Blackberry Farm-SY121108 (2)Request for Conditional Letter of Map Revision
on Elm Fork of the Trinity River
for The Holmes Builders
W;;P.'(E F•TF.�'jttt
9 :,..100352
o�
�Zt SS�ONAI•EN��ti
City of Coppell
Dallas County, Texas
by:
O'Brien Engineering, Inc.
14900 Landmark, Suite 530
Dallas, Texas 75254
Ph: 972 - 233 -2288
Fax: 972 - 233 -2818
November 8, 2012
U
L
W
L
Im
W%
O
U
h
■
■
W
L
n
rU
Table of Contents
I. Introduction ......................................................:.......................... ..............................1
II. Objectives of This Study ............................................................. ..............................1
III. Hydrologic Analysis ..................................................................... ..............................1
IV. Hydraulic Analysis ....................................................................... ..............................2
A. Methodology ........................................................................ ............................... 2
B. Corrected Effective Model .................................................... ..............................3
C. Pre - Project Model ................................................................. ..............................3
D. Post - Project Model ............................................................... ..............................4
E. Floodway Model .................................................................. ............................... 4
V. Results & Conclusions ............................................................... ............................... 4
Tables
Table 1 Comparison of FIS 1 % AC Water Surface Elevations ......... ............................... 6
Appendices
Appendix A — Exhibits x.10$0- tttkt
Exhibit 1 — Effective FIRM ��fE•rF;lq tt�
Exhibit 2 — Cross Section Location and Floodplain Map ,r*
Exhibit 3 —Site Map * .::.......................::.'
Exhibit 4 — Revised FIRM r JACOB LESU�
Exhibit 5 — Proposed Site Grading Plan ....
S:.. 100352 �Q
Appendix B — Hydraulic Model Summary Output °si0N
Duplicate Effective Model ^
Corrected Effective Model
Post - Project Model l� /Z
Appendix C — Floodway Model Summary Output
Duplicate Effective Model
Corrected Effective Model
Post - Project Model
Appendix D — FEMA Certifications
Appendix E — Digital Copies of Model and Support Data
I. Introduction
O'Brien Engineering, Inc. (OEI) is under contract with The Holmes Builders (Owner) to
prepare a request for Conditional Letter of Map Revision ( CLOMR) from the Federal
Emergency Management Agency (FEMA) for the development of a 54.6 -acre tract in
Coppell and Carrollton, Texas. The subject tract is located north of Sandy Lake Road,
west of the Elm Fork of the Trinity River (Elm Fork), and approximately 2000 feet east of
MacArthur Boulevard.
According to the effective Flood Insurance Rate Map (FIRM) for Dallas County (map
panel no. 48113CO155 J, dated August 23, 2001), the subject tract is partially
encumbered by the 1 percent annual chance (1 % AC) floodplain (Zone AE) of Elm Fork,
while the remainder of the tract is encumbered by the 0.2 percent annual chance (0.2%
AC) floodplain (Shaded Zone X) of Elm Fork. A copy of the effective FIRM is contained
in Appendix A, Exhibit 1.
Denton Creek flows through the subject tract and drains into Elm Fork approximately
5,400 feet downstream. Based on the FEMA Flood Insurance Study (FIS), the Denton
Creek 1% AC flood profile through the subject tract is dominated by Elm Fork 1% AC
flood profile approximately 8,000 feet upstream of Denton Creek's confluence with Elm
Fork. Denton Creek FEMA models were not available downstream of the point where
the flood profile is controlled by Elm Fork.
II. Objectives of This Study
The primary objectives of this study are to evaluate the floodplain hydraulics of Elm Fork
in the vicinity of the project site for the purpose of reclaiming floodplain and to provide
the basis for a request for CLOMR from FEMA.
III. Hydrologic Analysis
No hydrology was developed for this project. The FEMA models used in this study use
the Flood Insurance Study (FIS) peak flood flow rates for Elm Fork.
1
IV.. Hydraulic Analysis
The FEMA model for Elm Fork was requested and obtained from FEMA's library
archive. The data obtained is in HEC -RAS format. The model was input into OEI's
database and executed to verify data integrity. Upon review of the model, it was
determined that the majority of the proposed development lies within the 1% AC
ineffective flow area for Elm Fork.
A. Methodology
The floodplain and channel topography for the subject area were obtained from on-
the- ground field data surveyed by Kadleck & Associates mapped to one -foot
contour interval topography. The topography for limited portions of the floodplain
outside of the project site was augmented with the North Central Texas Council of
Governments (NCTCOG) 2007 aerial photography mapped to 2 -foot contour
intervals. The topography for portions of the Denton Creek channel was augmented
with topography developed for the Trinity River Corridor Mapping from a 1991 aerial
survey mapped to 2 -foot contour intervals. The hydraulic analysis was conducted
using the U.S. Army Corps of Engineers (USACE) water surface profiles computer
program, HEC -RAS (version 4.0). In addition, the hydraulic model for Elm Fork has
two sets of geometry , data based on high frequency flood flow rates, consisting of
the 10% to 1 % AC floods and low frequency flood flow rates consisting of the 0.2 %
AC flood. Channel and overbank reach lengths were digitally measured using
ESRI's ArcView software. Manning's roughness coefficients were verified through
field reconnaissance with reference to "Guide for Selecting Manning's Roughness
Coefficients for Natural Channels and Flood Plains Water - Supply Paper 2339," by
the United States Geological Survey, 1989 and Ven Te Chow, "Open - Channel
Hydraulics ".
2
B. Corrected Effective Model
The Effective model was used as a platform for establishing the Corrected Effective
model through the project area. The Corrected Effective model in the present study
for Elm Fork was established by adding one cross section (97792) in the project
vicinity and moving cross section 97178 approximately 180 feet downstream to river
station 96997. The profiles of these two sections and section 97919 were updated
with the topography data described in the methodology section of this report.
Contraction and expansion coefficients used in the model are 0.1 and 0.3
respectively for normal floodplain conditions and 0.3 and 0.5 respectively near
constrictions. Downstream reach lengths were updated based on the location of the
new cross sections. IManning's roughness coefficients were entered into the model
on the new sections using the horizontal variation method, consistent with the
effective model. Ineffective flow limits based on contraction of flow due to
encroachment of the Sandy Lake Road bridge were maintained based on-the
United State Army Corps of Engineers (USACE) workmap produced for the
effective models and mapping. The model cross section locations are illustrated on
Exhibits 2 and 3, "Cross Section Location and Floodplain Map" and "Site Map"
found in Appendix A.
C. Pre- Project Model
The purpose of the Pre-Project model is to simulate any modifications that have
occurred within the floodplain since the date of the Effective Model. The Pre - Project
model is typically developed using the Corrected Effective model as a platform and,
therefore, includes corrections and updated topography. For this study, the Pre -
Project model of Elm Fork is identical to the Corrected Effective model as there
were no modifications in the project vicinity, since the development of the Effective
modeling. Therefore, no separate Pre - Project model of Elm Fork is included herein.
D. Post - Project Model
The Corrected Effective model was used as a platform to develop the Post - Project
model. The Post - Project model of Elm Fork represents floodplain modifications,
which would result from the proposed development, which includes placement of fill
in the right overbank due to the proposed development. The proposed floodplain
modifications begin near cross section number 97919 and continue through cross
section 96997. Excavation of a pond is proposed on a portion of the subject tract
near cross sections 97919 and 97792. Manning's roughness values were adjusted
on cross sections 97919 through 96997 to represent proposed site conditions.
Roughness coefficients used in the remainder of the model are identical to those in
the Pre - Project model. A copy of the proposed site grading plan is contained in
Appendix A, Exhibit 5.
E. Floodway Model
The Effective floodway model from FEMA was available for Elm Fork and obtained
from FEMA's library , archive. The floodway encroachment stations from the
Effective model are also used in the Corrected Effective model. For cross sections
added to the Corrected Effective model, floodway encroachment stations were
determined by scaling the floodway top widths on the Effective FIRM panel.
V. Results & Conclusions
A summary tabulation of water surface elevations and velocities for various conditions is
contained in Table 1 below. A hydraulic summary output for each condition is contained
in Appendix B and C. The revised FIRM is contained in Appendix A, Exhibit 4, and the
FEMA certifications are included in Appendix D. Digital copies of the hydraulic
modeling data are contained in Appendix E.
The results indicate that the proposed project would not result in any increases in the
1% AC flood water surface elevations nor create erosive velocities or cause increases
in erosive velocities.
0
We therefore ask that the City of Coppell approve this study and submit to FEMA in
support of a request for a Conditional Letter of Map Revision.
