Loading...
CF-Village-CS 890724 I~)ATE FR~: ~ Investig~e and Report ~ Per Your Request ~ Take A~;opriate ActJ~ ~ Fm Your information ~ P~a;e Reply fo; my S{~natu;e ~ You; Rec~mendat~on -~ ~ Re~ a~ Return ~ R~uest Approv~ For Your ~oval ~st Denied ~ A~ach File and Return ~ignature COMMENTS: change order covers the extra ~e drilled foundation piers to As you are aware, sub-surface it to anticipate and can vary result, Section 0237.7;2.2;A of that the piers be raised or :er suitable stratum for pier ~,~., ~ further state that the Contract , if variances are re~ired. The pump station foundation is supported by a system of 32 drilled piers. The base bid for the project included an estimated 860 lineal feet of 18" diameter drilled piers. A total of 1,156.5 lineal feet was necessary to reach a suitable penetration on the 32 piers. This represents 296.5 lineal feet of ad4itional piers above the base bid quantity (~9.3'/pier avg.). The attached Change Order ~3 in the amount of $8,434.00 reflects the extra ~antity of drilled piers re~ired to achieve the necessa~ penetration. Sufficient funds are available in the project contingencies for this Change Order. We have reviewed this re,est and reco~end that it be approved. If you concur, please fo~ard this Change Order to the City Manager for his consideration and scheduling for the earliest possible City Council approval. If you have any ~estions or need additional info~ation, please contact us. Sincerely, attac~ents I~ cc: Steve Goram H. Wayne Ginn, P.E. File 380 17103 Preston Road ® Suite 100 · LB 118 · Dallas, Texas 75248 · Phone 214/248-4900