline discharge valley storage elevations. The CDC Manual states that, "valley storage below the water surface elevations produced by the baseline discharge shall be considered ineffective, unless a control structure is designed to ensure that the entire volume is available for storage." The average water surface elevation produced by the baseline discharge in the project vicinity was determined to be 1,437.8 feet. The proposed ponds will be excavated to an elevation of 435.0 feet. Final construction drawings for these ponds will include a pipe large enough to drain the ponds down to the proposed elevation of 435.0 feet within a reasonable time and will contain a flap gate device attached to the pipe outlet,. The flap gate will be designed to prevent flow from small flooding events on Denton Creek into the ponds and reserve the valley 'storage in the ponds for larger flooding events on the Elm Fork. VI. Operation and Maintenance Summary The proposed project contains a significant amount of modified floodplain represented in the With- Project model. These floodplain modifications will need to be maintained after construction is completed to keep the With- Project model conditions correctly represented on the ground. The majority of the project site was simulated in the With - Project model using the ineffective flow option specifically around the residential sub- divided lots. In this area no maintenance is required to maintain consistency with the C! model`, However, the area surrounding the northern excavated pond will need to be maintained with the appropriate vegetative cover representing the model roughness conditions. In addition, the proposed drainage pipe and flap-gate should be inspected and cleaned of any debris on an annual basis and after significant events to ensure proper functionality. VII. Results & Conclusions As indicated on Tables 1 -2 and in the CDC Application Form Parts 1 and 2 (Application) included in Appendix D, the 1 % AC and SPF With- Project flood water surface elevations and erosive velocities would not increase when compared to the Pre - Project Conditions. The results from the valley storage computations as referenced in the attached Application indicate that there would be no loss in valley storage in the 1% AC flood event and no loss greater than 5.0% in the Standard Project Flood. The project will not result in adverse conditions on Elm Fork of the Trinity River, nor cause an increase to the water surface elevations on the subject tract. We trust that the above details and enclosed data will provide the City with sufficient information to review the project and ask that the City of Coppell forward the study to the USACE in order to begin the CDC review process. 61 Table 1 Summary of 1 % AC Flood Water Surface Elevations and Velocities Location Cross Section Base Model Corrected Base Model With- Project Model Difference Water Surface Elevation (Ft) Velocity Channel (fps) Water Surface Elevation (Ft) Velocity Channel (fps) Water Surface Elevation (Ft) Velocity Channel (fps) Water Surface Elevation (Ft) Velocity Channel (fps) Column Number ID (1) (2) (3) (4) (5) (6) (5)-(3) (6)-(4) 110074 450.41 6.06 450.40 6.06 450.40 6.06 0.00 0.00 109445 450.02 3.85 450.01 3.86 450.01 3.86 0.00 0.00 107964 449.84 2.24 449.82 2.24 449.82 2.24 0.00 0.00 106657 449.53 3.85 449.52 3.87 449.52 3.87 0.00 0.00 105936 449.34 3.20 449.33 3.21 449.33 3.21 0.00 0.00 105167 449.00 4.53 448.98 4.55 448.98 4.55 0.00 0.00 102686 448.80 1.80 448.78 1.81 448.78 1.81 0.00 0.00 101428 448.72 2.06 448.70 2.07 448.70 2.07 0.00 0.00 99708 448.60 2.33 448.58 2.34 448.58 2.34 0.00 0.00 98884 448.47 2.77 448.44 2.79 448.44 2.79 0.00 0.00 near Upstream Limit of Project 97919 448.28 2.94 448.26 2.78 448.26 2.86 0.00 0.08 97792 - - 448.23 2.89 448.22 2.87 -0.01 -0.02 97178 447.97 4.04 - - - - - - 96997 - - 447.92 4.19 447.92 4.19 0.00 0.00 near Downstream Limit of Project 93940 445.81 7.68 445.81 7.68 445.81 7.68 0.00 0.00 93359 444.76 7.86 444.76 7.86 444.76 7.86 0.00 0.00 Upstream Sandy Lake Road 93297 444.49 9.83 444.49 9.83 444.49 9.83 0.00 0.00 Downstream Sandy Lake Road 93212 .444.52 8.50 444.52 8.50 444.52 8.50 0.00 0.00 93197 444.54 7.79 444.54 7.79 444.54 7.79- 0.00 0.00 93196 442.95 17.09 442.95 17.09 442.95 17.09 0.00 0.00 93191 442.70 17.92 442.70 17.92 442.70 17.92 0.00 0.00 Table 2 Summary of SPF Flood Water Surface Elevations and Velocities Location Cross Section Base Model Corrected Base Model With- Project Model Difference Water Surface Elevation (Ft) Velocity Channel (fps) Water Surface Elevation (Ft) Velocity Channel (fps) Water Surface Elevation (Ft) Velocity Channel (fps) Water Surface Elevation (Ft) Velocity Channel (fps) Column Number ID (1) (2) (3) (4) (5) (6) (5)-(3) (6)-(4) 110074 451.93 7.70 452.97 7.82 452.97 7.82 0.00 0.00 109445 451.32 5.00 452.41 5.01 452.40 5.01 -0.01 0.00 107964 451.05 2.99 452.16 3.01 452.16 3.02 0.00 0.01 106657 450.63 4.70 451.84 4.25 451.84 4.25 0.00 0.00 105936 450.36 4.06 451.63 3.86 451.62 3.86 -0.01 0.00 105167 449.82 5.95 451.26 4.93 451.26 4.93 0.00 0.00 102686 449.49 2.34 451.01 2.22 451.01 2.21 0.00 -0.01 101428 449.37 2.67 450.92 2.44 450.92 2.42 0.00 -0.02 99708 449.18 3.07 450.78 2.82 450.77 2.86 -0.01 0.04 Upstream Tie -in Limit 98884 448.97 3.50 450.63 3.17 