5
Table 1
Comparison of FIS 1 %AC Flood Water Surface Elevations
Location
Cross
Section
Duplicate Effective
Corrected Effective
Post- Project
Difference
Natural
MAC
WSEL
Encroached
MAC
/o
WSEL
Surcharge
Natural
MAC
WSEL
Encroached
1 AC
MAC
WSEL
Surcharge
Natural
MAC
WSEL
Encroached
1 /o AC
WSEL
Surcharge
Post - Project -
Pre - Project
ft
ft
ft
ft
ft
ft
ft
ft
ft
ft
Column Number ID
(1)
(2)
(2)-(1)
(3)
(4)
(4)-(3)
(5)
(6)
(6)-(5)
(5)-(3)
110074
449.83
449.91
0.08
449.83
449.87
0.04
449.83
449.88
0.05
0.00
1 n9445
440,45
44Q.54
n nca
44Q.44
44Q.50
n06
448,44
44a,5n
o_06
non
107964
449.26
449.36
0.10
449.25
449.31
0.06
449.25
449.31
0.06
0.00
106657
448.98
449.09
0.11
448.97
449.04
0.07
448.97
449.04
0.07
0.00
105936
448.78
448.90
0.12
448.77
448.84
0.07
448.77
448.84
0.07
0.00
105167
448.44
448.58
0.14
448.43
448.50
0.07
448.43
448.51
0.08
0.00
102686
448.03
448.19
0.16
448.01
448.09
0.08
448.01
448.10
0.09
0.00
101428
447.95
448.10
0.15
447.92
448.00
0.08
447.92
448.01
0.09
0.00
99708
447.81
447.98
0.17
447.78
447.87
0.09
447.78
447.87
0.09
0.00
Upstream Tie -in Limit
98884
447.66
447.84
0.18
447.63
447.73
0.10
447.63
447.73
0.10
0.00
Upstream Limit of Project
97919
447.44
447.62
0.18
447.42
447.44
0.02
447.42
447.44
0.02
0.00
97792
-
-
-
447.38
447.42
0.04
447.38
447.41
0.03
0.00
97178
447.07
447.22
0.15
-
-
-
-
-
-
-
96997
-
-
-
447.02
447.07
0.05
447.02
447.07
0.05
0.00
Downstream Limit of Project
93940
444.66
444.78
0.12
444.66
444.78
0.12
444.66
444.78
0.12
0.00
93359
443.66
443.86
0.20
443.66
443.86
0.20
443.66
443.86
0.20
0.00
Upstream Sandy Lake Rd
93297
443.47
443.68
0.21
443.47
1 443.68
0.21
443.47
443.68
0.21
0.00
Downstream Sandy Lake Rd
93212
443.46
443.67
0.21
443.46
443.67
0.21
443.46
443.67
0.21
0.00
93197
443.49
443.70
0.21
443.49
443.70
0.21
443.49
443.70
0.21
0.00
93196
442.28
442.73
0.45
442.28
442.73
1 0.45
442.28
442.73
0.45
0.00
93191
442.25
442.71
0.46
442.25
442.71
1 0.46
1 442.25
1 442.71
0.46
0.00
I
4K ZONE X
a
w
PHILLIPS DRIVE RA,
C'
0
a
W
J
0
co
L
m
PARKWAY
OF COPPELL
480170 w
ONE X a
0
0
W
Denton Creek
ZONE X'
BRACEB
DRP
CHESHIRE
VILLAGE
PARKWA`
8001 �v PRD
ZONE AE
V
--J'
ZONE
ZONE X
X
ONE
ZONE X
. ZONE \
X
ZONE X
CREEK
°so - -3
APPROXIMATE SCALE IN FEET
1000 0 1000
NATIONAL FLOOD INSURANCE PROGRAM
FIRM
FLOOD INSURANCE RATE MAP
nA T ,T . A q P.nT TNTV
TEXAS ANDv+, y y,
INCORPORATED AREAS
PANEL 155 OF 125
(SEE MAP INDEX FOR PANELS NOT PRINTED)
CONTAINS:
COMMUNITY NUMBER PANEL SUFFIX
CARROLLTON. CITY OF 460167 0155 J
COPPELL, CITY OF 480170 0155 J
DALLAS, CITY OF 480M 0155 J
IRVING. CITY OF 480180 0155 J
s
w
z
a
Z
0
MAP NUMBER
48113CO155 1
EFFECTIVE DATE:
AUGUST 23, 2001
t yH
5 �Q
0 0
Federal Emergency Management Agency
This is an official copy of a portion of the above referenced flood map. It
was extracted using F -MIT On -Line. This map does not reflect changes
or amendments which may have been made subsequent to the date on the
title block. For the latest product information about National Flood Insurance
Program flood maps check the FEMA Flood Map Store at www.msc.fema.gov
Brentw od /r /v- / �! / r t6g6
eau'
la
Chalfont
/ m
i
�y \
01
\e
99708
4�)
Creek
Roun ck Jac •` �
kson
M rivers Gibbs 98884
'
/! ; .. ? / / /. / i / , _ /1 \
n Basltwood,
a
A� ForestwAOd / r
COD; 00
o iota f a ;l : / / / �� i/ ,� / / ; / / 97919
hti �a es�wtYia h / / / / / / / / / / / /` / i" / / ' / / :/ .! i / / / / / t 97792 i
onC�g _ s
/
� Pintail
Fountain
m Hea �' 1 -- 0 � � � / � � 96997
93940 �
`� 3349`
9 _.-
Sugarberry .! / '. / _.—Q. 191 93141 a
;�
92351 E
LL
v / /
. B , tb
J Sandy Lake Rd \! i /r / .q N
Colonial AL
81530
reek 0 500 1.000 m , Feet ,' / c
TI—
lade s G Point p532 `a
LEGEND
Gga�m
Cross Section ` wa ! F
Bradf rd o� o. /' :!r //�
Proposed Lot Layout I Pebble Creek
0 Proposed Pond 89694
® Limit of Effective Flow (high flows)
Limit of Effective Flow (low flows) �� v v / ! / / ! EXHIBIT 2
-.
stream _centerline _ elm _fork :iEngineering, Inc.
Intermediate Contour < Bt /tmOfeO // 14900 Landmark 131W, Suite530 Dallas,Texas 75254
p- 972233.2288 f 972233.2818 w .OBrienEng.c°m
\ — eStC Pin Uf5 t m
/ l . Texas Registered Engineering Firm F -3758
Index Contour
ster // / /
FEMA Flood Hazard Zones (2001) try l � �, ' ,/ THE HOLMES BUILDERS
�,.
° Sorel 9r° ) CROSS SECTION LOCATION AND
Floodwa � am Cuttingh m r/ , ' .!` —
y //� / ?� � � �� L DPLAIN MAP
1 \ F 00
0 X500 (0.2% AC) i = / / / !'/ // i ' / /� T/ /' _ DALLAS COUNTY, TEXAS
DATE: 6/23/2012 OEI JOB #: 347.002
MFM� �-. �
C
t�
X J:
}t\ A
GLEN
LAKES ZONE X - ���.ti. Old Denton. Creek N .
f
Z
APPROXIMA E SCALE IN BEET
w m i " OOC 0 ?G00
r i
r,
ZONE X x - - - -- - --
3 V
y 1 S
RAIN TREE BRACEaRIDGE
C!RCL
DRIVE
C.'HESHRE
NATIONAL FLOOD INSURANCE PROGRAM
'ZONE }
a
r
w REVISED
p
FIRM
r
FLOOD INSURANCE RATE MAP
0
X
.� 3�zr
ZONE r 4 DALLAS COUNTY,
vi�LAGE
` TEXAS AND
PARK01— v y ,; INC i�RPi�RATED AREAS
ZONE X
a � Area of Revision
PARK'tNAY 50 U`LVRRD
PANEL 155 OF 725
easr_wooD ° � � * c�+'
(SEE MAP 'NDEX FUR PANELS NOT PRINTEDi
ZONE AE
,�t' CONTAINS.
10h1MLY ?Y' DUMB � PAAEL SjFF :X
ZA
Zone AE
OF COPPELL f .
rti ,.ta ��' :;AHROuLTG ,.C; TY OF au.F 1,5 J
-,PPF r OF '!K'70 3155
480170 l -
� � -.t� i � � AIDS � �F 48Gni 6^55 ..
��— — — Zone X� k14 �`' b!vv r .- aacteo 6,;
ONE X
ZONE X�,
. ; a MAP NUMBER
48113CO155 1
ZONE
�
lip EFFECTIVE DATE:
tan
ZONE X ZONE X -.: AUGUST 23, 2001
4
CITY OF DAI,i.AS _
480171 ^'
ZONE
\ X ^ti< <S ROAD
"
K
'`` Federal Emergency Management Agency
��.
\ ZONE X PEES E CREEK
This is an official copy of a portion of the above referenced flood map. It
was extracted using F -MIT On -Line. This map does not reflect changes
or amendments which may have been made subsequent to the date on the
ZONE AE-- G� ST KhUGSwiI.'�` P ai • r rs "t' S title block. For the latest product information about National Flood Insurance
1 STONE _L CT �' a Program flood maps check the FEMA Flood Map Store at www. msc.fema.gov
A
SCALE:
1'-40'
0 20
40 a0
LEGEND_
nR
F—d I- %d
CA
C— A-
FF
Flnleh Floor
Tc
Top of Oorb
TP
Top of Pa—wit
a
Gutte,
TW
Top of won
BW
Btt— of Wall
+459.0
Fdtng ElInation
--450--
EWOJN Centaur
WM
Propond ElmUm
Proposed Cmtour
MATCH LINE — SEE SHEET 2
7
Eah
I r 5
PROP. 10
NNNGGGIII 6 f ZaEE
RETAINI W I
7
38
LAKEWOOD ESTATES 1 X
Vol .17.aP 602 IFP51.7
VR TV 49LO
z
0
TIV 5 12
III 1 i 3
39
IV 4 4
\1 2 1 1 14
TW 50.0
7=0
FFN175
Ld
Ld
M
TIF
BW 4W 5a7 U)
LL1
II Ld
5
2
31
KIMBLE COURT ADDITION Eau
Vol. 77213. P T?. 999
LIJ
Ts, 5ae 4 z
W 48L -D
VF5a
PROPOSED
RETAINING W 0"'
PROP. 5'
EASEMENf— VF50.
2
IFP49,
ix
B
BLOCK C LOCK C
PROPOSED
EMERGENCY
4 ACCESS
Fir 5ao TW 50.0
— ----- . . ....
CITY OF COP
TP&L EASEMENT
- --------- / P�
------ . ........
T ..................
