Loading...
CF-Village-CS 890605 GINN, INC. CONSULTING ENGINEERS June 5, 1989 Mr. Karl r~~chey Cajun C~htractors, Inc. P.O./J~ox 540487 Da~as, Texas 75354-0487 Re: Village Parkway Pump Station City of Coppell, Texas Dear Mr. Hirschey: Attached is the Color and Surface Finish Schedule for the above referenced project. Please note that this schedule includes Mr. Durbin's verbal re-submittal of Armstrong "Excelon" vinyl composition tile which is approved as noted. If you have any questions regarding these selections, please feel free to contact us. Sincerely, SanCord W. Case, P.E. attachment cc: Ned Durbin, Cajun Contractors, Inc. Russell Doyle, P.E., City of Coppell ~/ Steve Goram, City of Coppell David Dillard, Dillard Architects, Inc. H. Wayne Ginn, P.E. Smoky Ginn File 380 17103 Preston Road · Suite 100 · LB 118 · Dallas, Texas 75248 · Phone 214/248-4900 V~.T~GE PARENAY M$1P STATI(~ CITY OF COPP~.L, T~S COLOR SCHEDULE Issued by Ginn Inc. Prepared by D1 ll ard Architects Inc. June 2, 1989 I. INTERIOR SURFACE SCHEDULE FLOOR BASE W~T.T-~ CLG DOORS FRAME WDWS NOTES: FOYER Fi Bi FI C1 P2 P3 NA None H~LT. F2 NA Note C1 NA NA NA 1,2 SWITCHGEAR Fi BI FI FI P2 P3 P3 None OFFICE Fi Bi FI C1 P2 P3 P3 None RESTROOM Fi Bi FI FI P3 P3 NA None CLOSET F2 NA FI C1 P3 P3 NA None STORAGE F2 NA FI FI P3 P3 NA None PUMP ROOM F2 NA Note P4 P3 P3 P3 1,3 II. EXTERIOR SURFACE SCHEDULE COLOR: 1. Fascia, Soffit, & Exterior Wood Trim P4 2. Doors, Frames, Louvers @ Brick, & Downspouts Below Fascia P5 3. Dormers (aLl exposed surfaces) & Vents thru Roof P6 ~. Front Door (not frame) P7 5. Liutels: At Cas~ Stone: match cast stone color Other Locations: match mortar color III. LEG~ FI Vinyl Composition Tile. Armstrong Imperial Texture Excelon Tile, 1/8" Gauge, No. 51890 "Deser~ Tan." F2 Sealed Concrete per Specifications. BT Roppe ~" with cove, #~0 "Fawn." Pi Devoe "Ice Beige" #2H~2G P2 Devoe "Blue Crusader" F2U32B P3 Devoe "Silver Mushroom" #2~2E P~ Devoe "Stream" F2H%IG P5 Devoe "Juno" #1UM33A P6 Devoe "Drake" #2D~OC P7 Devoe "Friars Hood" #1U~17A C1 Lay-in Ceiling per Specifications GIT~ OF 00PP~.T., IEXAS COLOR SCHEDULE June 2, 1989 Page 2 of 2 General Notes: A. Aluminum storefronts, windows, and entrances are not described in the information above. B. Door and frame colors in Section II above describe only surfaces visible to the room indicated. Example: main entry door to be P7 on exterior and P2 on interior. Edge painted to match color on swing side of door. C. ~11 paint types and specifications are to be consistent with Specifications and approved submittals. This document specifies color only. Some color selections may not be avsilable in specified product type for given surfaces; verify with manufacturer and Civil Engineer. Reference Notes: 1. Refer to Supplemental Sketch by Dillard Architects dated 5/24/89 for selection and location of colored glazed masonry units in Pump Room and Ns11. At top of stairs, Hall to be "Beige AE" up to 3'-4" AFF and "Light Astral Blue" to ceiling, i.e. banding pattern described for Pump Room to continue into Ns11 area. 2. Handrails to be painted P2. 3. Pumps and piping to be painted P2. Do not paint electrical equipment. Verify exact surfaces to be painted with Civil Engineer in field.