Loading...
CF-Village-CS 890714 INC. CONSULTING/ Mr. Russ. yle, P.E., city Engxneer C-Ill/Il City of P.O 75019 Re: Village Rese~oir Dear Mr. Doyle We have been flied by Preload Construction Company, Inc. that a problem has detected with the Thorocoat coating material which was a to the above referenced project. A possible defect in manu~ is causing the material to soften when wet. Beginning the week of July 16, 1989, Preload will be removing the existing Thorocoat coating from the tank and re- applying a new topcoat. This work is being done at no additional cost to the City of Coppell and should not effect ~e anticipated completion date of ~e project. Please contact us if you have any questions regarding this project. Sincerely, San~ord W. Case, P.E. cc: Mike Bush, Preload Construction Company, Inc. Steve Goram H. Wayne Ginn, P.E. J.R. Richardson File 381 17103 Preston Road · Suite I00 · LB 118 · Dallas, Texas 75248 · Phone 214/248-4900 i