SSMH
ix
Zl- PROP. 5' WALL
.b7 BLOCK C EASEMENT
)AVID V.—RS SIRWY APSMACi NO, 886
Ij
CITY BM'J104 I I \.%\ I i
Wv
Square Cut an concrete sidewalk an bridge crowing a
dralp:: ,age channel an the south side of Sandy Lake Road
125 ew, we t of and 51'3 south of the Intersection
of Sandy Lake Road and Kimbel Kourt. THIS DOCUMENT IS RELEASED
Elevation 449.38 FOR THE PURPOSE OF INTERIM
TBMIM
REVIEW UNDER THE AUTHORITY
Square Cut an top of curb at median now In centerline OF L Lynn Kadleck, P.E. 47258
Sandy Lake Rood, west side of entrance to project, Date: Aug., 20 1 12
approximately 1100 fact met of Klmbel Kourt.
Elevation 449.25
PREPARED BY
TBMJZ KADLECK & ASSOCIATES
Top of a found 1/2 Inch Iran rod at the northeast 94WEEFAM PLAWM SURVENSIC
comer of the subject property. Elevation 444.80 A t9=72)W CENTRAL EX�AY SUITE 113
M GM 7`C`4
TBPE R,, " F-6450/RIPLS Reg. N& 100555-�a0
A
SCALE: 1*-40'
0— 20 40 so
LEGEND
FIR Found h- Rod
CA C—. A-
FF Finish Fl—
M Top of Curb
TP Top of Pownent
0 Gutty
7W Top of Wd
BIN Bottom of W.11
+452.0 Edwtng Elvwtlon
I\`\ \ PROPOSED RETAINING W�
23
CITY OF COPPELL
LAKEWOOD ESTATES 24
\\ X LOCK D
Val. G�R5.7.Cq. 602
IFP50.61
4
X\
f
2
25
f
--460-- Eldting Ct-
._RU 0
c-t— 26 Tw so WF \�
00001M.M.
k
V-
5ai ry
27 415 14 15
1x
/BLOCK
28
25
rw 5ao
0
1
29
LAKEWOOD ESTATES
Vol. QD4�57.,P 002 PO
R.D C .19
4R3
0
12 27
LIJ
V)
30
LILI
\\\,R Ld
V)
PROPOSED = 971 1_
RETAINING
Sao
Ld
n r 5W
—J
TIV .6
:Zzz
7w so
32
1w
Sao
10
TW 5a
Bw ".r 100
4&0 0
33
22
H
446 Twoao
I IF 21 OR, .?
20
20
34 GR 49
TIV 5a
aw
a,
19
�10
VaU THIS DOCUMENT IS RELEASED
FOR THE PURPOSE OF INTERIM
REVIEW UNDER THE AUTHORITY
35 hL OCK OF L Lynn Kadeck. P.E. 47258
Data Aug., 2012
is
ti
TIV 49.4
PREPARED BY
7
KADLECK & ASSOCIATES
PLAN" suw*mo
ENGINEERM
MATCH LINE -SEE SHEET 1 75074
00555-W
"M "3
pTY BM 1104
Square cut on concrete sidewalk an bridge crowing a
drainage channel on the south side of Sandy Lake Road
125*± feet east of and 51'± south of the intersection
of Sandy Lake Road and Kimbei Kourt.
Elevation 449.38
TBMJl
Square cut on top of curb at median nose In centerline
Sandy Lake Road, west side of entrance to project.
approximately 1100 feet east of Kimbel Kourt.
Elevation 449.25
TBMJ2
Top of a found 1/2 Inch Iran rod at the northeast
corner of the subject property.
Elevation 444.80
PROPOSED RETAINING WALL
7w 4aa jny
_ Bw 457 ,. I BW
8/
FP a
�1
21
FP 1.1
\ 5
\
1 �
N 22
W
i1 w 46.7 y CITY OF CARROLLTON
_ e
LJ e1pM1 ,,pe .1# e att LIMIT tNE OP
7c4d _
/ CITY OF�CWPI'L '
DRAINAGE
7 / / EAR= \ \ \
® _
7
\ i 4A
\ t
I i l
sin
r
1 �
i
i
1
vary - x11"~ e
I' 1'
i
20 J
LIMITS OF STORAGE POND AV v
I 119 A\ \ �-.� DRAINAGE
12 .` ! i i EASEMENT 1
BUCE TRAIL
i I v
W \
Ld
Ld
Ld
® ;
i
I BLOCK F
I
i
® sir/
ma
\ u( BLOCK D
DO
Ifp,
nr 5a6
� ew n.r ,
!y
\- OPOSED
. �; n� I �- .� �� — — — RETAININCyWAvv A �y A,e
n
/ TwSaD
/ 17 \ 4
aw
TW 50.
MATCH LINE - SEE SHEET 4
'o
THIS DOCUMENT IS RELEASED
FOR THE PURPOSE OF INTERIM
REVIEW UNDER THE AUTHORITY
OF L__Lynn Kadled4 P.E. 47258
Date: Aug., 2012
PREPARED BY
KADLECK & ASSOCIATES
w -M 76074
u -11. W&06W
SCALE 1' =40'
0 20 40 so
LEGEND
FIR Fend bon Rod
CA Carman Area
FF Finish Flaon
TC Top of Curb
TP Tap of Palanont
C nutter
Tw Tap of wan
Sw Battam of wall
+459.0 EWtnq Elereaon
490-- Existing Contour
�® Propwed Elevation
Propew Contwr
CITY BM /104
Square cut on concrete sidewalk on bridge crossing a
drainage channel on the south side of Sandy Lake Road
125'± feet met of and 51'± south of the Intersection
of Sandy Lake Road and Kimbell Kourt.
Elevation 449.38
So a cut on top of curb at median now in centerline
Sandy Lake Road, west side of entrance to project,
approximately 1100 feet east of. Kimbell Kourt.
Elevation 449.25
Top a
Top of a found 1/2 Inch Iron rod at the northeast
corner of the Subject property.
Elevation 444.80
SCALE: 1 - =40'
0 20 • ^ 40 .,.. e0
FlR Farad Yon Rod
CA C-7 Area
FF FNbh Float
TC Tap of Curb
TP Top of P—t
G auttar
Tw Tap of Wdl
Bw Rottdn of was
+459.0 Exbh19 Elevation
460— ExWMg Centaur
-- ®. Pn pmW EI—twn
--gg— Pn posed Centaur
W
W
()
W
W
V)
W
Z
J
2
H
Q
� 17
\ 0.4
16 15 II
e- --
FP51. 8 /
r / \
j I \
I
t7 �
/r
/
/
IV G — JGC JI-1 GG 1 J
13
OW If
r12 �•
IFP4,9. �
TV 5ao
I Be
--"._
C�7
9 % /
51. /
PROP. 100 Yr. FLOODPLAIN \
,X
BLOCK F
i
i
UMITS OF STORAGE POND
\
CITY OF COPPELL
\\ CITY L66T 11HE
YN a
r\ \
120' DRAINAGE
W so
j \ \
\ B
COBBLESTO :
CONCRETE/ i! I
III
Of
i. 45.9 Ali' 1 i
i I l
Wwo
(' 4
46.5
a r
V,
i/
\
;,i i
7
I
Allf r Fa
.MN A KS(W S RWY A9S7? SC': 10. 698
W. i'ERR Al RA 4
CITY BM 1104
Square cut on concrete sidewalk on bridge crossing a
23.6 AC. drainage channel on the south side of Sandy Lake Road
CITY OF CARROLLTON 125'± feet east of and 51'± south of the intersection
Vol. 91226, Pgq. 332 of Sandy Lake Road and Kimbel Kourt.
D.R.D.C.T. Elevation 449.38
Square cut on top of curb at median now in centeriine
Sandy Lake Road, west side of entrance to project,
approximately 1100 feet east of Kimbel Kourt.
Elevation 449.25
Top o
Top of a found 1/2 Inch Iron rod at the northeast
corner of the subject property.
Elevation 444.80
THIS DOCUMENT IS RELEASED
FOR THE PURPOSE OF INTERIM
REVIEW UNDER THE AUTHORITY
OF L Lynn Kadleck, P.E. 47258
Date: Aug., 2012
PREPARED BY
KADLECK do ASSOCIATES
E110iNESIB10 PIX9610 swnM 113
��0000DD It t41aRAl EWAi�wAY 50fIE 11J
(Y7Z) 651-07T 75074
1BPE Rp. No. F- 64W/iBPIS Rp. Ro. 100656 -00
THIS DOCUMENT IS RELEASED
FOR THE PURPOSE OF INTERIM
REVIEW UNDER THE AUTHORITY
OF L Lynn Kadleck, P.E. 47258
Date: Aug., 2012
PREPARED BY
KADLECK do ASSOCIATES
E110iNESIB10 PIX9610 swnM 113
��0000DD It t41aRAl EWAi�wAY 50fIE 11J
(Y7Z) 651-07T 75074
1BPE Rp. No. F- 64W/iBPIS Rp. Ro. 100656 -00
0
HEC -R4S Plan: DE 10-100 Locations: User Damned
HEC -RAS Plan: DE 500 Locabons: User Defined Profile: 500 YR
57000.00
422.53
451.76
446.611
452.35
0.001494
7.551
10797.50
1449.071
0.31
57000.00
422.60
451.13
446.54
451.34
,0.000846
4.93
17186.45
2871.22
0.23
57000.00
422.71
450.81
446.01
450.95
0.000367
2.92
26713.39
4233.40
0.15
57000.00
420.20
450.41
446.73
450.54
0.000554
4.78
28547.86
5725.23
0.19
57000.00
418.75
450.11
446.80
450.21
0.000450
4.20
31767.99
5976.57
0.17
57000.00
419.00
449.58
449.73
0.000889
5.88
26036.75
5782.21
0.24
66500.00
419.80
448.94
448.99
0.000173-
- 2.28
37859.96
7122.82
0.11
66500.00
418.90
448.82
448.87
0.000191
2.64
39302.23
8143.73
0.11
66500.00
417.60
448.62
448.67
0.000218
3.04
40076.93
8164.24
0.12
66500.00
416.90
448.41
448.46
0.000252
3.47
42077.27
8061.64
0.14
66500.00
416.20
448.11
448.17
0.000451
3.72
42544.89
9989.31
0.16
66500.00
416.50
447.67
447.77
0.000695
4.81
40383.74
9884.82
0.21
70700.00
417.30
446.48
446.57
0.000454
4.56
44979.02
10281.97
0.18
70700.00
417.50
446.11
446.26
0.000581
5.03
29645.90
6935.40
0.20
70700.00
417.50
445.60
442.20
446.18
0.000617
9.33
16723.46
4806.93
0.35
Bridge
70700.00
417.50
445.62
446.03
0.001190
7.78
16846.26
4831.311
0.29
70700.00
417.50
445.74
445.97
0.000816
6.03
23505.53
6334.471
0.24
70700.00
433.70
445.45
445.94
0.000932
10.95
19735.18
6000.011
0.58
70700.00
433.70
445.44
445.94
0.000935
10.97
19699.68
5994.98
0.58
Upper Trinity Study - 22 May 1998
Plan: DE - 10, 50, and 100 -year Plan
11/8/2012
River = Elm Fork
Reach = ef3 RS =125658 125658
<--- .03 . �?0
.055
470
0
Legend
7
WS 100 YR
Ground
Ineff
Bank Sta
460
450
c
0
a>
W
440
430
420
1000
2000 3000
4000 5000
6000 7000
Station (ft)
Upper Trinity Study - 22 May 1998 Plan: DE - 10, 50, and 100 -year Plan 11/8/2012
River = Elm Fork Reach = ef3 RS = 110074 110074
.04 'I"1?05�4 P�— .04 301 .05 — .04 .09 .03
460
Legend
WS 100 YR
Ground
Ineff
455
0
Bank Sta
450
445
c
440
?