450.62 3.16 -0.01 -0.01 near Upstream Limit of Project 97919 448.67 3.83 450.44 2.97 450.43 3.15 -0.01 0.18 97792 - - --450.41 3.01 450.40 2.69 -0.01 -0.32 97178 448.25 4.72 - ' 96997 - - 450.21 3.67 450.21 3.74 0.00 0.07 near Downstream Limit of Project 93940 447.23 4.43 449.76 3.33 449.76 3.33 0.00 0.00 93359 446.89 4.98 449.62 3.49 449.62 3.49 0.00 0.00 Upstream Sandy Lake Road 93297 446.50 8.80 449.52 5.63 449.52 5.63 0.00 0.00 Downstream Sandy Lake Road 93212 446.51 7.27 449.51 4.54 449.51 4.54 0.00 0.00 93197 446.59 5.80 449.52 4.03 449.52 4.03 0.00 0.00 93196 446.36 10.43 449.44 7.22 449.44 7.22 0.00 0.00 93191 446.35 10.44 449.44 7.22 449.44 7.22 0.00 0.00 o� Lakev ew �� Reau 3 j► ,�� Chalfont moo, OL N /a d�r0 I i i Goi on" may r M 9ht N Pintail ` Fountain Head m a m U ca Fou tain LEGEND Gibbs, !/ Bas d � Forestwood �i 1A _ �- Li� Wt=CAl % /i .I Santly Lake Rd J not C3 P� U7 0 Bradt rd Gralievine Creek M .� 3 Glade Point o Pebble Creek Cross Section�� Proposed Lot Layout Limit of Effective Flow (high flows) Stonecr s o�c = Limit of Effective Flow (low flows) (] C Stream Centerline BI /tmore o mac FEMA Flood Hazard Zones (2001) pine 0 AE (1%AC) _ estc �G N Floodway o Coral �fo Coved `4 Cra 0 X500 (0.2% AC) Cuttin g ° (� I It I Barrintton� pelican %j Ta v 0 V \�\1�a 9,7919 93940 93359��N 93.1911 93.141 92351 E B L ,,h � E g1530 U) d N �� 9694 EXHIBIT 1 YBrienEngineering, Inc. 14900 Landmark Blvd, Suite 530 Dallas, Texas 75254 Np: 972.233.2288 f: 972.233.2818 w .OBrienEng.wm Texas Registered Engineering Firm F -3758 THE HOLMES BUILDERS HYDRAULIC WORKMAP 0 500 1 000 Feet DALLAS COUNTY, TEXAS \ DATE: 6/23/2012 OEI JOB #: 347.002 Exhibit 2 Site Map I- Arn- Sandy Lake Rd _4�50 Forestwood f M 10 1 450 7 -,441, 97792 it A N L\ 4 9' 435 444 rF 440 �` 1� 93 -10 eel Qerlf0n._� 0 445 I Site I LEGEND N Proposed Lot Layout — — — — — — — — i Proposed Building Pad Proposed Contour Proposed Retaining Wall Cross Section Limit of Effective Flow (high flows) Limit of Effective Flow (low flows) j Index Contour EXHIBIT 2 O'Brien Eng ineerin g, Inc. 14900 Landmark BW, 0 Suite 530 Dallas, Texas 75254 450 I 1 p: 972,233.2288 f 972.233.2818 —08riffiEng.corn Texas Registered Engineering Firm F-3758 THE HOLMES BUILDERS SITE MAP DALLAS COUNTY, TEXAS DATE: 623/2012 OEI JOB #: 347.002 /96997\ > N L\ 4 9' 435 444 rF 440 �` 1� 93 -10 eel Qerlf0n._� 0 445 I Site I LEGEND N Proposed Lot Layout — — — — — — — — i Proposed Building Pad Proposed Contour Proposed Retaining Wall Cross Section Limit of Effective Flow (high flows) Limit of Effective Flow (low flows) Intermediate Contour Index Contour N 0 100 200 O Feet EXHIBIT 2 O'Brien Eng ineerin g, Inc. 14900 Landmark BW, Suite 530 Dallas, Texas 75254 p: 972,233.2288 f 972.233.2818 —08riffiEng.corn Texas Registered Engineering Firm F-3758 THE HOLMES BUILDERS SITE MAP DALLAS COUNTY, TEXAS DATE: 623/2012 OEI JOB #: 347.002 Exhibit 3 sed Site Grading Plan SCALE: 1'-40' 0 20 40 -so LEGEND FIR Frond kw Rod CA 0— Aron FF Finish near TC Top of Curb TP Top of P—t a Gttw Tw Top of well BW Rotten, of Well +450.0 Exlatnq Elevation --480-- E*" Cont- PrW..d B-tion Plpood Contour MATCH LINE - SEE SHEET 2 - - u t -I II ' II - II; ! / \ \ = — =® — c—= _ _/ _ J !1 I I 1 I 1 1 ! I / / ® / \ \ \\ I 1 I I I 7 P W .51 7 5 TV` 0 PROPO 10 RETAINI W I I IFP51, 1 61' 38 r 4 LAKEWOOD ESTATES 602 IFPSI, ix "R&Itp?. rw 40.0 0 1W 41-1 F: 12 al 3 39 1 ERR 1 4 T 2 rw 5ao 14 t 3 15 Ld TW 50.7 a I I / / / \ Ld Ld 2 (n 31 LFP49, KIMBLE COURT ADDI'I10N vol. 7 M p?. goo ZDAC. LLJ sao A', 4 z -J PROPOSED LL RETAINING WA TH, 0 It A PROP. 5.1, EASEM T 2 Ix BLOCK C BLOCK C /A/ Square Out on top of curb at median nose In centerline Sandy Lake Road, west *Ida of entrance to project. approximately 1100 feet east of Kimbell KourL Elevation 449.25 TBMJ2 Top of 0 found 1/2 inch Iran rod at the northeast comer Of the subject property. Elevation 444.80 o II THIS DOCUMENT IS RELEASED FOR THE PURPOSE OF INTERIM REVIEW UNDER THE AUTHORITY OF L Lynn Kadleck. P.E. 47258 Dote; Aug., 2012 PREPARED BY KADLECK & ASSOCIATES DRIAMONG PLA10" WWxoNO rNiRcINTRAL F) AY WIE 113 72) 1_077, 75074 TAPE Reg. VS F_GM/TWM Rog. Ns 100555-00 D EORP GENCY ACCESS aw r TP&L EASDANT CITY OF cop, -T- SSMH Ix PROP. 5' WALL EASEMENT ffl\ BLOCK C DMiD MYERS SQRKY MST ACT NO. 885 CITY BM J104 Square Out an concrete sidewalk an bridge crossing a "Po' Wv drainage channel an the sc,�jth aide of Sandy Lake Road 12v± feet east of and 51'1 south of the Intersection Kimbel Kourt. of Sandy Lek. Road and Elevation 449.38 TAMAI Square Out on top of curb at median nose In centerline Sandy Lake Road, west *Ida of entrance to project. approximately 1100 feet east of Kimbell KourL Elevation 449.25 TBMJ2 Top of 0 found 1/2 inch Iran rod at the northeast comer Of the subject property. Elevation 444.80 o II THIS DOCUMENT IS RELEASED FOR THE PURPOSE OF INTERIM REVIEW UNDER THE AUTHORITY OF L Lynn Kadleck. P.E. 47258 Dote; Aug., 2012 PREPARED BY KADLECK & ASSOCIATES DRIAMONG PLA10" WWxoNO rNiRcINTRAL F) AY WIE 113 72) 1_077, 75074 TAPE Reg. VS F_GM/TWM Rog. Ns 100555-00 PROPOSED RETAINING W CITY BM 1104 Square cut on concrete sidewalk on bridge crossing a ff-WAR-0-1 r 4120 drainage channel on the south side of Sandy Lake Road I 23 125'± feet east of and 51'± south of the intersection \ of Sandy Lake Road and Kimbel Kourt. CITY OF COPPELL Elevation 449.,18 Square cut on top of curb at medlon none In centerline Sandy Lake Road, West side of entrance to project, ����\ ����'� \� '•� approximately 1100 feet east of Klmbei Kourt. � �\\ \ ! ••� \ Elevation 449.25 ESTATES SCALE 1' -40' _ _. 