Loading...
COS Lutheran-CS 990813FILE To: From: RE: Mike Martin, Asst. City Engineer Doug Stevens, Engineering Technician Glenn Hollowell, Director of Public Works Greg Jones, Chief Building Official Travis Cramp, Fire Marshal Larry Davis, Construction Inspector WALK-THRU for Christ Our Savior Lutheran Church, 140 S. Heart~ Date: August 13, 1999 A final walk-thru for streets, utilities and drainage on the referenced project has been scheduled for Tuesday, August 17, 1999 at 10:00 a.m. If I can be of further assistance please let me know. CC: Lee Stone, Commercial Inspector Kevin Mulligan, RJ Lander Construction (fax: 972-239-1817) pcrocker/subdivsn/christoursavior/walkthru