w
435
430
425
420
2000
3000
4000 5000 6000 7000
8000
Station (ft)
Upper Trinity Study - 22 May 1998 Plan: DE - 10, 50, and 100 -year Plan 11/812012
River = Elm Fork Reach = ef3 RS =109445 109445
.04
- � .12 .05 1 .03 - — .12 0 .12 --+O �
460
Legend
2 6
WS 100 YR
Ground
Ineff
455
Bank Sta
450
445
LI
c
440
a�
w
435
i
i
430
425
420
1000
2000 3000 4000 5000
6000
Station (ft)
Upper Trinity Study - 22 May 1998
Plan: DE - 10, 50, and 100 -year Plan 11/8/2012
River = Elm Fork
Reach = ef3 RS = 107964 107964
��-- .05 — .1
� .06
460
.04 .12
Legend
WS 100 YR
■
Ground
InefF
455
•
Bank Sta
450
445
x
c
440
CD
w
435
430
i
425
420
1000 2000 3000
4000 5000
6000
Station (ft)
Upper Trinity Study - 22 May 1998 Plan: DE - 10, 50, and 100 -year Plan 11/8/2012
River = Elm Fork Reach = ef3 RS = 106657 106657
�.os� . �-.12 .os �
460 0
5
450
Legend
WS 100 YR
■
Ground
Ineff
Bank Sta
c
440
a'>
w
430
420
0 10oo 2000 3000 4000 5000 6000 7000
Station (ft)
In
J
�
C
m
�
O
O
O
O
O
O
O
co
N
O
N
�
O
o
0
C
N
d
N
�co
Cl)
O rn
O L
0
o
C)
C CD
N m
CO
CT Lo
� .O-
O ��
O
r �
W
M
$
00
N
c
o 0
CU r
L w
cc
U)
N
w
—
—
c
rn 0
rn Lj-
E
N w
°o
u
°v
a�
N
N w
7
U)
C
'L
O
O
M
L-
CD
Q
CL
N
O
O
O LO
T
O
N
w
O
O
O
fO0
L
It M
CD
N O r
( )J) UOIIBA913
In
J
�
C
m
�
O
O
O
O
N O
T- O
N
00
r
C
(C
a
L
co
1+fD O
O
O O
r �
(B cD o
O p co
LO Cl
O It
I �
i
W
y c
C p
� L
N _ _
0) O
LL O
O
II
cu
N
N W
N
>+
7
U)
Y CD U')
'c
H
L
N
CL o
CL O
O
N
O
T� O
Ll7 O LO O If) O O
�t
It V' � V
(4) uogeAO13
�
}o
w
c
c
� fn
rn
°
o
c � �
J
�
m
�
O
O
O
O
N O
T- O
N
00
r
C
(C
a
L
co
1+fD O
O
O O
r �
(B cD o
O p co
LO Cl
O It
I �
i
W
y c
C p
� L
N _ _
0) O
LL O
O
II
cu
N
N W
N
>+
7
U)
Y CD U')
'c
H
L
N
CL o
CL O
O
N
O
T� O
Ll7 O LO O If) O O
�t
It V' � V
(4) uogeAO13
Upper Trinity Study - 22 May 1998
Plan: DE - 10, 50, and 100 -year Plan
11/8/2012
River = Elm Fork Reach = ef3 RS =102686 102686
071 —'045 03
.07
455
0
Legend
5
WS 100 YR
Ground
Ineff
450
•
Bank Sta
445
440
c
435
Ca
w
430
425
420
415
0 2000 4000
6000 8000
10000 12000
Station k1c)
Upper Trinity Study - 22 May 1998 Plan: DE - 10, 50, and 100 -year Plan
11/8/2012
River = Elm Fork Reach = ef3 RS = 101428 101428
.07 '� .045 .045 —�� .03
07
470
M 0 1
Legend
5
WS 100 YR
■
Ground
Ineff
Bank Sta
460
450
c
m
440
a�
w
430
i
420
410
0 2000 4000 6000 8000
10000 12000
Station (ft)
Upper Trinity Study - 22 May 1998 Plan: BE - 10, 50, and 100 -year Plan 11/8/2012
River = Elm Fork Reach = ef3
RS =99708 99708
1- 055 � 0 � .045 �F
.03 �<— .09 �� 07
460
5
Legend
WS 100 YR
N
Ground
Ineff
Bank Sta
450
440
c
O
N
L
430
420
410
0 2000 4000 6000
8000 10000
12000
Station (ft)
� }o
C � Cl)
O!
�
O
C � C
J
O
O
m
�
O
O
O
O
N
N
O
N
�
o
c
oO
d
o
o
�
L
(0
N
O co
O CO
rn
'p
C �
(U 00
O co
-
o
ii
rn
°
o
O to
m
W w
d �
c n
�
o
(0
C,)0
U)
Y
U-
O
CO
W
II
8�
8
cc
N �
N
o<tLo
7
U)
Oo
�
0
•L
r
L
d
Q
�
C7
C?
Cl-
i
C)
N
O
O
co LO O �O O O O_
d
V V
(4) UOIIBA913
O!
�
O
C � C
J
�`
m
�
Upper Trinity Study - 22 May 1998 Plan: DE - 10, 50, and 100 -year Plan 11/8/2012
River = Elm Fork Reach = ef3 RS = 97919 97919
> --� .05 . .045 ---.1 .07
'I
455
.07
0'1
Legend
5
WS 100 YR
■
Ground
A
Ineff
450
-Bank Sta
445
440
c
435
Cu
a�
w
430
425
420
415
0 2000 4000 6000 8000 10000
12000 14000
Station (ft)
Upper Trinity Study - 22 May 1998 Plan: DE - 10, 50, and 100 -year Plan 11/8/2012
River = Elm Fork Reach = ef3 RS = 97178 97178
.1 .05 — .08 —�—.07 �
09 7 12 —�0�—
455
.045
Legend
5
WS 100 YR
■
Ground
450
A
Ineff
Bank Sta
445
440
x
c
435
a�
w
430
425
i
420
415
0 2000 4000 6000 8000 10000 12000
14000
Station (ft)
Upper Trinity Study - 22 May 1998 Plan: DE - 10, 50, and 100 -year Plan 11/8/2012
River = Elm Fork Reach = ef3 RS =93940 93940
07 12 — .07� . .06
455
0
Legend
5
WS 100 YR
■
Ground
Ineff
450
�
Bank Sta
445
440
c
435
a�
w
430
425
i
420
415
0 2000 4000 6000 8000 10000 12000
14000
Station (ft)
Upper Trinity Study - 22 May 1998 Plan: DE - 10, 50, and 100 -year Plan 11/8/2012
River ='Elm Fork Reach = ef3 RS = 93359 93359
.07
.12 '�' .045 +035 .045
450
5
Legend
WS 100 YR
Ground
Ineff
445
Bank Sta
440
435
0
w
430
425
420
415
2000
4000 6000 8000 10000 12000
14000
Station (ft)
Upper Trinity Study - 22 May 1998
Plan: DE - 10, 50, and 100 -year Plan 11/8/2012
River = Elm Fork Reach = ef3 RS = 93297
Section 93297 - Upstream bounding cross section for Sandy Lake R
.035
1 — .035
460-
3
Legend
WS 100 YR
t
Ground
i
Ineff
•
Bank Sta
450
440
c
0
Z6
>
a�
W
430
420
410
2000
4000 6000
8000 10000 12000
14000
Station (ft)
460
Upper Trinity Study - 22 May 1998 Plan: DE - 10,
River = Elm Fork Reach = ef3 RS = 93254.5 BR
--
50, and 100 -year Plan 11/8/2012
Bridge # 17 - Sandy Lake Road
.035
3 Legend
.035
WS 100 YR
■
Ground
A
Ineff
•
Bank Sta
450
440
c
0
>
0
Lu
430
420
i
410
2000 4000 6000 8000 10000 12000 14000
Station (ft)
460-
Upper Trinity Study - 22 May 1998
River = Elm Fork Reach = ef3
Plan: DE - 10,
RS = 93254.5 BR
50, and 100 -year Plan 11/8/2012
Bridge # 17 - Sandy Lake Road
.045
0
Legend
.045
WS 100 YR
Ground
Ineff
•
Bank Sta
450
440
c
0
a>
w
430
420
410
2000
4000 6000
8000
10000 12000
14000
Station (ft)
Upper Trinity Study - 22 May 1998
Plan: DE - 10, 50, and 100 -year Plan 11/8/2012
River = Elm Fork Reach = ef3 RS = 93212
Section 93212 - Downstream bounding cross section for Sandy Lake
045
- 045
460
0
Legend
5
WS 100 YR
■
Ground
A
Ineff
•