24 �� \ \\ \\ �� .,_� LOCK D- -. 5 - .. Top of a found 1/2 Inch Iron rod at the northeast o 20 b 80 -- - - tl V.I. 94057. E 7?. 02 \ \ \ �� \� \ ! `�/ ® comer of the subject property. Elewtlon 444.80 LEGEND - - vv �v 4 �_ a FIR Faund hm Rod - \��\ \` \ \ 1 I 3 II FF CA kh Floor Tc Top of Ltiro TP Top of P-t °W Top f Wai / 25 eW eettam of Wen � 11 ! 4459.0 eve vtim --@460 -- - ExI.Wos9 centw •1 t .1 0. Pope c-t- 26 w 312 ' 4. bz / \ 14 312J 27 5 A /BLOC /K / r 1 �1 / r 28 r \\ 49'4. , 9'/,} / Z ! r 25 w5110 1 f 8 / / /r ® jy i �0 1 13 i ® j i 25 , - 29 LAKEWOOD ESTATES 1 V.I. 94057, Pyy. 502 D.R.D.C.T. 49•J 12 \ ® �\ ® __ Ylr 27 LA Li 30 150.0 \ -J\` `'y` ~ W -, _ - 1P \ l 0^ACCESS. \ / TW 50.0 \ w 5120 2X I V Ld / _ \ PROPOSED RETAINING W�LL \ - - -- - -- _ 5120 31 LLJ V BW H. A� z \ \\ } j 32 w 5a0- 10 Bw 7w Sao -- - -� o- ,• ,. �. �i� ewn.r f v cb w 33 9 i err z r/� ter. -, rid i R 50.0 / I 22 H 21 i nr o \ r: c1e 49.e �- I ! / \ / r 1 FOR TDi1E PURPOSE RELEASED INTERIM GRADING PLAN i REVIEW UNDER THE AUTHORITY 35 ! L r / r 512 �I OF L Lynn Kadleck P.E. 47258 pLOCK A , , / 512 ug BLACKBERRY FARM A� 18 Dote: Aug., 2012 ! 6s rr � \ �'1<J fP5Q6 $ -- ` COPPELL, DENTON COUNTY, 7EXAS r LO .BLACKBERRY FARM TW 49.4 r /�r ,.1 \R� PREPARED BY DEVE W4 4442 j ' 7 r KADLECK & ASSOCIATES DESION DRAWN DATE SCALE KtrA PROJECT sHE <r FBaNFBWG PLN9Wa AImEE1k10 MATCH LINE — SEE SHEET 1 790011CMlR&LOPRF�WA.- ..-11- �? ?' ` (972) em -0771 7=4 TAPE Rea. N. F- 64e0/13PLS Rep. " 100355 -00 K&A K3rA AUG.2012 1' =40' 10542 of (PRg RETAINING WALL CITY OF CARROLLTON M7 777 CITY OF DRAINAGE 7 EASEMENT SCALE: l'-40' a 20 40 80 5 ERR Eau x LEGEND C—. ' A- Fhlh Fi- TC TW of Curb 7P Top of Pa t 0 Cutts, TIN Top of still w satt� of Wd .. . ... . ...... (3 459.0 Edffkng Bmtlon --40-- EA.W9 Cantour -J= Pr.P-W E3—tWn Ppcood contour CITY 13M 9104 Square cut on concrete sidewalk on bridge crossing a 10 drainage channel an the nth side of Sandy Lake Road 125'= Test east Or and 51'd: south of the Intersection of Sandy Lake Road and Kimbel Kourt. Elevation 449.38 20 y 21 Square cut an top of curb at median nose In centerline Sandy Lake Road, west old* of entrance to project, I FP51.1 approximately 1100 feet met of Kimbel Kourt. LIMITS OF STORAGE POND Elevation 449.25 TBM#2 Top of a found 1/2 Inch Iron rod at the northeast carrier of the sub)ect property. Elevation 444.80 ig � I t \ 12 2V ORANAGE EIV NASEMENT INE A, BIKE TRAIL 22 C'4 F- Ld LLJ V) LA 23 LIJ 17' V) 14 P-5-001 LLI z _j ix BLOCK F 'Z 15 24 f __ r __1 ® P50,7 9" X A-\ W BLOCK D 'Xk THIS DOCUMENT IS RELEASED 0 Tw Sao C FOR THE PURPOSE OF INTERIM aw "., t 1 REVIEW UNDER THE AUTHORITY OPOSED \W: OF L Lynn Kadleck. P.E. 47258 GRADING PLAN A Date: Aug., 2012 0 RETAININ A BLACKBERRY FARM 49.0 TW rw Sao aw aw mr COPPELL, DENTON COUNTY, TEXAS rfr 0 DEKLOPE7?. BLACKBEIW FARM • 17 4 w P, PREPARED BY --K—KADLECK & ASSOCIATES if DESIGN I DRAWN I D47E I SCALE I K&A nLECAT SHaT _. TRAL E�Y SUM 113 r 71074 MATCH LINE SEE SHEET 4 WE R.Q. " F_"W/MS ft. N� 1005*�-W . K&A I K&A 1AUG.2012 I 1.,'. 1 10542 1?? of ?'?I MATCH LINE - SE / 17 _ � II II II II � i3 SCALE: 1 "-4V 0 20 40 5o II LEGEND — .. . FM Found ken Rod CA Canman Area FF Flnhh Floor Tc Tap of curb r TI, Top of Pavement G am. /- _ r TW Tap of Wdl Bw Bottom of Wdi +439.0 ExMtnq E —tkn / - -4s0 -- F�Nthq Contour �� RapoeW 13= / !Z /lf o a rw "a TW as 12 I / 1w DRAINAOE I PROPOSED COBB LEST CONCRETES I} l® \. 45.9 , 45.8} 1 Sao w n.r - -- - .__ } W 6 PROPO G - - - P x -- �"P49.� / ;RETAINING WALL �111�� / rw Sao } ew�OF wrF.F :' Bwn.1 / Bw ; !� W 43,5 \,l - / ` -- --- LJ V) TV Sao i W fir/ / / PROP. 100 Yr. FLOODPUIN f / i Z ni ' / i if ix: BLOCK F \ v .LIMITS OF STORAGE POND 1 CITY OF COPPELL \\� QTY OMIT LINE 1 /Y'rV K THIS DOCUMENT IS RELEASED FOR THE PURPOSE OF INTERIM REVIEW UNDEP THE AUTHORITY OF L Lynn Kodleck, P.E. 47258 Date: Aug., 2012 PREPARED BY KADLECK & ASSOCIATES 1 G h A,KS N S "A STR4C'T N,.. 698 —Ty o.— S0RYE14I0 W 4�V A3 3A YO. .52 2000 �� .AY SWE 113 OW-0-M 75074 TBPE Reg. Na F- 6480/I M Reg. Na 100495-00 CITY BM 11104 Square cut on concrete sidewalk an bridge crossing a 23.6 AC. drainage channel on the south side of Sandy Lake Road CITY OF CARROLLTON 125't feet suet of and 51't south of the intersection Vol. 91226, Pg. 332 of Sandy Lake Road and Klmbel Kourt. D.R.D.C.T. Elevation 449.38 Tamil Square cut an top of curb at median nose M centerline Sandy Lake Road, west aide of entrance to project, approximately 1100 feet suet of Kimbel Kourt. Elevation 449.25 Top of a found 1/2 Inch Iran rod at the northeast :. comer of the subject property. Elevation 444.80 THIS DOCUMENT IS RELEASED FOR THE PURPOSE OF INTERIM REVIEW UNDEP THE AUTHORITY OF L Lynn Kodleck, P.E. 47258 Date: Aug., 2012 PREPARED BY KADLECK & ASSOCIATES 1 G h A,KS N S "A STR4C'T N,.. 698 —Ty o.