Bank Sta
450
440
c
0
>
a>
W
430
420
410
2000
4000 6000
8000 10000 12000
14000
Station (ft)
Upper Trinity Study - 22 May 1998 Plan: DE - 10, 50, and 100 -year Plan 11/8/2012
River = Elm Fork Reach = ef3 RS = 93197 93197
07� .05 .12 '�.065�� .0450 .05
470
Legend
5
WS 100 YR
■
Ground
Ineff
•
Bank Sta
460
450
c
440
w
430
i
420
410
0 2000 4000 6000 8000 10000 12000
14000
Station (ft)
Upper Trinity Study - 22 May 1998 Plan: DE - 10, 50, and 100 -year Plan 11/8/2012
River = Elm Fork Reach = ef3 RS = 93196
93196
07-- .05�� —.12 '.065 .045
O .05
465
Legend
2
WS 100 YR
}
Ground
A
Ineff
460
Bank Sta
455
450
x
C
0
C6
Lu
445
440
435
430
0 2000 4000 6000 8000
10000 12000
14000
Station (ft)
Upper Trinity Study - 22 May 1998 Plan: DE - 10, 50, and 100 -year Plan 11/8/2012
River = Elm Fork Reach = ef3 RS = 93191
93191
•07 �� .05 - -- .12 �_ 065 .045
05
465
0
2
Legend
WS 100 YR
Ground
Ineff
460
Bank Sta
455
450
c
0
Lu
445
440
i
435
430
0 2000 4000 6000 8000
10000 12000
14000
Station (ft)
HEC -RAS Plan: CE 10-100 Locafions: User Defined
HEC -RAS Plan: CE -500 Locations: User Defined Profile: 500 YR
Upper Trinity Study - 22 May 1998 Plan: 10, 50, and 100 Year Corrected Effective 6/15/2012
River = Elm Fork Reach = ef3 RS =110074 110074
04 f�?0�4 �� .04- .05 �� .04 .09 .03
460
Legend
WS 100 YR
M
Ground
455
Ineff
•
-
Bank Sta
450
445
c
440
m
w
435
430
i
425
420
2000
3000
4000 5000 6000 7000
8000
Station (ft)
Upper Trinity Study - 22 May 1998 Plan: 10, 50, and 100 Year Corrected Effective 6/15/2012
River = Elm Fork Reach = ef3 RS =109445 109445
.04
.12 .05 1 �— .03 — .12 —� 0 -- .12 >Ir03�
460
2 6
Legend
WS 100 YR
a
Ground
,
Ineff
455-
•
Bank Sta
450
445
c
m
440
CD
Lu
435
430
i
425
420
1000
2000 3000 4000 5000
6000
Station (ft)
Upper Trinity Study - 22 May 1998
Plan: 10, 50, and 100 Year Corrected Effective 6/15/2012
River = Elm Fork Reach = ef3 RS = 107964 107964
04�.12�� --.05� .1
� .06
460
Legend
WS 100 YR
Ground
A
Ineff
455
•
Bank Sta
450
445
c
440
Lu
435
430
425
420
1000 2000 3000
4000 5000
6000
Station (ft)
460
450
Upper Trinity Study - 22 May 1998 Plan: 10, 50, and 100 Year Corrected Effective
River = Elm Fork Reach = ef3 RS = 106657 106657
•06� . x—.12 .06
5
6/15/2012
i
Legend
WS 100 YR
Ground
Ineff
•
Bank Sta
Y
c
440
w
430
420
0 1000 2000 3000 4000 5000
6000
7000
Station (ft)
Upper Trinity Study - 22 May 1998 Plan: 10, 50, and 100 Year Corrected Effective 6/15/2012
River = Elm Fork Reach = ef3 RS = 105936 105936
06 �
�'12 .06
460
0
Legend
5
WS 100 YR
N
Ground
Ineff
•
Bank Sta
450
440
c
0
(D
w
430
420
i
410
1000
2000
3000 4000 5000 6000 7000 8000
9000
Station (ft)
Upper Trinity Study - 22 May 1998 Plan: 10, 50, and 100 Year Corrected Effective 6/15/2012
River = Elm Fork Reach = ef3 RS = 105167 105167
—.07 .12 06
_I
455
0
Legend
5
WS 100 YR
F
Ground
450
A
Ineff
•
Bank Sta
i
445
440
c
•0
435
a�
w
430
425
420
415
0 2000 4000 6000 8000
10000
Station (ft)
Upper Trinity Study - 22 May 1998 Plan:10, 50, and 100 Year Corrected Effective 6/15/2012
River = Elm Fork Reach = ef3 RS = 102686
102686
07 �1 � '045 .03
.07
455
0
Legend
5
WS 100 YR
Ground
450
Ineff
•
Bank Sta
445
440
m
435
w
430
425
420
415
0 2000 4000 6000
8000 10000
12000
Station (ft)
Upper Trinity Study - 22 May 1998 Plan: 10, 50, and 100 Year Corrected Effective 6/15/2012
River = Elm Fork Reach = ef3 RS = 101428 101428
.07 .045 —� I . �— .045 —J� .03 .07
'I
470
f 0
Legend
5
WS 100 YR
■
Ground
Ineff
•
Bank Sta
460
i
450
c
440
a'>
w
430
420
i
410
0 2000 4000 6000 8000 10000
12000
Station (ft)
Upper Trinity Study - 22 May 1998 Plan: 10, 50, and 100 Year Corrected Effective 6/15/2012
River = Elm Fork Reach = ef3 RS = 99708 99708
055 �— .045 ),� — .03 .09 07 '�
0
460
Legend
5
WS 100 YR
■
Ground
A
Ineff
•
Bank Sta
450
440
c
0
Z5
w
430
420
410
0 2000 4000 6000 8000 10000
12000
Station (ft)
Upper Trinity Study - 22 May 1998 Plan: 10, 50, and 100 Year Corrected Effective 6/15/2012
River = Elm Fork Reach = ef3 RS = 98884 98884
.05 01.�— .045 �— .03 — .09 — .07
460
Legend
4
5
WS 100 YR
F
Ground
Ineff
•
Bank Sta
450
440
c
0
(D
w
430
420
i
410
0 2000 4000 6000 8000 10000 12000
14000
Station (ft)
Upper Trinity Study - 22 May 1998 Plan: 10, 50, and 100 Year Corrected Effective
6/15/2012
River = Elm Fork Reach = ef3 RS =97919 97919
.05— .045 --.1 —� 07
'I
455
.07
101
Legend
5
WS 100 YR
F
Ground
A
Ineff
450
0
Bank Sta
445
l� I jj
440
c
.°
435
w
430
425
i
420
415
0 2000 4000 6000 8000
10000 12000
Station (ft)
Upper Trinity Study - 22 May 1998 Plan: 10, 50, and 100 Year Corrected Effective 6/15/2012
River = Elm Fork Reach = ef3 RS = 97792
.07 .05 —� '045 — .1 .07
455
1 0 1
Legend
5
Ground
i
Ineff
•
Bank Sta
450
445
440
c
m
435
(D
Lu
430
425
420
415
0 2000 4000 6000 8000 10000
12000
Station (ft)
Upper Trinity Study - 22 May 1998 Plan: 10, 50, and 100 Year Corrected Effective 6115/2012
River = Elm Fork Reach = ef3 RS =96997 96997
.09 .12 —� O � .045 –� .1 � .05 �– .08 .07 >�
460
Legend
5
F
Ground
A
Ineff
•
Bank Sta
450
i
/I
440
i-�
c
0
a�
w
430
420
410
0 2000 4000 6000 8000 10000 12000
14000
Station (ft)
Upper Trinity Study - 22 May 1998 Plan: 10, 50, and 100 Year Corrected Effective 6/15/2012
River = Elm Fork Reach = ef3 RS = 93940 93940
it .07 _� .12 'I .07
F 06
455
O
Legend
5
WS 100 YR
t
Ground
450
A
Ineff
•
Bank Ste
445
440
c
435
?
w
430
425
i
420
415
0 2000 4000 6000 8000 10000 12000
14000
Station (ft)
Upper Trinity Study - 22 May 1998 Plan: 10, 50, and 100 Year Corrected Effective 6/15/2012
River = Elm Fork Reach = ef3 RS =93359 93359
07 .12 -L .045 � .035 O .045
450
Legend
5
WS 100 YR
Ground
A
Ineff
445
Bank Sta
440
435
c
0
Lu
430
425
420
i
415
2000
4000 6000 5000 10000 12000
14000
Station (ft)
Upper Trinity Study - 22 May 1998 Plan: 10, 50, and 100 Year Corrected Effective 6/15/2012
River = Elm Fork Reach = ef3 RS = 93297 Section 93297 - Upstream bounding cross section for Sandy Lake R
.035 L .035
460-
3
Legend
WS 100 YR
—0 —
Ground
Ineff
•
Bank Sta
450
440
Ali
c
0
m
W
430
420
i
410
2000
4000 6000 8000 10000 12000
14000
Station (ft)
Upper Trinity Study - 22 May 1998 Plan: 10, 50, and 100 Year Corrected Effective 6/15/2012
River = Elm Fork Reach = ef3 RS = 93254.5 BR Bridge # 17 - Sandy Lake Road
.035 .035
460
3
Legend
WS 100 YR
■
Ground
Ineff
•
Bank Sta
450
440
c
0
CD
W
430
420
i
i
410
2000
4000 6000 8000 10000 12000
14000
Station (ft)
Upper Trinity Study - 22 May 1998 Plan: 10, 50, and 100 Year Corrected Effective 6/15/2012
River = Elm Fork Reach = ef3 RS = 93254.5 BR Bridge # 17 - Sandy Lake Road
.045 J .045
460
0�
5
Legend
WS 100 YR
t
Ground
A
Ineff
Bank Sta
450
i
440
c
0
a�
w
430
420
r
410
2000
4000 6000 8000 10000 12,000
14000
Station (ft)
Upper Trinity Study - 22 May 1998 Plan: 10, 50, and 100 Year Corrected Effective 6/15/2012
River = Elm Fork Reach = ef3 RS = 93212 Section 93212 - Downstream bounding cross section for Sandy Lake
.045 -1 ' .045
460
01-
5
Legend
WS 100 YR
■
Ground
A
Ineff
•
Bank Sta
450
440
0
a�
W
430
420
410
2000
4000 6000 8000 10000 12000
14000
Station (ft)
Upper Trinity Study - 22 May 1998 Plan: 10, 50, and 100 Year Corrected Effective 6/15/2012
River = Elm Fork Reach = ef3 RS = 93197 93197
470
� • 07 — .05 —�� .12 � �— .065 .045 -. .05 OF
5
Legend
WS 100 YR
Ground
A
Ineff
•
460
Bank Sta
i
450
c
440
cc
w
430
420
410
0 2000 4000 6000 8000 10000 12000
14000
Station (ft)
Upper Trinity Study - 22 May 1998 Plan: 10, 50, and 100 Year Corrected Effective 6/15/2012
River = Elm Fork Reach = ef3 RS = 93196
93196
465
•07 ��- .05 —�� .12 .065 .045
O .05
2
Legend
WS 100 YR
Ground
Ineff
460
0
Bank Sta
455
450
c
0
.6
a>
W
445
440
435
R
430
0 2000 4000 6000 8000
10000 12000
14000
Station (ft)
Upper Trinity Study - 22 May 1998 Plan: 10, 50, and 100 Year Corrected Effective 6/15/2012
River = Elm Fork Reach = ef3 RS = 93191 93191
465
.07 —�� .05 —��— .12 .065 — .045 O .05
2
Legend
WS 100 YR
— 0
Ground
Ineff
460
•
Bank Sta
455
450
c
0
w
445
440
435
--
430
0
2000 4000 6000 8000 10000 12000
14000
Station (ft)
HEC -RAS Plan: Post 10-100 Locations: User Defined
Jpper Trinity Study - 22 May 1998 Plan: 10, 50, and 100 Year Post - Project 6/15/2012
River = Elm Fork Reach = ef3 RS = 110074 110074
04 04 P�� .04 �E— .05 �� .04 .09 +_ 03
Legend
WS 100 YR
Ground
Ineff
•
Bank Sta
4000 5000 6000 7000 8000
Station (ft)
Jpper Trinity Study - 22 May 1998 Plan: 10, 50, and 100 Year Post - Project 6/15/2012
River = Elm Fork Reach = ef3 RS = 109445 109445
Legend
WS 100 YR
M—
Ground
Ineff
•
Bank Sta
2000 3000 4000 5000 6000
Station (ft)
)pper Trinity Study - 22 May 1998 Plan: 10, 50, and 100 Year Post - Project 6/15/2012
River = Elm Fork Reach = ef3 RS = 107964 107964
05 'IF
1
.06
2000 3000 4000 5000
Station (ft)
Legend
WS 100 YR
Ground
A
Ineff
•
Bank Sta
6000
Jpper Trinity Study - 22 May 1998 Plan: 10, 50, and 100 Year Post - Project 6/15/2012
River = Elm Fork Reach = ef3 RS = 106657 106657
.� x—.12
5
.06 J
Legend
WS 100 YR
Ground
A
Ineff
•
Bank Sta
2000 3000 4000 5000 6000 7000
Station (ft)
Jpper Trinity Study - 22 May 1998 Plan: 10, 50, and 100 Year Post - Project 6/15/2012
River = Elm Fork Reach = ef3 RS = 1.05936 105936
12 —.06 _I
Legend
WS 100 YR
- Ground
Ineff
0
Bank Sta
3000 4000 5000 6000 7000 8000 9000
Station (ft)
Jpper Trinity Study - 22 May 1998 Plan: 10, 50, and 100 Year Post - Project 6/15/2012
River = Elm Fork Reach = ef3 RS = 105167 105167
)7___� 0�.12
5
.06
2000
4000
Station (ft)
6000
8000
Legend
WS 100 YR
Ground
-I neff
•
Bank Sta
10000
Jpper Trinity Study - 22 May 1998 Plan: 10, 50, and 100 Year Post - Project 6/15/2012
River = Elm Fork Reach = ef3 RS = 102686 102686
�1 0 � .045 .03 .07
r,
Legend
WS 100 YR
t
Ground
Ineff
Bank Sta
4000 6000 8000 10000 12000
Station (ft)
Jpper Trinity Study - 22 May 1998 Plan: 10, 50, and 100 Year Post - Project
River = Elm Fork Reach = ef3 RS = 101428 101428
.045 T O 1 .045 — 03
f5
6/15/2012
.07
4000 6000 8000
Station (ft)
10000
Legend
WS 100 YR
Ground
-A
Ineff
•
Bank Sta
12000
Jpper Trinity Study - 22 May 1998 Plan: 10, 50, and 100 Year Post - Project 6/15/2012
River = Elm Fork Reach = ef3 RS = 99708 99708
—.055 n .045 � -.03 .09 07
Legend
WS 100 YR
—w
Ground
Ineff
Bank Sta
4000 6000 8000 10000 12000
Station (ft)
)pper Trinity Study - 22 May 1998 Plan: 10, 50, and 100 Year Post - Project 6/15/2012
River = Elm Fork Reach = ef3 RS = 98884 98884
—.05 ���— .045 - .03 —+— .09 .07
Legend
WS 100 YR
—t—
Ground
A
Ineff
•
Bank Sta
4000 6000 8000 10000 12000 14000
Station (ft)
'pper Trinity Study - 22 May 1998 Plan: 10, 50, and 100 Year Post - Project 6/15/2012
River = Elm Fork Reach = ef3 RS = 97919 97919
III -1 .05 101 .045 — — .1 —�F .07 �-1110 � .07
5 7
4000 6000 8000 10000
Station (ft)
Legend
WS 100 YR
■
Ground -
A
Ineff
•
Bank Sta
12000
Ipper Trinity Study - 22 May 1998 Plan: 10, 50, and 100 Year Post - Project 6/15/2012
River = Elm Fork Reach = ef3 RS = 97792
.05 1 0 1 045 --+— .1 --�� .07 O .07
5 3
4000 6000 8000 10000 12000
Station (ft)
Legend
t
Ground
•
Ineff - -
•
Bank Sta
1pper Trinity Study - 22 May 1998 Plan: 10, 50, and 100 Year Post - Project 6/15/2012
River = Elm Fork Reach = ef3 RS = 96997 96997
�T .12 —� O— 045 —.1— .05 .OS 07
5
Legend
Ground
Ineff - -
Bank Sta
4000 6000 8000 10000 12000 14000
Station (ft)
)pper Trinity Study - 22 May 1998 Plan: 10, 50, and 100 Year Post - Project 6/15/2012
River = Elm Fork Reach = ef3 RS = 93940 93940
07 -F 12-- .o7 ----�O os
R
Legend
WS 100 YR
■
Ground
Ineff
•
Bank Sta
4000 6000 8000 10000 12000 14000
Station (ft)
Jpper Trinity Study - 22 May 1998 Plan: 10, 50, and 100 Year Post - Project 6/15/2012
River = Elm Fork Reach = ef3 RS = 93359 93359
.12 '�' .045 .035 .045
OF
5
Legend
WS 100 YR
—i-
Ground
Ineff
•
Bank Sta
6000 8000 10000 12000 14000
Station (ft)
1pper Trinity Study - 22 May 1998 Plan: 10, 50, and 100 Year Post - Project 6/15/2012
fiver = Elm Fork Reach = ef3 RS = 93297 Section 93297 - Upstream bounding cross section for Sandy Lake R
Legend
WS 100 YR
Ground>
i
Ineff
•
Bank Sta
6000 8000 10000 12000 14000
Station (ft)
1pper Trinity Study - 22 May 1998 Plan: 10, 50, and 100 Year Post - Project 6/15/2012
River = Elm Fork Reach = ef3 RS = 93254.5 BR Bridge # 17 - Sandy Lake Road
Legend
WS 100 YR
Ground
Ineff
•
Bank Sta
6000 8000 10000 12000 14000
Station (ft)
Jpper Trinity Study - 22 May 1998 Plan: 10, 50, and 100 Year Post - Project 6/15/2012
River = Elm Fork Reach = ef3 RS = 93254.5 BR Bridge # 17 - Sandy Lake Road
WS 100 YR
Ground
Ineff
•
Bank Sta
6000 8000 10000 12000 14000
Station (ft)
)pper Trinity Study - 22 May 1998 Plan: 10, 50, and 100 Year Post - Project 6/15/2012
'ver = Elm Fork Reach = ef3 RS = 93212 Section 93212 - Downstream bounding cross section for Sandy Lake
Legend
WS 100 YR
Ground -
Ineff
•
Bank Sta
6000 8000 10000 12000 14000
Station (ft)
1pper Trinity Study - 22 May 1998 Plan: 10, 50, and 100 Year Post - Project 6/15/2012
River = Elm Fork Reach = ef3 RS = 93197 93197
.05 .12 —�– .065 � .045 -�0 .05
5
4000 6000 8000 10000 12000
Station (ft)
Legend`
WS 100 YR
t
Ground
A
Ineff
•
Bank Sta
14000
Jpper Trinity Study - 22 May 1998 Plan: 10, 50, and 100 Year Post - Project 6/15/2012
River = Elm Fork Reach = ef3 RS = 93196 93196
.05 - F .12 065 — .045 0 .05
2
4000 6000 8000 10000 12000
Station (ft)
Legend
WS 100 YR
Ground
Ineff
•
Bank Sta
14000
Jpper Trinity Study - 22 May 1998 Plan: 10, 50, and 100 Year Post - Project
River = Elm Fork Reach = ef3 RS = 93191 93191
— .05 >1* —.12 065 .045 O
2
6/15/2012
.05
4000 6000 8000 10000 12000
Station (ft)
Legend
WS 100 YR
Ground
•
Ineff
•
Bank Sta
14000
HEC -RAS Plan: DE - FW Locations: User Defined
HEC -RAS Plan: CE -FW Locations: User Defined
Plan: PostProject -FW Locations: User Defined
U.S. DEPARTMENT OF HOMELAND SECURITY
FEDERAL EMERGENCY MANAGEMENT AGENCY
OVERVIEW & CONCURRENCE FORM
PAPERWORK BURDEN DISCLOSURE NOTICE
O.M.B No. 1660 -0016
Expires February 28, 2014
Public reporting burden for this form is estimated to average 1 hours per response. The burden estimate includes the time for reviewing instructions,
searching existing data sources, gathering and maintaining the needed data, and completing, reviewing, and submitting the form. You are not required
to respond to this collection of information unless it displays a valid OMB control number. Send comments regarding the accuracy of the burden
estimate and any suggestions for reducing this burden to: Information Collections Management, Department of Homeland Security, Federal Emergency
Management Agency, 1800 South Bell Street, Arlington, VA 20958 -3005, Paperwork Reduction Project (1660- 0016). Submission of the form is required
to obtain or retain benefits under the National Flood Insurance Program. Please do not send your completed survey to the above address.