— S0RYE14I0 W 4�V A3 3A YO. .52 2000 �� .AY SWE 113 OW-0-M 75074 TBPE Reg. Na F- 6480/I M Reg. Na 100495-00 Appendix Q lei Printouts CDC Model HEC -RAS Plan: Current 1 -100 Locations: User Defined Plan: Current 1 -100 Locations: User Defined HEC -RAS Plan: Current 500SPF Locations: User Defined f_E� � a`` _ a- _ Js, ,ef,, , River _ Reach Riveriver St rofile Q(5s)el � h El W Sftj lev- Grit S EC% te5r, _-F-G, SIGpe_;. „ Y9J GkNM , - F ;., _ , op(Wi jth Froude # Chl_ 1 YEAR -i _ 7200. D011_ (fill 422.53 446.56 (ft 446.62 0.000206 Elm F ork ef3 110074 434.05 2.24 4119.68 599.63 0.11 Elm Fork ef3 110074 2 YEAR 10900.00 422.53 446.74 436.53 446.88 0.000441 3.31 4232.28 608.86 EIm Fcrk ef3 110074 5 YEAR 15000.00 422.53 447.62 439.52 447.81 0.000593 4.00 5103.24 1153.26 0.16 0.19 Elm Fork ef3 11007;AR _ 18700.00 422.53 448.20 441.20 448.45 0.000751 4.63 5842.90 1312.21 0.21 Elm Fork ef3 110074 125 YEAR 24400.00 50 YEAR 29700.00 422.53 449.01 444.10 449.31 0.000899 5.25 6918.11 1355.10 Elm Fork 110074 422.53 449.69 444.11 450.03 0.000999 5.69 7850.26 1391.22 0.24 0.25 EIm.F'ork 910074 100 YEAR _ _ 35600.00 422.53 450.40 444.25 450.78 0.001069 6.06 8859.37 1417.35 0.26 Elm Fork 109445 1 YEPR 7200.00 2 YEPR 10900.00 422.60 448.47 43 1.97 446.50 0.000133 1.50 5558.33 1785.71 0.09 Elm Fork Fe3 109445 422.60 422.60 422.60 446.56 447.40 447.94 434.30 436.80 438.43 446.63 447.48 0.000292 0.000356 0.000423 2.23 2.61 2.94 5717.23 7290.95 8378.45 1786.19 1964. 14 207807 0.13 0.18 EIm Fork 109445 5 YEPR 15000.00 Elm Fork 109445 10 YEAR 18700.00 EIm Fork 109445 25 YEAR 24400.00 50 YEAR 29700.00 422.60 448.69 440.87 448.80 0.000501 3.34 10352..0.17 Elm Fork 109445 422.60 422.60 449.32 450.01 442.81 445.50 449.45 450.14 0.000549 0.000579 363 3.88 12097.25 14011.49 2787.15 2817.92 0.18 0.19 Elm Fork 109445 100 YEAR 35600.00 Elm Fork ef3 107964 1 YEAR 7200.00 422.71 445.97 432.40 446.16 0.001031 3.50 2055.46 1770.97 0.23 _ ` Elm Fork jef3 107964 2 YEAR _ 10900.00 422.71 446.48 434.84 446.52 0.000101 1.14 9375.15 2843.12 0.07 Elm Fork ef3 107964 5 YEAR 15000.00 422.71 447.29 437.76 447.33 0.000147 1.47 12022.14 3728.97 0.09 Elm : Fork ef3 107964 10 YEAR _ _ 18706.00 25 YEAR 24400.00 422.71 447.80 439.80 447.85 0.000179 1.69 14019.79 4042.70 0.10 Elm Fork ef3 107964 422.71 448.52 442.95 448.59 0.000210 1.92 Elm Fork ef3 �!ief3 107964 50 YEAR 29700.00 422.71 449.15 445.40 449.21 0.000230 2.09. 17040.90 19863.55 4211.11 4217.17 0.11 0.11 Elm Fork 107964 100 YEAR 35600.00 422.71 449.82 446.00 449.90 0.000242 2.24 22524.93 4223.77 0.12 1 YEAR 7200.00 Elm Fork_ '.ef3 106657 420.20 445.86 430.73 - 445.90 0.000141 101 Elm Fork_ 'ef3 106657 2 YEAR 10900.00 420.20 446.27 433.10 446.36 0.000260 6083.56 2395.23 0.09 Elm Fork_ 2.79 7252.59 3137.53 0.13 e13 106657 5 YEAR 15000.00 420.20 447.01 435.56 447.11 0.000333 3,26 Elm Fork_ ef3 106657 1 0 YEAR 18700.00 420.20 447.47 437.35 447.59 0.000398 3.63 9934.57 4265.03 0.14 Elm Fork_ 'ef3 106657 25 YEAR 24400.00 420.20 448.18 439.75 448.30 0.000429 3.88 12101.73 15835.46 5012.80 0.16 Elm Forkk ef3 106657 50 YEAR 29700.00 420.20 448.81 441.20 448.92 0.000423 3.94 5543.96 0.17 Elm Fnrlt_ ef3 106657 100 YE AR 35600.00 420.20 449.52 441.20 449.61 0.0003861 3.87 19390.43 23431.441 5696.90 0.17 Elm Fork ef3 Elam Fork 105936 1 YEAR_ 7200.00 5709.42 0.16 418.75 445.63 430.83 445.75 0.000319 2.97 5060,40 4584.77 0.14 ef3 105936 2 YEAR 10900.00 5 YEAR 15000.00 418.75 445.86 433.34 446.07 0.000607 4.14 6051.21 4735.01 0.19 Elm Fork_yef3 105936 418.75 446.83 435.56 446.89 0.000255 2.78 13221.42 EIm Fork ef3 -�36 105936 10 YEA R 18700.00 418.75 447.27 437.27 447.34 0.000287 3.01 15547.12 5145.89 5342.91 0.13 0.13 Elm Fork ief3 ef3 105936 25 YEAR 24400.00 50 YEP,R 29700.00 418.75 418.75 447.97 448.60 439.68 441.72 448.03 448.67 0.000304 3.19 19368.10 5594.60 0.14 rk_Ief3 105936 100 YEAR 35600.00 418.75 449.33 443.46 449.39 0.000298 0.000279 3.23 3.21 22968.13 27136.83 5697.81 5815.03 0.14 0.13 Elm Fcrk jef3 105167 1 YEAR 7200.00 -1419.00 445.40 431.63 445.49 0.000314 2.97 5647.56 _ 2952.22 0.13 Elm Fork r EIm Fark;_ ef3 !ef3 105167 1051117 2 YEAR 10900.00 5 YEAR 15000.00 419.00 419.00 445.31 448.32 434.87 437.13 445.54 0.000769 4.63 5394.02 2728.51 0.21 _ 1 446.50 0.000717 4.67 9317.66 4584.24 0.20 EIm Fork_ ElmForM: EIm Fork_ ef3 ef3 105167 j 1051117 10 YEAR 18700.00 25 YEAR 24400.00 419.00 419.00 446.81 447.53 438.94 445.37 446.99 447.68 0.000733 0.000709 4.82 4.87 11629.25 15132.98! 4779.62 5008.71 0.21 0.21 ef3 105167 50 YEAR 29700.00 419.00 448.20 445.89 448.33 0.000650 4.78 18583.65 5230.71 0.20 Elm Fork._ ef3 _ 10516�AR 35600.00 419.00 448.98 446.44 449.08 0.000556 4.55 22712.15 5409.88 0.18 EIm Fork_ ef3 1026£36 1 YEAF: 8500.00 419.80 443.95 432.76 444.23 0.001037 4.23 2011.03 3009.31 0.24 EIm Fork_ ef3 102686 '2 YEAR 13900.00 419.80 445.06 435.94 445.08 0.000128 1.59 13034.05 5454.55 0.09 Elm Fork_ ef3. 11026865 YEAR 21600.00 419.80 446.06 439.08 446.08 0.000140 1.76 18770.13 6301.26 0.09 Elm Fork ef3 102686 ,10 YEAR 27000.00 419.80 446.55 440.92 446.58 0.000143 1.84 21876.30 6380.40 0.09 Eli m Fork- El ef3 ,102686 25 YEAR 34400.00 419.80 447.26 443.62 447.311 0.000134 1.85 26580.08 6498.40 0.09 Fork_ ef3 102686 50 YEAR 41400.00 419.80 447.97 444.01 448.01 0.000123 1.83 31133.11 6610.62 0.09 ,EIm Fork- ef3 10268 AR 49600.00 419.80 448.78 444.01 448.81 0.000111 1.81 36693.38 7072.10 0.08 Fork_ - ef3 1014216 1 YEAR 8500.00 418.90 443.66 432.76 443.70 0.000225 2.26 7137.87 4062.52 0.11 :EImElm Fork ef3 101428 2 YEAR 13900.00 418.90 444.94 435.72 444.97 0.0001483 1.96 13127.17 5119.49 0.09 EElm -Fork_ ef3 10142R �88!10YEAR 21600.00 418.90 445.95 439.08 445.98 0.000144 2.03 18548.06 6051.45 0.09 ;Eli mFork Ief3 Fork_L� 27000.00 418.90 446.44 443.42 446.47 0.000152 2.13 21733.89 6650.09 0.10 IEIm ef3 _ E10 Elam Fork_ ef3 428 x,25 428 150 YEA +R 34400.00 YEAR 41400.00 418.90 447.18 443.68 447.21 0.000145 2.15 26805.10 7074.06 0.10 _ 'Elm 418.90 447.89 443.89 447.92 0.000134 2.13 31851.81 7291.75 0.09 Fork ef3 i 1 - - LElm ^1428 1100 YEAR 49600.00 418.90 448.70 444.09 448.73 0.000119 2.07 38326.79 8131.06 0.09 Fork _ef3 __ 99708{f1 -1 YEAR 8500.00 417.60 443.24 430.46 443.34 0.000310 2.92 5253.33 3667.02 0.14 Elm Fork _ r__ Im Fork ef3 _ 99708 I2 YEAR 13900.00 417.60 444.74 433.48 444.78 0.000177 2.36 12456.38 5998.04 0.11 Elm Fork ef3 T99708�5 -YEAAR 21600.00 417.60 445.78 436.78 445.81 0.000164 2.38 19108.54 6711.16 0.10 EIm Fork_ ef3 99708 ef3 110 T9WO8 125 YEAf2_ 27000.00 YEAR 34400.00 417.60 417.60 446.27 447.02 438.68 443.78 446.30 447.06 0.000172 0.000160 2.48 2.46 22395.76 27700.29 6831.25 0.11 'ElmFork ef3 99708 150YEAF2 41400.00 417.60 447.74 444.08 447.78 0.000146 7278.69 0.10 _Elm Fork ef3 99 100 YEAR 49600.00 417.60 448.58 444.34 448.61 0.000130 2.41 2.34 33110.27 39739.91 7662.40 8159.97 0.10 0.09 EIm Fork 'ef3 Elm Fork____ ef3 -I} ;9' 98884:2 -70-8 8884 1 YEAR 8500.00 YEAR 13900.00 416.90 416.90 442.76 431.60 442.98 0.000556 4.11 3919.25 3839.35 0.20 Elm Fork ef3 5 YEAR 21600.00 416.90 444.56 445.61 435.69 438.96 444.61 445.65 0.000218 0.000203 2.76 2.79 13329.85 19756.79 5741.52 6313.61 0.13 0.12 Elm Fork ef3 98884 10 YEAF; 27000.00 416.90 446.09 443.59 446.13 0.000215 2.93 22761.74 6390.82 0.13 Elm Fork ef3 98884 25 YEAR t 34400.00 416.90 446.86 444.10 446.90 0.000200 2.91 27742.66 6506.64 0.13 Elm Fork ef3. 9E684 50 YEAR:;! -. 41400.00 416.90 447.60 444.14 447.63 0.000182 2.86 32581.97 6617.66 0.12 HEC -RAS Plan: Pre -Pri 1 -100 Locations: User Defined HEC -RAS Plan: PrePd 500 -SPF Locations: User Defined With- Project Model HEC -RAS Plan: Post 1 -100 Locations: User Defined Plan: Post 1 -100 Locations: User Defined HEC -RAS Plan: PstPri 500SPF Appendix C Cross Section Comparison Plots 0008 OOOL 0009 ddS-009 !Jdlsd - elS lue9 3dS-009 [Jdlsd - Maul ddS-009 [Jdlsd - punoaE ■ JdS-009 Pdaad - elS � Uee s ddS-009 !Jd9Jd - .4aul =]dS-009 GdaJd - punoaE) -�dS-009 [Jdlsd - 2:JV3A 009 SA -A fjdaad - HV3A 009 SM -- pua6a-j (ll) uollelS O9 OOOb 000E OOOZ 00 OZb bLOO L l bLOO L L = Sb Ela = yoeab MJo=l W13 = Janld ddS-005 [Jdaad (Z ddS-005 [Jdlsd 4 :ueld 8664 Aen ZZ - ApnjS A }luul jaddn -9Zb 10£b -SEb m CD Obb o• I � -Sbb 09b 9917 L09b (ll) uoilelS 0009 0009 0004 000£ OOOZ 000 SZb 0£b -5£b E co Obb o Sbb F 3dS-009 fJdlsd - MS MUeO 3dS-OOS Gdlsd - .4aul OSb IdS-009 fJdlsd - punoaE) 3dS-OOS fidaid - elS mUe9 3dS-009 fldaJd -}}aul 3dS-009 Gdaid - punoaE L 3dS-005 Gdlsd - 2id31, 009 SM 3dS-009 pdaJd bb' d2i 3.l 009 SM pua6a-1 L09b Sbb60 L Sbb60 L = Sb £ba = yoea�:{ �ao=� w13 = aan2i ddS-009 [adaad iZ ddS-005 [adlsd 4 '.Ueld 966 � AeW ZZ - ApnjS Al!uial aaddn (ll) uoilels 0009 0009 OOOb 000£ OOOZ 000L 9Zti F 0£ti 9fiti m co 017t7 o� 73 9bb Y r -- ddS-009 (Jdlsd - elS �Ue9 • ddS-009 Pdisd -haul �05b ddS-009 polsd - punoaE) ddS-009 GdOJd - elS �U89 • ddS-009 [JdOJd haul _ -T. ---- 994 ddS-009 fldaJd - punojE) ddS-009 Pdisd 2:IVE A 009 SM 7ddS-009 ��da�d - 2i`o'3.l 009 SM 09ti pua6 496LO L b96LO L = S2J £la = yoea�j > job wI3 = Jani�j ddS-009 [adaad (Z -�dS-009 fJdlsd 4 :veld 9661- Aen ZZ - ApnjS Al!uul aaddn (l;) uollelS OOOL 0009 0009 00017 000£ OOOZ 000 L 0 OZ17 0£17 m m -01717 �' 0 -- 3dS-008 fadlsd elS �UBO I e 3dS-008 fJdlsd - .4aul 0817 3dS-008 fadlsd - punojE) a 3dS-008 Gdaad - elS V89 w 3dS -005 pdald -}}aul 3dS-008 fadaJd - punoaE) 3dS-008 fadlsd - 8V31k 009 SM 3dS-008 ?dp 3,l 008 SM - -- a6a3 -0917 L9990L L8990L = Sb £la = 4oeab �Jo.J w13 = wanly ddS-009 [adaJd (Z ddS-009 fadlsd 4 :Ueld 8661 AeW ZZ - ApnjS Appi aaddn 0006 0008 OOOL 0009 3dS-009 fJdlsd - elS MUeB • ddS-009 Pdisd - JPUI 3dS-009 Gdlsd - punaaE) 3dS-009 Pdald - elS MUe9 • 3dS -009 GdaJd - gain 3dS-009 !IdaJd - punaE 3dS-009 fadlsd - 2JV3), 009 SM 3dS-009 fidaid_8V3A 009 SM puaBal M uoilelS 0009 0004 000£ OOOZ 0006 -- _ - - 064 9£6906 9£6906 =S8 £la = yoeab NJo-� W13 = wanly JdS-005 [adaad (Z JdS-005 (adlSd 4 :ueld 866 AaW ZZ - ApnjS Al!ulal jaddn )Z4 0£4 044 094 094 m m v o' OOOOI 0008 ddS-009 Gdlsd - elS MUe9 • 3dS-009 fJdlsd - JJaUI 3dS-009 fidlsd - punojE) t 3dS-009 fJdaJd - elS � ueB • ddS-009 Gda'd - punaE) 3dS-009 fadlsd - bd3A 009 SA ddS-009 fadaJd - 2:IV3.l 009 SM puaBa-j 00 uoilelS 0009 OOOb OOOZ 0 - 1 " 9617 LMOL9M. = S2J £ ;a = yoea�:l �ao3 W13 = Jan2i ddS-009 fadaJd (Z ddS-009 [adlSd 4 .ueld 966 L AeW ZZ - ApnlS Allulal jaddn -OZ17 9Z17 -0£17 M cu 9£17 o• -Obb MM 0917 9917 8 Upper Trinity Study - 22 May 1998 Plan: 1) PstPrj 500 -SPF 2) PrePrj 500 -SPF River = Elm Fork Reach = ef3 RS = 102686 102686 460- Legend WS 500 YEAR - PrePrj 500 -SPF WS 500 YEAR :PstPrj 500 -SPF Ground - PrePrj 500 -SPF • Bank Sta - PrePrj 500 -SPF Ground - PstPrj 500 -SPF 450 Ineff - PstPrj 500 -SPF Bank Sta - PstPrj 500 -SPF 440 - � I c 0 a� w 430 420 410 0 2000 4000 - 6000 -- — 00 80 T - -r 10000 12000 Station (ft) Upper Trinity Study - 22 May 1998 Plan: 1) PstPrj 500 -SPF 2) PrePrj 500 -SPF River = Elm Fork Reach = ef3 RS = 101428 101428 470 Legend WS 500 YEAR - PrePrj 500 -SPF WS 500 YEAR - PstPrj 500 -SPF Ground - PrePrj 500 -SPF • Bank Sta - PrePrj 500 -SPF 460' - PstPrj 500 -SPF Ground - PstPrj 500 -SPF t Ineff - PstPrj 500 -SPF Bank Sta - PstPrj 500 -SPF 450 — - - - -- - --- -------- ._. 