PRIVACY ACT STATEMENT
AUTHORITY: The National Flood Insurance Act of 1968, Public Law 90 -448, as amended by the Flood Disaster Protection Act of 1973, Public Law 93-
234.
PRINCIPAL PURPOSE(S): This information is being collected for the purpose of determining an applicant's eligibility to request changes to National
Flood Insurance Program (NFIP) Flood Insurance Rate Maps (FIRM).
ROUTINE USE(S): The information on this form may be disclosed as generally permitted under 5 U.S.0 § 552a(b) of the Privacy Act of 1974, as
amended. This includes using this information as necessary and authorized by the routine uses published in DHS /FEMA/NFIP /LOMA -1 National Flood
Insurance Program (NFIP); Letter of Map Amendment (LOMA) February 15, 2006, 71 FR 7990.
DISCLOSURE: The disclosure of information on this form is voluntary; however, failure to provide the information requested may delay or prevent
FEMA from processing a determination regarding a requested change to a (NFIP) Flood Insurance Rate Maps (FIRM).
A. REQUESTED RESPONSE FROM DHS -FEMA
This request is for a (check one):
® CLOMR: A letter from DHS -FEMA commenting on whether a proposed project, if built as proposed, would justify a map revision, or
proposed hydrology changes (See 44 CFR Ch. 1, Parts 60, 65 & 72).
❑ LOMR: A letter from DHS -FEMA officially revising the-current NFIP map to show the changes to floodplains, regulatory floodway or flood
elevations. (See 44 CFR Ch. 1, Parts 60, 65 & 72)
B. OVERVIEW
IP map panel(s) affected for all impacted communities is (are):
No.
Community Name
State
Map No.
Panel No.
Effective Date
0301
City of Katy
TX
48473C
0005D
02/08/83
0287
Harris Coun
TX
48201 C
0220G
09/28/90
City of Coppell
TX
48113C
0155J
08/23/01
F
ding Source: Elm Fork of the Trinity River
s of Flooding: ® Riverine ❑ Coastal ❑ Shallow Flooding (e.g., Zones AO and AH)
❑ Alluvial fan ❑ Lakes ❑ Other (Attach Description)
Name /Identifier: Blackberry Farms
4. FEMA zone designations affected: AE :,X (choices: A, AH, AO, Al -A30, A99, AE, AR, V, V1 -V30, VE, B, C, D, X)
5. Basis for Request and Type of Revision:
a. The basis for this revision request is (check all that apply)
® Physical Change ® improved Methodology /Data ® Regulatory Floodway Revision ❑ Base Map Changes
❑ Coastal Analysis ® Hydraulic Analysis ❑ Hydrologic Analysis ❑ Corrections
❑ Weir -Dam Changes ❑ Levee Certification ❑ Alluvial Fan Analysis ❑ Natural Changes
® New Topographic Data ❑ Other (Attach Description)
Note: A photograph and narrative description of the area of concern is not required, but is very helpful during review.
FEMA Form 086 -0 -27, (2/2011) Previously FEMA Form 81 -89 MT -2 Form 1 Page 1 of 3
b. The area of revision encompasses the following structures (check all that apply)
Structures: ❑ Channelization ❑ Levee /Floodwall ❑ Bridge /Culvert
El Dam ❑ Fill ❑ Other (Attach Description)
16. ❑ Documentation of ESA compliance is submitted (required to initiate CLOMR review). Please refer to the instructions for more information.
C. REVIEW FEE
Has the review fee for the appropriate request category been included? ® Yes Fee amount: $4400
❑ No, Attach Explanation
Please see the DHS -FEMA Web site at http: / /www.fema.gov /plan /prevent/fhm /frm_fees.shtm for Fee Amounts and Exemptions.
D. SIGNATURE
All documents submitted in support of this request are correct to the best of my knowledge. I understand that any false statement may be punishable by
fine or imprisonment under Title 18 of the United States Code, Section 1001.
Name: Jacob S. Lesue, PE, CFM
Company: O'Brien Engineering, Inc.
Mailing Address:
Daytime Telephone No.: 972 - 233 -2288
Fax No.: 972 - 233 -2818
14900 Landmark Blvd., suite 530
E -Mail Address: jlesue@obrieneng.com
Dallas, Texas 75254
Signature of Requester (required): ��—� c
Date:
As the community official responsible for floodplain management, I hereby acknowledge that we have received and reviewed this Letter of Map Revision
(LOMB) or conditional LOMB request. Based upon the community's review, we find the completed or proposed project meets or is designed to meet all
of the community floodplain management requirements, including the requirements for when fill is placed in the regulatory floodway, and that all
necessary Federal, State, and local permits have been, or in the case of a conditional LOMB, will be obtained. For Conditional LOMR requests, the
applicant has documented Endangered Species Act (ESA) compliance to FEMA prior to FEMA's review of the Conditional LOMR application. For
LOMR requests, I acknowledge that compliance with Sections 9 and 10 of the ESA has been achieved independently of FEMA's process. For actions
authorized, funded, or being carried out by Federal or State agencies, documentation from the agency showing its compliance with Section 7(a)(2)
of the ESA will be submitted. In addition, we have determined that the land and any existing or proposed structures to be removed from the SFHA are
or will be reasonably safe from flooding as defined in 44CFR 65.2(c), and that we have available upon request by FEMA, all analyses and
documentation used to make this determination.
Community Official's Name and Title: Kenneth M. Griffin, PE, CFM, Director of Engineering
Community Name: City of Coppell
Mailing Address:
Daytime Telephone No.: (972) 304 -3686
Fax No.: (972) 304 -3570
255 Parkway Blvd
Coppell, Texas 75019
E -Mail Address: kgriffin@ci.coppell.tx.us
Community Official's Signature (required):
Date:
CERTIFICATION 13Y REGISTERED PROFESSIONAL ENGINEER AND /OR LAND SURVEYOR
This certification is to be signed and sealed by a licensed land surveyor, registered professional engineer, or architect authorized by law to certify
elevation information data, hydrologic and hydraulic analysis, and any other supporting information as per NFIP regulations paragraph 65.2(b) and as
described in the MT -2 Forms Instructions. All documents submitted in support of this request are correct to the best of my knowledge. I understand that
any false statement may be punishable by fine or imprisonment under Title 18 of the United States Code, Section 1001.
Certifier's Name: Jacob S. Lesue, PE, CFV1
License No.: 100352
Expiration Date: 9/30/13
Company Name: O'Brien Engineering, Inc.
Telephone No.: 972 - 233 -2288
Fax No.: 972 - 233 -2818
Signature: buy i
Date: // e+ lz_
E Mail Address: jlesue@obrieneng.com
FEMA Form 086 -0 -27, (2/2011) Previously FEMA Form 81 -89 MT -2 Form 1 Page 2 of 3
are appropriate to your revision request are included in your submittal.
Form Name and (Number)
Required if ...
® Riverine Hydrology and Hydraulics Form (Form 2)
New or revised discharges or water - surface elevations
❑ Riverine Structures Form (Form 3)
Channel is modified, addition /revision of bridge/culverts,
addition /revision of levee /floodwall, addition /revision of dam
❑ Coastal Analysis Form (Form 4)
New or revised coastal elevations
❑ Coastal Structures Form (Form 5)
Addition /revision of coastal structure
❑ Alluvial Fan Flooding Form (Form 6)
Flood control measures on alluvial fans
y�r'�� �'•gd'`ld
..............................
JACOB LESUr
100352 :',Q
FEMA Form 086 -0 -27, (2/2011) Previously FEMA Form 81 -89 MT -2 Form 1 Page 3 of 3
U.S. DEPARTMENT OF HOMELAND SECURITY
FEDERAL EMERGENCY MANAGEMENT AGENCY O.M.B No. 1660-0016
RIVERINE HYDROLOGY & HYDRAULICS FORM Expires February 28, 2014
PAPERWORK BURDEN DISCLOSURE NOTICE
Public reporting burden for this form is estimated to average 3.5 hours per response. The burden estimate includes the time for reviewing instructions,
searching existing data sources, gathering and maintaining the needed data, and completing, reviewing, and submitting the form. You are not
required to respond to this collection of information unless a valid OMB control number appears in the upper right corner of this form. Send comments
regarding the accuracy of the burden estimate and any suggestions for reducing this burden to: Information Collections Management, Department of
Homeland Security, Federal Emergency Management Agency, 1800 South Bell Street, Arlington VA 20958 -3005, Paperwork Reduction Project
(1660- 0016). Submission of the form is required to obtain or retain benefits under the National Flood Insurance Program. Please do not send your
completed survey to the above address.
PRIVACY ACT STATEMENT
AUTHORITY: The National Flood Insurance Act of 1968, Public Law 90 -448, as amended by the Flood Disaster Protection Act of 1973, Public Law
93 -234.
PRINCIPAL PURPOSE(S): This information is being collected for the purpose of determining an applicant's eligibility to request changes to National
Flood Insurance Program (NFIP) Flood Insurance Rate Maps (FIRM).
ROUTINE USE(S): The information on this form may be disclosed as generally permitted under 5 U.S.0 § 552a(b) of the Privacy Act of 1974, as
amended. This includes using this information as necessary and authorized by the routine uses published in DHS /FEMA/NFIP /LOMA -1 National
Flood Insurance Program (NFIP); Letter of Map Amendment (LOMA) February 15, 2006, 71 FR 7990.
DISCLOSURE: The disclosure of information on this form is voluntary; however, failure to provide the information requested may delay or prevent
FEMA from processing a determination regarding a requested change to a NFIP Flood Insurance Rate Maps (FIRM).
Flooding Source: Elm Fork of the Trinity River
Note: Fill out one form for each flooding source studied
A. HYDROLOGY
1. Reason for New Hydrologic Analysis (check all that apply)
® Not revised (skip to section B) ❑ No existing analysis ❑ Improved data
❑ Alternative methodology ❑ Proposed Conditions (CLOMR) ❑ Changed physical condition of watershed
2. Comparison of Representative 1 %- Annual- Chance Discharges
Location Drainage Area (Sq. Mi.) Effective /FIS (cfs) Revised (cfs)
3. Methodology for New Hydrologic Analysis (check all that apply)
❑ Statistical Analysis of Gage Records ❑ Precipitation/Runoff Model 4 Specify Model:
❑ Regional Regression Equations ❑ Other (please attach description)
Please enclose all relevant models in digital format, maps, computations (including computation of parameters), and documentation to support the
new analysis.
4. Review /Approval of Analysis
If your community requires a regionall, state, or federal agency to review the hydrologic analysis, please attach evidence of approval /review.
5. Impacts of Sediment Transport on Hydrology
Is the hydrology for the revised flooding source(s) affected by sediment transport? ❑ Yes ❑ No
If yes, then fill out Section F (Sediment Transport) of Form 3. If No, then attach your explanation..
FEMA Form 086- 0 -27A, (2/2011) Previously FEMA Form 81 -89 MT -2 Form 2 Page 1 of 3
1. Reach to be Revised
B. HYDRAULICS
Description Cross Section Water- Surface Elevations (ft.)
Effective Proposed/Revised
Downstream Limit* Upstream Section of Sandy 93297 443.47 443.47
Lake Rd
Upstream Limit* 770' north of northern prop 98884 447.66 447.63
hrnindsry
*Proposed /Revised elevations must tie -intro the Effective elevations within 0.5 foot at the downstream and upstream limits of revision.
2. Hydraulic Method/Model Used: HEC -RAS
3. Pre - Submittal Review of Hydraulic Models*
DHS -FEMA has developed two review programs, CHECK -2 and CHECK -RAS, to aid in the review of HEC -2 and HEC -RAS hydraulic models,
respectively. We recommend that you review your HEC -2 and HEC -RAS models with CHECK -2 and CHECK -RAS.
4.
Models Submitted
Duplicate Effective Model*
Corrected Effective Model*
Existing or Pre - Project
Conditions Model
Revised or Post - Project
Conditions Model
File Name: Plan Name:
FEMA.prj Post - Project
Other - (attach description) File Name: Plan Names
* For details, refer to the corresponding section of the instructions.
Floodwav
Natural Run
File Name:
Plan Name:
FEMA.prj
Base Flood Plan
File Name:
Plan Name:
FEMA.prj
Corrected Effective
File Name:
Plan Name:
File Name: Plan Name:
FEMA.prj Post - Project
Other - (attach description) File Name: Plan Names
* For details, refer to the corresponding section of the instructions.
Floodwav
Run
Datum
File Name:
Plan Name:
FEMA.prj
FW Dup Eff
NAVD 88
File Name:
Plan Name:
FEMA.prj
FW Corrected Effecti
NAVD 88
File Name:
Plan Name:
File Name:
Plan Name:
FEMA.prj
FW Post - Project
NAVD 88
File Name:
Plan Name:
® Digital Models Submitted? (Required)
C. MAPPING REQUIREMENTS
A certified topographic work map must be submitted showing the following information (where applicable): the boundaries of the effective, existing,
and proposed conditions 1 %- annual- chance floodplain (for approximate Zone A revisions) or the boundaries of the 1 %- and 0.2 %- annual- chance
floodplains and regulatory floodway (for detailed Zone AE, AO, and AH revisions); location and alignment of all cross sections with stationing control
indicated; stream, road, and other alignments (e.g., dams, levees, etc.); current community easements and boundaries; boundaries of the requester's
property; certification of a registered professional engineer registered in the subject State; location and description of reference marks; and the
referenced vertical datum (NGVD, NAVD, etc.).
® Digital Mapping (GIS /CADD) Data Submitted (preferred)
Topographic Information: On -site on the around survey
Source: Kadleck and Associates Date: January 2012
Accuracy:
Note that the boundaries of the existing or proposed conditions floodplains and regulatory floodway to be shown on the revised FIRM and/or FBFM
must tie -in with the effective floodplain and regulatory floodway boundaries. Please attach a copy of the effective FIRM and /or FBFM, at the same
scale as the original, annotated to show the boundaries of the revised 1 % -and 0.2 %- annual- chance floodplains and regulatory floodway that tie -in with
the boundaries of the effective 1 % -and 0.2 %- annual- chance floodplain and regulatory floodway at the upstream and downstream limits of the area on
revision.
® Annotated FIRM and/or FBFM (Required)
FEMA Form 086- 0 -27A, (2/2011) Previously FEMA Form 81 -89 MT -2 Form 2 Page 2 of 3
D. COMMON REGULATORY REQUIREMENTS"
1. For LOMR/CLOMR requests, do Base Flood Elevations (BFEs) increase?
® Yes ❑ No
a. For CLOMR requests, if either of the following is true, please submit evidence of compliance with Section 65.12 of the NFIP regulations:
The proposed project encroaches upon a regulatory floodway and would result in increases above 0.00 foot compared to pre - project
conditions.
• The proposed project encroaches upon a SFHA with or without BFEs established and would result in increases above 1.00 foot
compared to pre - project conditions.
b. Does this LOMB request cause increase in the BFE and /or SFHA compared with the effective BFEs and/or SFHA? ❑ Yes ❑ No
If Yes, please attach proof of property owner notification and acceptance (if available). Elements of and examples of property owner
notifications can be found in the MT -2 Form 2 Instructions.
12. Does the request involve the placement or proposed placement of fill?
® Yes ❑No
If Yes, the community must be able to certify that the area to be removed from the special flood hazard area, to include any structures or
proposed structures, meets all of the standards of the local floodplain ordinances, and is reasonably safe from flooding in accordance with the
NFIP regulations set forth at 44 CFR 60.3(A)(3), 65.5(a)(4), and 65.6(a)(14). Please seethe MT -2 instructions for more information.
13. For LOMR requests, is the regulatory floodway being revised?
❑ Yes ❑ No
If Yes, attach evidence of regulatory floodway revision notification. As per Paragraph 65.7(b)(1) of the NFIP Regulations, notification is
required for requests involving revisions to the regulatory floodway. (Not required for revisions to approximate 1%-annual-chance floodplains
[studied Zone A designation] unless a regulatory floodway is being established. Elements and examples of regulatory floodway revision
notification can be found in the MT -2 Form 2 Instructions.)
4. For CLOMR requests, please submit documentation to FEMA and the community to show that you have complied with Sections 9 and 10 of the
Endangered Species Act (ESA).
For actions authorized, funded, or being carried out by Federal or State agencies, please submit documentation from the agency showing its
compliance with Section 7(a)(2) of the ESA. Please see the MT -2 instructions for more detail.
* Not inclusive of all aDDlicable reaulatory reauirements. For details, see 44 CFR pails 60 and 65.
FEMA Form 086- 0 -27A, (2/2011) Previously FEMA Form 81 -89 MT -2 Form 2 Page 3 of 3
O'Brien Engineering, Inc.
14900 Landmark Blvd, Ste. 530
Dallas, TX 75254
p 972.233.2288 1 f 972.233.2818
www.obrienenci.com I ftp.obrieneno.com
Texas Firm ID # F-37581 Oklahoma Firm ID # 4962
GSA Schedule Holder GS- OOF -0009X
TXMAS Contract TXMAS -12- 899080
Twenty Five Years of Excellence Since 1987
A Service Disabled Veteran Owned Small Business (SDVOSB)