4 C 440 w 430 420 410 -------- - 0 2000 4000 6000 8000 10000 12000 Station (ft) Upper Trinity Study - 22 May 1998 Plan: 1) PstPrj 500 -SPF 2) PrePrj 500 -SPF River = Elm Fork Reach = ef3 RS = 99708 99708 460 -, Legend WS 500 YEAR PrePrj 500 -SPF WS 500 YEAR - PstPrj 500 -SPF Ground - PrePrj 500 -SPF • Bank Sta - PrePrj 500 -SPF - PstPrj 500 -SPF 450] Ground - PstPrj 500 -SPF 1 � Ineff - PstPrj 500 -SPF • Bank Sta - PstPrj 500 -SPF 440 c 0 a� Lu i 430 i I 420 I 410 -- 0 2000 4000 6000 8000 10000 12000 Station (ft) Upper Trinity Study - 22 May 1998 Plan: 1) PstPrj 500 -SPF 2) PrePrj 500 -SPF River = Elm Fork Reach = ef3 RS = 98884 98884 - U/S Of Property 470 Legend - -------- -_--.--_-- _______---------- w____._LL_____. WS 500 YEAR - PrePrj 500 -SPF WS 500 YEAR - PstPrj 500 -SPF Ground - PrePrj 500 -SPF Bank Sta - PrePrj 500 -SPF 460 - PstPrj 500 -SPF ■ Ground - PstPrj 500 -SPF Ineff - PstPrj 500 -SPF Bank Sta - PstPrj 500 -SPF 450 c .0 440 a� w 430 420 - 410 0 2000 4000 6000 8000 10000 12000 14000 Station (ft) N c 0 a> W asif] 450 440- 430 420 Upper Trinity Study - 22 May 1998 Plan: 1) PstPrj 500 -SPF 2) PrePrj 500 -SPF River = Elm Fork Reach = ef3 RS = 97919 97919 - On Property 410 -- - — — I __ 0 2000 4000 6000 8000 10000 Station (ft) Legend WS 500 YEAR - PrePrj 500 -SPF WS 500 YEAR - PstPrj 500 -SPF Ground - PrePrj 500 -SPF Bank Sta - PrePrj 500 -SPF Ground - PstPrj 500 -SPF Ineff- PstPrj 500 -SPF Bank Sta - PstPrj 500 -SPF 12000 c 0 6 a> w Upper Trinity Study - 22 May 1998 Plan: 1) PstPrj 500 -SPF River = Elm Fork Reach = ef3 RS = 97792 460 2) PrePrj 500 -SPF 440 430 420 410 0 2000 4000 6000 8000 10000 Station (ft) Legend WS 500 YEAR - PrePrj 500 -SPF WS 500 YEAR - PstPrj 500 -SPF Ground - PrePrj 500 -SPF • Bank Sta - PrePrj 500 -SPF 12000 Ground - PstPrj 500 -SPF Ineff - PstPrj 500 -SPF • Bank Sta - PstPrj 500 -SPF Upper Trinity Study - 22 May 1998 Plan: 1) PstPrj 500 -SPF 2) PrePrj 500 -SPF River = Elm Fork Reach = ef3 RS = 96997 96997- On Property 460 -, __ Legend WS 500 YEAR . PstPrj 500 -SPF WS 500 YEAR - PrePrj 500 -SPF Ground - PrePrj 500 -SPF Bank Sta - PrePrj 500 -SPF t Ground - PstPrj 500 -SPF 450 —- - -- - - - - -- -- Ineff - PstPrj 500 -SPF Bank Sta - PstPrj 500 -SPF 440 c 0 a� W 430 420 410 0 2000 4000 6000 8000 10000 12000 14000 Station (ft) 455 450 445 CLit, F- c •2 435 m w 430 425 -'. 420 Upper Trinity Study - 22 May 1998 Plan: 1) PstPrj 500 -SPF 2) PrePrj 500 -SPF River = Elm Fork Reach = ef3 RS = 93940 93940- On Property Boundary Legend - ---------- _ __ ___ -__. WS 500 YEAR - PrePrj 500 -SPF ____....._ ......... _ - - -.. , ._.__._.._.___._____.._._ WS 500 YEAR - PstPrj 500 -SPF 415 - - — - -- - - -- - - -- 0 2000 4000 6000 8000 10000 12000 14000 Station (ft) PrePrj 500 -SPF Ground - PrePrj 500 -SPF Bank Sta - PrePrj 500 -SPF - PstPrj 500 -SPF Ground - PstPrj 500 -SPF • Bank Sta - PstPrj 500 -SPF Upper Trinity Study - 22 May 1998 Plan: 1) PstPrj 500 -SPF 2) PrePrj 500 -SPF River = Elm Fork Reach = ef3 RS = 93359 93359 - On the Property 450 F;WS500 Legend � YEAR - PrePr j 500 -SPF WS 500 YEAR - PstPrj 500 -SPF Ground - PrePrj 500 -SPF 445 Bank Sta - PrePrj 500 -SPF Ground - PstPrj 500 -SPF Bank Sta - PstPrj 500 -SPF 440 I I I� 435 0 w 430 425 420 415 - -- �� �- 2000 4000 6000 8000 10000 12000 14000 Station (ft) c 0 .6 w 460 450 j Upper Trinity Study - 22 May 1998 Plan. 1) PstPrj 500 -SPF 2) PrePrj 500 -SPF River = Elm Fork Reach = ef3 RS = 93297 Section 93297 - Upstream bounding cross section for Sandy Lake R ,.o ,\Vi it 430 420 410 -- T -- 2000 4000 6000 8000 Station (ft) Legend WS 500 YEAR - PrePrj 500 -SPF WS 500 YEAR - PstPrj 500 -SPF Ground - PrePrj 500 -SPF Bank Sta - PrePrj 500 -SPF F Ground - PstPrj 500 -SPF Bank Sta - PstPrj 500 -SPF 10000 12000 14000 Upper Trinity Study - 22 May 1998 Plan: 1) PstPrj 500 -SPF 2) PrePrj 500 -SPF River = Elm Fork Reach = ef3 RS = 93254.5 BR Bridge # 17 - Sandy Lake Road 460 Legend WS 500 YEAR - PrePrj 500 -SPF .------ .__.....__� _...__ WS 500 YEAR - PstPrj 500 -SPF - PrePrj 500 -SPF PrePrj 500 -SPF Ground - PrePrj 500 -SPF 450 Bank Sta - PrePrj 500 -SPF PstPrj 500 -SPF PstPrj 500 -SPF Ground - PstPrj 500 -SPF l Bank Sta - PstPrj 500 -SPF 440 c O 6 _N W 430 420 410 T—� 2000 4000 6000 8000 10000 12000 14000 Station (ft) Upper Trinity Study - 22 May 1998 Plan: 1) PstPrj 500 -SPF 2) PrePrj 500 -SPF River = Elm Fork Reach = ef3 RS = 93254.5 BR Bridge # 17 - Sandy Lake Road 460 Legend WS 500 YEAR - PrePrj 500 -SPF _... -_ ----- - -._.. _._._ ..__. WS 500 YEAR PstPrj 500 -SPF PrePrj 500 -SPF PrePrj 500 -SPF Ground - PrePrj 500 -SPF 450 Bank Sta - PrePrj 500 -SPF PstPrj 500 -SPF PstPrj 500 -SPF I ■ Ground - PstPrj 500 -SPF Bank Sta - PstPrj 500 -SPF 440 -- i C O .6 _N W 430 420 410 --r— 2000 4000 6000 8000 10000 12000 14000 Station (ft) Upper Trinity Study - 22 May 1998 Plan: 1) PstPrj 500 -SPF 2) PrePrj 500 -SPF River = Elm Fork Reach = ef3 RS = 93212 Section 93212 - Downstream bounding cross section for Sandy Lake 460 Legend �WS500 YEAR - PrePrj 500 -SPF WS 500 YEAR - PstPrj 500 -SPF Ground - PrePrj 500 -SPF w Bank Sta - PrePrj 500 -SPF Ground - PstPrj 500 -SPF 450 Bank Sta - PstPrj 500 -SPF 440 c 0 Z6 a> W 430 420 410 2000 -- _ _ - _ — _ 4000 6000 8000 —T 10000 12000 14000 Station (ft) Upper Trinity Study - 22 May 1998 Plan: 1) PstPrj 500 -SPF 2) PrePrj 500 -SPF River = Elm Fork Reach = ef3 RS = 93197 93197 460 Legend W i S 500 YEAR - PrePrj 5' 00 PFS WS 500 YEAR - PstPrj 500 -SPF Ground - PrePrj 500 -SPF e Bank Sta - PrePrj 500 -SPF Ground - PstPrj 500 -SPF 450 O Bank Sta - PstPrj 500 -SPF 440 c O cc N W 430 420 410 - -�- —� 0 2000 4000 6000 8000 10000 12000 14000 Station (ft) Upper Trinity Study - 22 May 1998 Plan: 1) PstPrj 500 -SPF 2) PrePrj 500 -SPF River = Elm Fork Reach = ef3 RS = 93196 93196 460 Legend WS 500 YEAR - PrePrj 500 -SPF -- } -..._...-------- --- _..._------ WS 500 YEAR - PstPrj 500 -SPF PrePrj 500 -SPF Ground - PrePrj 500 -SPF 455 Bank Sta - PrePrj 500 -SPF PstPrj 500 -SPF Ground - PstPrj 500 -SPF Bank Sta - PstPrj 500 -SPF 450 c 2 445 a� w 440 435 430 - 0 2000 4000 6000 8000 10000 12000 14000 Station (ft) Upper Trinity Study - 22 May 1998 Plan: 1) PstPrj 500 -SPF 2) PrePrj 500 -SPF River = Elm Fork Reach = ef3 RS = 93191 93191 460 Legend WS 500 YEAR - PrePrj 500 -SPF ----- —._. -_ --- - - - --- ----- - - - - -- -- -- WS 500 YEAR - PstPrj 500 -SPF - PrePrj 500 -SPF Ground - PrePrj 500 -SPF 455 Bank Sta - PrePrj 500 -SPF PstPrj 500 -SPF Ground - PstPrj 500 -SPF Bank Sta - PstPrj 500 -SPF 450 I 445 a� w 440 1 435 430 0 2000 4000 6000 8000 10000 12000 14000 Station (ft) Upper Trinity Study - 22 May 1998 Plan: 1) PstPrj 500 -SPF 2) PrePrj 500 -SPF River = Elm Fork Reach = ef3 RS = 93190 93190 460 �� Legend 500 SPF W' S 500 YEAR - PrePrj - - - -- - - --------- - - -- -- WS 500 YEAR - PstPrj 500 -SPF - PrePrj 500 -SPF Ground - PrePrj 500 -SPF Bank Sta - PrePrj 500 -SPF 450 PstPrj 500 -SPF Ground - PstPrj 500 -SPF -- Bank Sta - PstPrj 500 -SPF I + r • 440 Y c O i6 N W 430 420 410 0 2000 4000 T-TT 6000 8000 10000 12000 14000 Station (ft) Appendix D CDC Application Forms CDC Tracking Code: CDC APPLICATION - PART I To be completed by Applicant: or Applicant's representative and submitted to the appropriate local CDC /Floodplain Administrator. Attach additional pages as necessary. This application is considered public information and will be distributed to federal, state, and local governmental agencies as outlined in the CDC Manual. I. APPLICANT INFORMATION Applicant's Representative. Identify person knowledgeable of and authorized to respond to questions concerning data provided by the Applicant. Name: Jacob S. Lesue. P.E. , CFM Relationship to Applicant: ve Address: O'Brien Engineering Inc. 14900 Landmark Blvd. , Ste. 530, Dallas, Texas 75254 Telephone_ 972- 233 -2288 Fax: 972 - 233 -2818 E -mail: jlesue @OBrienEng.com CDC Applicant: Jacob S. Lesue, AE. , CFM Project Name_ Blackberry Farms Property Owner: The Holmes Builders City /County: Coppell, Dallas County, Texas Engineer: Jacob S. Lesue, AE., CFM Project Size (total acres): proximately 54.65 acres Corridor Development Certificate Manual 4`h Edition Pap,e 1 of CDC Tracking Code: 2. LOCATION ', Provide general description of location, including street address, nearest cross street, and identified impacted water bodies: North of Sandy Lake Road, west of the Elm Fork of the Trinity River (Elm Fork), and approximately 2000 feet east of MacArthur Boulevard in Coppell, Texas. Denton Creek cuts through the subject tract and drains into Elm Fork approximately 5,400 feet downstream. MAPSCO and Location Reference: Map 1B Latitude/longitude of project centroid (to six decimal places). Can be found using DFWmaps.com: 96° 57- 20.26" W, 32° 58'16.09- N NAD 1983 Project boundary in digital format (if available) 3. PROPOSED PROJECT Proposed Activity: (check appropriate categories) ❑ dredge /channel modification X swale construction X fill ❑ levee ❑ bridge /river crossing _ ❑ other (include explanation :here) Proposed Use: (check appropriate categories) ❑ private single dwelling(s) X private multi- dwelling(s) ❑ public ❑ commercial ❑ industrial ❑ other (include explanation here) Brief description of project: This portion of the project involves adding fill in low -lying areas inside the regulatory 1% Annual Chance (AC) floodplairt in owner's property north of the Sandy Lake Road and west of Corridor Development Certificate Manual 4`h Edition Pave 2 of 8 CDC Tracking Code: the Elm Fork of the Trinity ][liver. The majority of the property is located inside the 1% AC ineffective flow area and completely outside the SPF ineffective flow area. The placement of fill will prepare the property for a residential development. Loss in valley storage due to floodplain fill will be compensated with two excavated ponds. 4. PROJECT LOCATION WITH RESPECT TO INEFFECTIVE FLOW AREA X Not located entirely within an ineffective flow area ❑ Located entirely within both the 100 -year and the SPF ineffective flow area ❑ Located entirely within the 100 -year ineffective flow area only 5. VERSION OF HEC -RAS USED IN THE ANALYSIS: 4.1.0 6. EXEMPTIONS AND VARIANCES Exemption Category: (check if applicable - additional documentation may be required) ❑ Maintenance, repair, or identical replacement of existing infrastructure ❑ Outfall structures where the outfall has been permitted under the Federal NPDES or State TPDES program ❑ Intake structures ❑ Discharge of material for backfill or bedding for utility lines, providedAat no significant change occurs in pre - existing bottom contours and excess material is removed to a disposal area out of the Regulatory Zone ❑ Bank stabilization activities provided that no significant change occurs in pre - existing bottom contours and excess material is removed to a disposal area out of the Regulatory Zone ❑ Small-scale projects that cause minimal change in ground surface elevation and no decrease in hydraulic conveyance and valley storage for the 100 -year flood • Temporary construction - related activity • Specific Prior Development - The existing development projects as defined in Section 1.7 DEFINITIONS AND ACRONYMS of this Manual and listed in Appendix B.3 (also referred to as Grandfathered Projects). Applicant requests a Variance to Common Permit Criteria: ❑ Yes X No (If yes, please explain supporting information here) Corridor Development Certificate Manual 4`h Edition Pave 3 of 8 CDC Tracking Code: CDC APPLICATION - PART 2 Detailed Hydrologic and Hydraulic Information To be completed by Applicant or Applicant's representative and submitted to the appropriate local CDC /Floodplain Administrator. Attach additional pages as necessary. This application is considered public information and will be distributed to federal, state, and local governmental agencies as outlined in the CDC Manual. 100 -YEAR FLOOD Parameter Location Pre - Project With- Project Change Downstream Boundary (DB) Discharge 51500 cfs 51500 cfs 0 cfs cross - section 913940 Upstream Boundary (UB) 49600 cfs 49600 cfs 0 cfs cross- section 97919 Channel Downstream Boundary Velocity cross - section 93940 7.68 fps 7.68 fps 0 fps Upstream Boundary 2.78 fps 2.86 fps 0.08 fps cross- section 97919 Water Surface 643 feet downstream of DB Elevation cross- section 93297 444.49 ft 444.49 ft 0.00 ft (NGVD) 581 feet downstream of DB 444.76 ft 444.76 ft 0.00 ft cross - section 93359 Downstream Boundary 445.81 ft 445.81 ft 0.00 ft cross - section 93940 Corridor Development Certificate Manual 4`h Edition Page 4 of 8 CDC Tracking Code: Corridor Development Certificate Manual 4`h Edition Pave .5 of 8 Mid- project 447.92 ft 447.92 ft 0.00 ft cross- section 96997 Upstream Boundary 448.26 ft 448.26 ft 0.00 ft cross - section 97919 965 feet upstream of DB 448.44 ft 448.44 ft 0.00 ft cross - section 98884 1789 feet upstream of UB cross- 448.58 ft 448.58 ft 0.00 ft section 99708 3509 feet upstream of UB cross - 448.70 ft 448.70 ft 0.00 ft section 101428 4767 feet upstream of UB 448.78 ft _ 448.78 ft 0.00 ft cross- section 102686 Project Lands in 44.02 ac 23.91 ac -20.11 ac Floodplain Valley Storage on Project 160.0 ac -ft 160.0 ac -ft 0.0 ac -ft Lands Total Valley Storage 0.0 ac -ft Change Valley Storage Percent 0.0 Change Corridor Development Certificate Manual 4`h Edition Pave .5 of 8 Parameter I Location 0.18 fps Discharge Downstream Boundary (DB) cross - section 93940 449.52 ft Upstream Boundary (UB) 0.00 ft cross - section 97919 449.62 ft Channel Downstream Boundary Velocity cross - section 93940 Upstream Boundary cross - section 97919 Water Surface 643 feet downstream of DB Elevation cross - section 93297 (NGVD) 581 feet downstream of DB cross - section 93359 Downstream Boundary cross - section 93940 Mid - project cross - section 96997 Upstream Boundary cross - section 97919 965 feet upstream of DB cross - section 98884 CDC Tracking Code: _ 1 NLUUll S-P Pre - Project With- Project Change 99200 cfs 99200 n/a 0 cfs 92700 cfs 1 92700 n/a 1 0 cfs 3.33 fps I 3.33 fps I 0.00 fps 2.97 fps 3.15 fps 0.18 fps 449.52 ft 449.52 ft i 0.00 ft 449.62 ft 449.62 ft 0.00 ft 449.76 ft 1 449.76 ft I 0.00 ft 450.21 ft 450.21 ft 0.00 ft 450.44 ft 450.43 ft -0.01 ft 450.63 ft 1 450.62 ft 1 -0.01 ft Corridor Development Certificate Manual fh Edition Pave 6 of 8 CDC Tracking Code: 7. VALLEY STORAGE MITIGATION Valley storage for the proposed site was calculated using ArcGIS 9.2 by generating digital surfaces of the existing topography, the proposed topography, and the floodwater surface elevations. A comparison of each surface was used to determine, the valley storage implications of the proposed site. Floodplain fill for the project site encompasses the majority of the site in areas designated as sub - divided residential lots and streets. Compensation for this loss in valley storage has been provided by two excavated ponds located on the east side of the subject property. Corridor Development Certificate Manual 4`h Edition Paae 7 of 8 CDC Tracking Code: Application is hereby submitted for a Corridor Development Certificate (CDC). I certify that I am knowledgeable of the information contained in this application, and that to the best of my knowledge and belief, this information is true, complete, and accurate. Signature of CDC Applicant or Applicant's Representative Jacob S. Lesue, P.E., CFM - Proiect Manager, November 8, 2012 Typed Name/Title/Date OF -1 rt JACOB LESLIE a 100352 w P.E. license Number and seal/stalnp i Corridor Development Certificate Manual 4th Edition Pap,e 8 of 8 � Appendix E igital Copies of Hydraulic Model Data